![](/html/6a/6ad0/6ad00eddb223372e4691193fac6a99e6c7950e8ecab2446b4d5b5f75352a76e6/bg1.png)
Via Bonazzi, 4 - 40013 Castel Maggiore (BO)
Tel. +39 051 700096 (10 linee) - Fax +39 051 700175
info@tecnotelai.it - www.tecnotelai.it
RISKS RELATED TO THE INSTALLATION OF THE SHELF
Entirely made in stainless
steel AISI 304 (EN:
1.4301).
Suitable for cold storage
and food,
pharmaceutical and
chemical sectors.
"
"
"
STAINLESS STEEL BOLT SHELVING SYSTEM
installation, use and maintenance instructions
BEFORE MOUNTING the structure check the floors and floor slabs, they must be in good condition, without holes and
accentuated unevenness and must have an appropriate consistency for the capacity of the uprights. In the case of shelf to
be built on a mezzanine floor it is essential to consult a specialist in order to assess the resistance and the capacity of the
floor.
"
UNLOADING AND STORAGE OF MATERIALS. This must be carried out at a predefined location, away from the risks
arising from any everyday work and contemporary installation of other systems (electricity, water, air conditioning, etc.).
The staff must be informed about the interim storage program, the approach of the material to the area of installation and
realization of the system itself.
"
ASSEMBLY AND INSTALLATION OF SHELF. The staff assigned to this work shall be provided with protective gloves.
The personnel managers must coordinate all phases of movement and installation and ensure that all applicable standards
regarding the health and safety of workers are applied.
BEFORE BEGINNING THE MOUNTING READ CAREFULLY
THE CHAPTER "USE AND MAINTENANCE STANDARDS"
![](/html/6a/6ad0/6ad00eddb223372e4691193fac6a99e6c7950e8ecab2446b4d5b5f75352a76e6/bg2.png)
Via Bonazzi, 4 - 40013 Castel Maggiore (BO)
Tel. +39 051 700096 (10 linee) - Fax +39 051 700175
info@tecnotelai.it - www.tecnotelai.it
UPRIGHTS!
"
"
"
"
ART."
DIMENSIONS"
CAPACITY "
"
(mm)"
"
(kg)"
"
"
S5011"
35x35x2000"
120"
"
"
!
ADJUSTABLE FEET.
They have been inserted at the base of
the uprights.
"
SHELVES. Insert the shelves from the bottom up and for
each use 8 screws TE 6X16 with nut and 16 washers
without tightening.
When the shelving is completed tighten all the nuts.
"
PLAQUES. For each row of shelves, in a prominent
position a plaque must be placed indicating the maximum
capacity of the uprights and shelves.
"
CAPACITIES AND DIMENSIONS
In case of shelves with various spans with single
pillars, capacity is halved.
Always check the overall capacity for each span.
SHELF DIMENSIONS
Add the nominal length of the shelves.
"
S5036
S5041
S5046
S5061
S5066