SystemAir Topvex SR 09, Topvex SR 11, Topvex TR 09, Topvex TR 15, Topvex TR 12 Installation Instructions Manual

Page 1
TopvexSR09,11,TR09-15
CompactAirHandlingUnit
Installationinstructions
Documentinoriginallanguage
207577-EN_GB
04-04-2013A003
Page 2
1DeclarationofConformity...........................................................................................................1
2Warnings...................................................................................................................................2
3Productinformation....................................................................................................................2
3.1General...........................................................................................................................2
3.2T echnicaldata..................................................................................................................3
3.2.1DimensionsandweightsTopvexSR09,11...............................................................3
3.2.2DimensionsandweightTopvexTR09-15.................................................................4
3.2.3ElectricaldataT opvexSR09,11,T opvexTR09-15...................................................5
3.3TransportandStorage......................................................................................................5
4Installation.................................................................................................................................5
4.1Unpacking........................................................................................................................5
4.2Where/howtoinstall.........................................................................................................6
4.3DevidingtheT opvexairhandlingunits...............................................................................6
4.3.1HowtosplittheT opvexSRunit................................................................................6
4.3.2HowtosplittheT opvexTRunit................................................................................7
4.4Installingtheunit..............................................................................................................7
4.4.1Installationprocedure..............................................................................................8
4.5Supplyairsensor(TopvexSR09,11)................................................................................10
4.6InstallationofV AVmodels.................................................................................................11
4.7Connections.....................................................................................................................12
4.7.1Ducting..................................................................................................................12
4.7.2ElectricConnections...............................................................................................14
4.8InstallingtheControlPanel...............................................................................................19
4.8.1Dimensions............................................................................................................19
4.8.2Generalinformation.................................................................................................19
4.8.3Installation..............................................................................................................19
4.9AdditionalEquipment........................................................................................................20
Page 3
1DeclarationofConformity
Manufacturer
SystemairAB Industrivägen3 SE-73930SkinnskattebergSWEDEN Ofce:+4622244000Fax:+4622244099 www.systemair.com
herebyconrmsthatthefollowingproducts:
Airhandlingunits
TopvexSR09ELTopvexSR09TopvexSR09HWL/HWH
TopvexSR11ELTopvexSR11TopvexSR11HWL/HWH
TopvexTR09ELT opvexTR09
TopvexTR09HWL/HWH
TopvexTR12ELT opvexTR12
TopvexTR12HWL/HWH
TopvexTR15ELT opvexTR15
TopvexTR15HWL/HWH
(Thedeclarationappliesonlytoproductintheconditionitwasdeliveredinandinstalledinthefacilityinaccordance withtheincludedinstallationinstructions.Theinsurancedoesnotcovercomponentsthatareaddedoractions carriedoutsubsequentlyontheproduct)
Complywithallapplicablerequirementsinthefollowingdirectives
MachineryDirective2006/42/EC
LowVoltageDirective2006/95/EC
EMCDirective2004/108/EC
RoHS2Directive2011/65/EC
Thefollowingharmonizedstandardsareappliedinapplicableparts:
ENISO12100-1Safetyofmachinery–Basicconcepts,generalprinciplesfordesign–Part1:Basic
terminology,methodology
ENISO12100-2Safetyofmachinery–Basicconcepts,generalprinciplesfordesign–Part2:
Technicalprinciples
ENISO14121-1:2007Safetyofmachinery–Riskassessment–Part1:Principles
EN13857
Safetyofmachinery–Safetydistancestopreventhazardzonesbeingreached byupperorlowerlimbs
EN60335-1
Householdandsimilarelectricalappliances–SafetyPart1:Generalrequirements
EN60335-2-40
Safetyofhouseholdandsimilarelectricalappliances-Part2-40:Particular requirementsforelectricalheatpumps,air-conditionersanddehumidiers
EN50106
Safetyofhouseholdandsimilarappliances–Particularrulesforroutinetests referringtoappliancesunderthescopeofEN60335-1andEN60967
EN60529
Degreesofprotectionprovidedbyenclosures(IPCode)
EN61000-6-2
Electromagneticcompatibility(EMC)–Part6-2:Genericstandards–Immunityfor industrialenvironments
EN61000-6-3
Electromagneticcompatibility(EMC)–Part6-3:Genericstandards–Emission standardsforresidential,commercialandlight-industrialenvironments
Thecompletetechnicaldocumentationisavailable.
Skinnskatteberg,15-11-2012
MatsSándor TechnicalDirector
TopvexSR09,11,TR09-15
Installationinstructions
207577
1
SystemairAB
Page 4
2Warnings
Thefollowingadmonitionswillbepresentedinthedifferentsectionsofthedocument.
Danger
•MakesurethattheMainssupplytotheunitisdisconnectedbeforeperforminganymaintenanceor electricalwork!
•Allelectricalconnectionsmustbecarriedoutbyanauthorizedinstallerandinaccordancewith localrulesandregulations.
Warning
•AlthoughtheMainssupplytotheunithasbeendisconnectedthereisstillriskforinjuryduetorotating partsthathavenotcometoacompletestandstill.
•Bewareofsharpedgesduringmaintenance.Useprotectiveclothing.
•Thedoorhandlesareonlyintendedtobeusedduringtheinstallation.Thesemustberemovedbefore theunitisputintooperationtoensuretherequiredlevelofsafetyfortheunit.
Theunitmustbeductconnectedorinsomeotherwayprovidedwithprotectionsothatitisnot possibletocomeincontactwiththefansthroughtheductconnections
•Thisproductisnotintendedtobeusedbychildrenorpeoplewithreducedphysicalormentalability orlackofexperienceandknowledge,ifnoinstructionconcerningtheusehasbeengivenbythe personresponsiblefortheirsafetyorthatthispersonissupervisingtheoperation.Childrenshouldbe supervisedsothattheycannotplaywiththeproduct.
Caution
•Ductconnections/ductendsshouldbecoveredduringstorageandinstallation
•Donotconnecttumbledryerstotheventilationsystem
3Productinformation
3.1General
ThisinstallationmanualconcernsairhandlingunittypeTopvexSR09,11andT opvexTR09-15 manufacturedbySystemairAB.Theunitsincludethefollowingmodeloptions:
Model:SR09,SR11,TR09,TR12,TR15
Heatingcoil:EL(Electric),HWL(Watercoil,lowpower),HWH(Watercoil,highpower)orNone.
Rightorleftmodels:R(Right)L(Left).Thesidewherethesupplyairislocatedwhenviewedfrom theaccessside.
Airowcontrol:CAV(ConstantAirV olume),V AV(V ariableAirVolume=Constantductpressure control)
Waterheatingbatterycanbeorderedasanaccessorytounitswithoutre-heater.
Thismanualconsistsofbasicinformationandrecommendationsconcerningthedesign,installation, start-upandoperation,toensureaproperfail-freeoperationoftheunit.
Thekeytoproperandsafeoperatingoftheunitistoreadthismanualthoroughly,usetheunitaccordingto givenguidelinesandfollowallsafetyrequirements.
TopvexSR09,11,TR09-15
Installationinstructions
207577
2
SystemairAB
Page 5
3.2Technicaldata
3.2.1DimensionsandweightsTopvexSR09,11
81 0
A
BF
A
DCECD
G
29 89 0 89 0 29
KL
M
15 R (½ ")
Fig.1Dimensions(mm)
ModelAB
C
DEF
SR09
1120600400108104260
SR11
1230800400135165215
Model
G
K
L
MWeight,kg
SR09
915434195145320
SR11
1025487195145365
TopvexSR09,11,TR09-15
Installationinstructions
207577
3
SystemairAB
Page 6
3.2.2DimensionsandweightTopvexTR09-15
Fig.2Dimensions(mm)
ModelAB
C
DEF
G
HI
TR09179016301120810895104129123129
TR1219301740123093096576104141104
TR15193019801470118096576104141104
ModelJK
L
MN
O
PWeight,kg
TR091052107003001651030870505
TR121052158003501851140940580
TR1510523610003501851380940710
TopvexSR09,11,TR09-15
Installationinstructions
207577
4
SystemairAB
Page 7
3.2.3ElectricaldataTopvexSR09,11,TopvexTR09-15
Model
Fans(Wtot) 400V3N~
Fans(Wtot.) 230V3~
ElHeating battery(kW tot.)
Fuse(mains) (A)for400V 3N~
Fuse(mains) (A)for230V 3~
SR09EL
37543754123x353x50
SR09(None, HWL/HWH)
37543754
3x103x16
SR11EL
61306130153x353x63
SR11(None, HWL/HWH)
61306130
3x163x20
Model
Fans(Wtot) 400V3N~
Fans(Wtot.) 230V3~
ElHeating battery(kW tot.)
Fuse(mains) (A)for400V 3N~
Fuse(mains) (A)for230V 3~
TR09EL3780378093x253x40
TR09(None, HWL/HWH)
37803780
3x103x10
TR12EL35743574123x353x50
TR12(None, HWL/HWH)
35743574
3x103x16
TR15EL67606760153x353x63
TR15(None, HWL/HWH)
67606760
3x163x20
3.3TransportandStorage
TheT opvexSR/TRshouldbestoredandtransportedinsuchawaythatitisprotectedagainstphysical damagethatcanharmpanels,handles,displayetc.Itshouldbecoveredsothatdust,rainandsnow cannotenteranddamagetheunitanditscomponents.Theapplianceisdeliveredinonepiececontaining allnecessarycomponents,wrappedinplasticonapalletforeasytransportation.
WhentransportingtheT opvexSR/TRunitsuseaforkliftplacedonthegableoftheunit.
Warning
Theunitisheavy.Becarefulduringtransportandmounting.Riskofinjurythroughpinching.Use protectiveclothing.
4Installation
4.1Unpacking
Verifythatallorderedequipmentaredeliveredbeforestartingtheinstallation.Anydiscrepanciesfromthe orderedequipmentmustbereportedtothesupplierofSystemairproducts.
TopvexSR09,11,TR09-15
Installationinstructions
207577
5
SystemairAB
Page 8
4.2Where/howtoinstall
TopvexSR/TRaremeantforindoorinstallation.T opvexSR09,1 1canbeinstalledoutsideifweather protected.Placetheunitonahorizontalatsurface.It’simportantthattheunitiscompletelylevelled beforeitisputintooperation.
Placetheunitpreferablyinaseparateroom(e.g.storage,laundryroom,atticorsimilar).Theelectronic componentsshouldnotbeexposedtolowertemperaturethan0°Candhigherthan+50°C.
Iftheunitisinstalledinacoldplaceitisimportantthattheunitisnotshut-offbythemainswitch.Aslong asthemainvoltageisontheelectricalcabinetwillbekeptwarmalsoincoldclimates.Althoughtheunitis turnedoffbythecontrolsystemthecurrentison.
Whenchoosingthelocationitshouldbekeptinmindthattheunitrequiresmaintenanceregularlyandthat theinspectiondoorsshouldbeeasilyaccessible.Leavefreespaceforopeningthedoorsandfortaking outthemaincomponents(gure1andgure2).
Avoidplacingtheapplianceagainstawall,aslowfrequencynoisecancausevibrationsinthewallevenif thefannoise-levelisacceptable.Ifthisisnotpossibleitisrecommendedtocarefullyinsulatethewall.
Theoutdoorairintakeofthebuildingshouldifpossiblebeputinthenorthernoreasternsideofthebuilding andawayfromotherexhaustoutletslikekitchenfanoutcastsorlaundryroomoutlets.
4.3DevidingtheTopvexairhandlingunits
OndeliverythetwohalvesoftheT opvexappliancearemountedtogether.Ifnecessarytheycanbe devidedforeasytransporttothesiteofinstallationgure3andgure4.
4.3.1HowtosplittheTopvexSRunit
Removetheheatexchanger ,supplyairfanandtheextractairlter
A.Loosenthecableconnectorsinthewall
B.Thetwohalvesoftheapplicationarejoinedusing4M10screws,oneineachcorner
C.Itispossibledismountthegablesbyremoving6MRXM6screwswithTH2bitstool
Reassembleinthereverseorder.
Fig.3Lefthandversion
TopvexSR09,11,TR09-15
Installationinstructions
207577
6
SystemairAB
Page 9
Note:
Whenreassemblingthepiecesmakesuretheyareconnectedcorrectly–seecablemarkingsonthe sideofthecables.
4.3.2HowtosplittheTopvexTRunit
Removetheheatexchanger ,extractfanandtheextractairlter
A.Removetheplate
B.Loosethecableconnectors
C.Removethe7M10screwsthatjointhetwohalvesoftheappliance
A
Fig.4Lefthandversion
4.4Installingtheunit
Theunitmustbeinstalledinthefollowingposition(gure5andgure6).
TopvexSR09,11,TR09-15
Installationinstructions
207577
7
SystemairAB
Page 10
Fig.5Installationposition(lefthandunit)
Fig.6Installationposition(righthand)
Table1:Symboldescription
Symbol
Description
Supplyair
Exhaustair
Outdoorair
Extractair
4.4.1Installationprocedure
1
Preparethesurfacewheretheunitistobemounted.Makesurethatthesurfaceisat,levelledandthat itsupportstheweightoftheunit.Performtheinstallationinaccordancewithlocalrulesandregulations.
TopvexSR09,11,TR09-15
Installationinstructions
207577
8
SystemairAB
Page 11
2
Lifttheunitinplace.
Warning
Bewareofsharpedgesduringmountingandmaintenance.Makesurethataproperliftingdeviceis used.Useprotectiveclothing.
3
Leveltheunitwithhelpoftheenclosedmounting feet
4
Connecttheunitelectricallytothemainsthrough theallpolecircuitbreaker(safetyswitch),whichis enclosedinsidetheunitondelivery .Thewiringis ledthroughthegableoftheunit(T opvexSR09,
11)orthroughthetopoftheunitcasing(T opvex TR09-15)directlytotheelectricalconnectionbox.
Seeenclosedwiringdiagram,andchapter4.7.2.2, table(table2)formoreinformation.
Warning
Theunitselectricalconnectiontothemains supplymustbeprecededbyanallpolecircuit breakerwithaminimum3mmgap.
Danger
•MakesurethattheMainssupplytothe unitisdisconnectedbeforeperformingany maintenanceorelectricalwork!
•Allelectricalconnectionsmustbecarriedout byanauthorizedinstallerandinaccordance withlocalrulesandregulations.
TopvexSR09,11,TR09-15
Installationinstructions
207577
9
SystemairAB
Page 12
4.5Supplyairsensor(TopvexSR09,11)
Thesupplyairsensoristtedintheductca.3maftertheunitinthesupplyairduct(gure7).See table2towhichterminalsthesensorneedstobeconnectedintheelectricalconnectionbox.Other temperaturesensorsarebuiltintotheunitfromfactory.Thesupplyairsensorisenclosedintheunit packageondelivery.
Fig.7Installedsupplyairsensor(lefthandconnectedunit)
TopvexSR09,11,TR09-15
Installationinstructions
207577
10
SystemairAB
Page 13
4.6InstallationofVAVmodels
IftheunitisdeliveredasaVA V(VariableAirVolume)unitthepressuretransmitterscontrollingthefan speedsaredeliveredlooselywiththeunit.Thepressuretransmittersneedtobemountedinthesupply andextractairducts(gure8)andconnectedaccordingtotable2.
Fig.8VA Vinstallation
TopvexSR09,11,TR09-15
Installationinstructions
207577
11
SystemairAB
Page 14
4.7Connections
4.7.1Ducting
4.7.1.1Airconnectionsprinciples
Fig.9Connectionsandbasiccomponentsinlefthandconnectedunits
PositionDescription
Symbol
A
Connectionsupplyair
B
Connectionexhaustair
CConnectionoutdoorair
D
Connectionextractair
1
Fansupplyair
2Fanextractair 3
Filtersupplyair 4Filterextractair 5
Heatexchanger 6Rotormotor
7
Electricalconnectionbox
8
Re-heaterbattery
4.7.1.2CondensationandHeatInsulation
Outdoorairductanddischargeductsmustalwaysbewellinsulatedagainstcondensation.Correct insulationinstallationonductsconnectedtotheunitisespeciallyimportant.Allductsinstalledincold rooms/areasmustbewellinsulated.Useinsulatingcovering(minimum100mmmineralwool)withplastic diffusionbarrier.Inareaswithextremelylowoutdoortemperaturesduringthewinter,additionalinsulation mustbeinstalled.T otalinsulationthicknessmustbeatleast150mm.
TopvexSR09,11,TR09-15
Installationinstructions
207577
12
SystemairAB
Page 15
Caution
•Iftheunitisinstalledinacoldplacemakesurethatalljointsarecoveredwithinsulation,andtapewell
•Ductconnections/ductendsshouldbecoveredduringstorageandinstallation
•Donotconnecttumbledryerstotheventilationsystem
4.7.1.3Silencers
Toavoidfannoisebeingtransferredviatheductsystem,silencersshouldbeinstalledbothonsupplyand extractair.
Toavoidnoisebeingtransferredbetweenroomsviatheductsystemandalsotoreducenoisefromthe ductsystemitself,installationofsilencersbeforeeveryinletdiffuserisrecommended.
TopvexSR09,11,TR09-15
Installationinstructions
207577
13
SystemairAB
Page 16
4.7.2ElectricConnections
Allelectricconnectionsaremadeintheelectricalconnectionboxwhichcanbefoundinthefrontoftheunit (gure10).Thehatchisremovedbyunscrewingfourscrews(gure10).
Theunitmustnotbeputintooperationbeforealltheelectricalsafetyprecautionshavebeenreadand understood.Seetheenclosedwiringdiagramforinternalandexternalwiring.
Allexternalconnectionstopossibleaccessoriesaremadetoterminalsinsidetheelectricalconnection box(table2).
Fig.10Openingtheelectricalconnectionbox
Danger
•MakesurethattheMainssupplytotheunitisdisconnectedbeforeperforminganymaintenanceor
electricalwork!
•Allelectricalconnectionsmustbecarriedoutbyanauthorizedinstallerandinaccordancewith
localrulesandregulations.
4.7.2.1Electricalconnectionbox,Components
TopvexSR/TRareequippedwithabuiltinregulatorandinternalwiring(gure11).
ThegureshowstheelectricalconnectionboxfortheTopvexTR09-15units.Theconnectionboxforthe TopvexSR09,11hasthesamelayoutandcomponentswiththedifferencethattheelectricalheateris situatedinaseparatecompartment.
TopvexSR09,11,TR09-15
Installationinstructions
207577
14
SystemairAB
Page 17
Fig.11Electriccomponents
Positiondescription
1RegulatorE-28
2
Transformer230/24VAC
3
Terminalsforinternalandexternal
components
4
Terminalsforinternalwiring
5
Terminalsformainssupplytotheunit
6
Contactor(K2)On/OffPumpcontrolwater
(HWunitsonly,notusedinEL-units)
7
Automaticfuse
8
AutomaticfuseforELheater
9
Contactor(K3)forcontrolofELheater
10
Thermostat(ELunits)
11
Manualoverheatprotectionreset(EL
units)
TopvexSR09,11,TR09-15
Installationinstructions
207577
15
SystemairAB
Page 18
4.7.2.2TopvexSR09,11,TopvexTR09-15ExternalConnections
Table2:Connectionstoexternalfunctions
Terminal block
DescriptionRemark
PE
Ground
NN
Earthedneutral(supplyvoltage)
L1L1
Phase(supplyvoltage)Usedforphase230V1~
iftheunithasthismains supply
400V3~/230V3~
L2L2
Phase(supplyvoltage)400V3~/230V3~
L3L3
Phase(supplyvoltage)400V3~/230V3~
G0G0Reference(Watervalveactuatormains
supply)
24VAC
GGMainssupply(Watervalveactuator)24VAC
10
DOrefDOreferenceG(24VAC)
12
1
DO2Outdoor/Exhaustairdamper24VAC
Max.2,0Acontinuousload
11L1
Circulationpumphotwatersystem230VAC
14
1
DO4Coolingpump24VAC
15
1
DO5DXCoolingstep124VAC
16
1
DO6DXCoolingstep224VAC
17
1
DO7SumalarmoutputforDOsignals24VAC
30
AIRefAIreference
neutral
31AI1
SensorsupplyairUseterminal30asreference
40Agnd
UIreference
neutral
41
2
UAI1/(UDI1)
Pressuretransmitterextractair
Useterminal40asreference
42
2
UAI2/(UDI2)
Pressuretransmittersupplyair
Useterminal40asreference
44
UAI3/(UDI3)
Frostprotectionsensorwaterheating battery
Useterminal40asreference
4
3
DIrefDIreference
50BExo-lineBModbus,Exo-line
connection
51AExo-lineAModbus,Exo-line
connection
52NExo-lineNModbus,Exo-line
connection
53EExo-lineEExo-lineconnection
57
+
LON+Option
58
-
LON-Option
59Egnd
LONEgndOption
71
3
DI1ExternalalarmNormallyopencontact
Useterminal4asreference
TopvexSR09,11,TR09-15
Installationinstructions
207577
16
SystemairAB
Page 19
Connectionstoexternalfunctionscont'd
Terminal block
DescriptionRemark
74
3
DI4ExtendedrunningNormallyopencontact
Useterminal4asreference
75
3
DI5FirealarmNormallyopencontact
Useterminal4asreference
76
3
DI6ExternalstopNormallyopencontact
Useterminal4asreference
90Agnd
AOReference
neutral
93
AO3Controlsignal0-10Vvalveactuator,
WaterHeating
Useterminal90asreference
94
AO4Controlsignal0-10Vvalveactuator,
Cooling
Useterminal90asreference
1.MaximumcurrentloadforallDOcombined:8A
2.Connectiontoexternalpressuresensorincaseofpressurecontrolledunit(V AV)
3.Theseinputsmayonlybewiredtovoltagefreecontacts
TopvexSR09,11,TR09-15
Installationinstructions
207577
17
SystemairAB
Page 20
4.7.2.3BMSConnection
CommunicationpossibilitiesforstandardcontrollerE-28WEB.
•RS485(Modbus):50-51-52
•RS485(Exoline):50-51-52-53
•TCP/IP(Exoline)
Note:
RS-485portandTCP/IPportcannotbeusedsimultaneously!I.e.possiblecommunicationsareModbus orexolineviaRS-485or
Exoline(WEB)viaTCP/IP .
Fig.12BMSconnectiononthecontroller
TopvexSR09,11,TR09-15
Installationinstructions
207577
18
SystemairAB
Page 21
4.8InstallingtheControlPanel
4.8.1Dimensions
Fig.13Controlpaneldimensions
Position
Dimensions(mm)
A115.0
B94.0
C
26.0
D
c/c60.0
E50.5
4.8.2Generalinformation
ThecontrolpanelisdeliveredconnectedtotheCorrigocontrolunitsituatedintheelectricalconnection box.Cablelengthis10m.Incasethecontrolpanelneedstobedetachedfromthesignalcableitis possibletoloosenthewiresonthebackofthecontrolpanel(gure14).
Asetofself-adhesivemagnetstripsareincludedinthepackagetofacilitateinstallationonametalsurface.
4.8.3Installation
1
Findanappropriateplacetoinstallthecontrolpanel.Maximumlengthbetweencontrolpanelandunit is10masstandard.
2
Ifneeded,drilltwoholesinthewalltohangthecontrolpanel(centertocenter:60mm)(pos.1,gure14).
TopvexSR09,11,TR09-15
Installationinstructions
207577
19
SystemairAB
Page 22
Fig.14Controlpanelwireconnections
PositionDescription
1Mountingholes
2
Connectionblock
3
Connectiontoyellowcable
4
Connectiontoorangecable
5
Connectiontoredcable
6
Connectiontobrowncable
7
Connectiontoblackcable
4.9AdditionalEquipment
Forinformationconcerningadditionalexternalequipmentsuchasvalveactuators,motorizeddampers, E-tool,roofunits,wallgrillesetc.seetechnicalcatalogueandtheirenclosedinstructions.
Forelectricalconnectionsofexternalcomponentsseeenclosedwiringchart.
TopvexSR09,11,TR09-15
Installationinstructions
207577
20
SystemairAB
Page 23
TopvexSR09,11,TR09-15
Installationinstructions
207577
21
SystemairAB
Page 24
lastpage
SystemairABreservestherighttomakechangesandimprovementstothecontents
ofthismanualwithoutpriornotice.
SystemairAB
Industrivägen3
SE-73930Skinnskatteberg,Sweden
Phone+4622244000
Fax+4622244099
www.systemair.com
207577
Loading...