Systemdek 2-X Owners manual

INSTRUCTION MANUAL
The Systemdek Model IIX
INTRODUCTION
The Systemdek is a two speed belt drive transcription turntable. Top performance can be maintained and satisfaction assured by careful adherence to the assembly and operating instructions.
1.1 IMPORTANT: Read the instructions before proceeding with further unpacking.
1.2 Remove the top packing to allow removal of cover and other accessories.
1.3 Remove further packing to expose turntable.
1.4 Remove turntable from carton and prepare for assembly.
1.5 Remove drive hub packing and place carefully to one side.
2. IMPORTANT INSTRUCTIONS
2.1 Please ensure that the main bearing does not become contaminated by dust or other foreign matter.
Do not attempt to dismantle any part of the turntable, as it is set during production to provide optimum
2.2
performance.
3. ASSEMBLY
3.1 Fit bearing housing and fix in position by means of the screws provided.
3.2 Inject oil into the bearing housing using the full measured amount '.8 ml' in the syringe provided and drop ball bearing into housing.
3.3 Fit drive hub into the bearing housing to locate on ball bearing.
3.4 Fit drive belt by passing round the drive hub and on to the motor pulley. Motor pulley top groove = 33 R.P.M. Motor pulley bottom groove = 45 R.P.M.
Mount the tone arm on the arm mounting board following manufacturers instructions and fit to arm
3.5
support by means of two M5 screws and washers provided. Do not tighten at this stage. NOTE: A tone arm earthing screw is provided at the rear.
3.6 Remove nylon chassis transit screws.
3.7 Fit platter by locating on drive hub centre boss.
3.8 Fit the record mat.
3.9 Connect the supply cable, either to the power outlet on the rear of the amplifier, or use a suitable adaptor to enter directly to the mains supply.
3.10 Systemdek turntables can be supplied for service on 220/240V--50Hx: 100V--50Hz, 110V--60Hz or 200V--50Hz A.C. mains supply. Before connecting check both the supply voltage and other information on the rating plate of the unit, if required your Systemdek dealer can arrange the unit for alternative supply conditions.
4. SETTING-UP PROCEDURE
4.1 Adjustments to the Systemdek sub-chassis are made by turning the three* suspension support screws
positioned around the platter to raise or lower the sub-chassis assembly. PLEASE NOTE: During production the sub-chassis is set to carry an average tone arm weighing 1.1lb (0.45kg) which ensures that further adjustment to carry a heavier or lighter tone arm is kept to a minimum. At this stage also the spring positions are finalised and set. This important setting thereafter remains constant if further adjustment is made by the user. * Turn clockwise to raise. Turn anti-clockwise to lower.
5. LEVELLING THE PLATTER AND ARM ASSEMBLY
5.1 Before starting the final setting, the Systemdek should be placed with the back of the unit on the edge of a table or bench. Check that the drive belt is in position.
5.2 The tone arm should be finally located and the audio cable dressed to give a free floating condition secured by the clamp and screws provided.
5.3 Assess the adjustment necessary by placing a level side to side and front to back on the platter. Turn the adjusting screws until the exact levelling of the platter is attained with an approximate 5mm space between the top of the plinth and the bottom outer rim of the platter.
5.4 When the operating position has been finalised the Systemdek can be moved or carried to other situations without risk of altering the setting.
5.5 It is a wise procedure to remove the platter when moving the turntable.
6. SPEED CHANGE
A two speed drive pulley attached to the motor spindle provides the 33 R.P.M. (top groove) and the 45
6.1
R.P.M. (bottom groove) speeds. To change speeds it is necessary to remove the platter and change the drive belt position. Removing the heavy platter from the sprung sub-chassis will obviously change the position of the driven hub and misalign the drive belt. *Correct this by turning the drive hub holding the spindle with the forefinger and thumb. Do not lift the spindle from the bearing housing. Now move the belt to the desired speed. Carefully replace the platter into position and start the motor. *Please note this should only be necessary changing from 33 R.P.M. to 45 R.P.M.
Loading...
+ 1 hidden pages