Technip A0403-01 User Manual

Page 1
:
:
:
:
:
SUPPLIER'S REVISION
0
:
:
PACKAGE DESCRIPTION
:
1,
EQUIPMENT TAG
:
2,
RD CODE :
3,
4,
TO BE ISSUED AS FINAL PROVIDED COMMENTS ARE INCORPORATED.
A0403
NO COMMENT – FINAL ISSUE.
FOR INFORMATION ONLY
NAME:
SIGNATURE:
DATE :
REV
REVISE AND RESUBMIT.
3800-210
WASH OIL FILTER
17-FL-51 A/B
SUPPLIER DOCUMENT REVIEW
PROJECT TITLE
MIDOR REFINARY EXPANSION
PERMISSION TO PROCEED DOES NOT CONSTITUTE ACCEPTANCE OR APPROVAL OF DESIGN DETAILS, CALCULATIONS, ANALYSIS, TEST METHODS OR MATERIALS DEVELOPED OR SELECTED BY SUPPLIER FROM FULL COMPLIANCE WITH CONTRACTUAL OBLIGATIONS.
ENPPI PROJECT NUMBER
SUPPLIER'S OWN DOCUMENT No
DATE
SUPPLIER APPROVAL SIGNATURE
11/02/2020
DOCUMENT TITLE
index for vendor data book
TOTAL No OF PAGES
4
SUPPLIER'S ORDER No
NA
SUPPLIER'S NAME
ASCO FILTRI S.P.A.
PURCHASE ORDER No
3800-210-0841-201-22
BINASCO
(MI) ITALY
VDB-19-3090-002
1
2
3
4
02/03/2020
01/04/2020
20/07/2020
04/11/2020
A0403-01
4
Page 2
VENDOR DATA-BOOK (VDB) - INDEX
A
CLIENT: ENPPI
PROJECT NAME: MIDOR REFINARY EXPANSION
EQUIPMENT: 17-FL-51 A/B
Part DESCRIPTION DOC. REF. PAGE No.
1. ERECTION, OPERATING AND MAINTENANCE INSTRUCTION MANUAL
1.1 General
1.1.1 VDB Index
1.1.2 Process Theory See Attached
1.1.3 Process Description See Attached
1.1.4 Data Sheets
1.1.5 Chemicals, Catalyst Utilities Consumption N/A
RECCOMENDATION FOR TRANSPORTATION, HANDLING AND
1.2 STORAGE
1.3 Erection
1.3.1 List of components to be erected/installed on site N/A
Detailed schedule of the erection including hypothesis taken into
1.3.2 account
1.3.3 Procedures for erection and installation of the equipment See 1.10.1
Filtering Element / Basket Data
A0403
VDB-19-3090-002
Sheet Attached
N/A
N/A
1.3.4 List of connection points detailing location and dimensions N/A
1.3.5 Details of site assembly and field welds N/A
1.3.6 List of special tools for site erection and assembly N/A
1.3.7 Procedures for site assembly, leveling and welding N/A
1.3.8 Welding specifications for field welds N/A
List of checks and tests to be performed on site with SAT (Site
1.3.9
1.4 Pre-commissioning, Commissioning and Start-Up Procedure See 1.10.1
1.5 Normal Operation
1.5.1 Normal Operating Procedure See 1.10.1
1.5.2 Sequence Flow Chart (valve positioning, controls, etc.) N/A
1.5.3 Description of Control System (Functional design Specification) N/A
1.5.4 List of Alarms and Set Points N/A
1.5.5 Program List (logic and ladder diagram, AND/OR, etc.) N/A
1.6 Normal Shutdown Procedure N/A
1.7 Emergency Shutdown Procedure N/A
1.8 Special operation (chemical cleanings, catalyst regeneration, etc…) N/A
cceptance Test) & Site Quality Control Plan
N/A
1.9 Trouble Shooting N/A
Page 3
VENDOR DATA-BOOK (VDB) - INDEX
A
A
A
CLIENT: ENPPI
PROJECT NAME: MIDOR REFINARY EXPANSION
EQUIPMENT: 17-FL-51 A/B
1.10 Maintenance Instructions
1.10.1 Maintenance
1.10.2 Safety Instructions See 1.10.1
General Maintenance
1.10.3
Lubricant table and equivalence
1.10.4
Troubleshooting checks lists and diagrams
1.10.5
1.11 Spare Parts
Consumable for erection, commissioning and start-up
1.11.1
Spare parts for start-up and 2 years operation
1.11.2
Capital spare parts
1.11.3
Sectional drawings with part list numbers
1.11.4
A5010 / A5015 / A5016 / A5001
IOM-19-3090-001
See 1.10.1
N/A
N/A
A5006
CEL-19-3090-001
A5021
SPL-19-3090-001
N/A
N/A
2. DOCUMENTS AND DRAWINGS
General
2.1
Drawing List
2.1.1
Piping & Instrument Diagrams and Process Flow Diagrams with
2.1.2 Material Balance
Plot Plan
2.1.3
Main Equipment
2.2
Data Sheet N/A
2.2.1
2.2.2
2.2.3
2.3
2.3.1
2.3.2
2.3.3
2.3.4
2.4
2.4.1
ssembly Drawing N/A
Calculation Notes
Pressure Vessels
Data Sheet
ssembly Construction Drawings
Sectional Drawings
Nameplate Drawing
Machinery and Other Equipment (Pumps, fans, compressors, etc.)
Data Sheet and/or Expected Performance Curves
A0001
VDL-19-3090-001
N/A
N/A
A1003 CAL-19-3090-001 STC-19-3090-001
A1001 DTS-19-3090-001
A2006/A2001/A1103/
A1112/A1109
AF-C-E032-001
See 2.3.2
See 2.3.2
N/A
2.4.2
2.4.3
ssembly Drawings
Sectional Drawings (with part list)
N/A
N/A
Page 4
VENDOR DATA-BOOK (VDB) - INDEX
A
A
CLIENT: ENPPI
PROJECT NAME: MIDOR REFINARY EXPANSION
EQUIPMENT: 17-FL-51 A/B
ccessories Drawings of Brochures (Mechanical seals, pulsation
dampers,lubricant unit, flushing system, gear reducer, couplings,
2.4.4 etc.)
2.5 Other Equipment
Data sheet and/or Performances Curves
2.5.1
2.5.2
2.6 Piping and Valves
2.6.1
2.6.2
2.6.3
2.6.4
2.6.5
2.7 Instrument and Local Control Panel
ssembly/Sectional Drawings
Piping Classes
Piping and Piping Supports Layout
Valve List
Valves and Accessories Drawings
Flexible Connectors
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Instrument List
2.7.1
Instrument Data Sheet and Brochure
2.7.2
Control Panel Drawing (with internal arrangement and wiring)
2.7.3
Terminal Strip Connection
2.7.4
Instrument Cable List
2.7.5
Instrument/Electrical Equipment Layout and Cable Routing
2.7.6
PLC Manual
2.7.7
Primary Measuring Valves Calculation (PVC, PSV)
2.7.8
Installation Materials
2.7.9
2.8 Electrical Equipment
2.8.1 Electric Motors drawing N/A
2.8.2 Data Sheet N/A
2.8.3 Starting Torque Curves N/A
Power Distribution Panels Drawings (with internal arrangement and
2.8.4 wiring)
2.8.5 Electrical Cable list N/A
2.8.6 Installation Materials N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2.9 Noise Source Data Sheet N/A
Loading...