Synergy 5224-A User Manual

Page 1
SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397
PPM-5224-A JK 4 DOOR REAR CAGE KIT
Version 1.1
GENERAL NOTES:
These instructions are also available on our website; www.polyperformance.com.
Check the website before you begin for any updated instructions and additional photos for your reference.
This is a weld in roll cage kit, all welding should be performed by an experienced
welder with proper welding equipment
Use in conjunction with PPM-5221-A; JK front cage kit
This kit works with either a soft top or hard top
Use extreme care when welding and grinding in the interior of your Jeep, remove
or cover any components you do not want welding spatter or grinding sparks to damage.
1. Remove the hard top or soft top, if using a soft top, remove the door surrounds and the entire soft top and bow assembly.
2. Remove the sound bar and unzip the rear roll bar padding.
3. Install the PPM-5221-A front cage kit per the instructions included with the front cage kit.
4. Unzip the C-pillar cross bar padding and remove the interior lamp. Position the C­pillar spreader bar bracket over the C-pillar cross bar. The triangle points forward and the holes should line up with the holes in C-pillar cross bar. Cut holes in the padding cover where the tubes will go through, you will need to notch the padding on the bottom of the C-pillar cross bar. Mark the edges of the bracket on the cross bar. Remove the paint for welding.
5. Position the C to B pillar spreader bars, the ends of the tubes should fit into the cutouts in the C and B pillar spreader bar brackets. The bends in tubes should be at the rear of the tubes.
Page 2
SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397
6. Slide the padding forward and weld both ends of the spreader bars, weld the top, front and back of the C pillar bracket to the C pillar cross bar, also weld the bottom edge around the tubes, ends and middle of the bracket.
Page 3
SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397
7. Fold the rear seats forward, remove the lower seat and seat belt mounting nut, position the C-pillar foot plate over the studs and replace the nuts.
Page 4
SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397
8. Drill the rear foot plate holes through the floor with a 3/8” drill bit. Use caution when drilling through on the driver side, the fuel filler hoses are underneath these bolt holes. Insert 3/8 x 1” bolts and flange nuts with a washer under the bolt head. Tighten the 3/8” bolts and the seat and seat belt nuts evenly.
9. Position the C-pillar upright tubes between the foot plate and the bend in the C-pillar beneath the C-pillar cross bar. The top of the tube is about 4” in front of the seat belt mounting bung. Clean off the paint on the factory roll bar where you will weld the tube. The bottom of the tube should be centered on the foot plate. Make sure the rear seats will fold back all the way and lock without hitting these tubes.
Page 5
SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397
Page 6
SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397
Page 7
SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397
Page 8
SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397
10. Cut a hole in the roll bar padding cover where the C-pillar upright tube goes through. Position the tube through the hole in the padding and tack weld into place.
11. Included in this kit is also a rear passenger harness bar. If desired, install at this time. It should be positioned just about an inch below the top of the rear seat as shown to ensure proper harness mounting points. See image 11.1 below. Be sure tube is level with the vehicle and that the seats clear when in the fully up position. Tack weld into position once satisfied.
Img. 11.1
12. Fully weld C-pillars and harness bar in vehicle.
Page 9
SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397
13. Clean and paint the new tubes and where they are welded to the factory roll cage
14. Trim the C pillar padding to fit around the new tubes and zip up the padding
Page 10
SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397
15. Notch the factory sound bar to fit around the spreader bars
Page 11
SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397
16. Installation is complete.
Loading...