![](/html/d5/d5b7/d5b74cc4ccfc9405496a53531a6a27426ff10dbe7cda12489a3e69c072628fb7/bg1.png)
SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397
4018-RHD JEEP JK RHD COMPRESSOR MOUNT
GENERAL NOTES:
These instructions are also available on our website; www.synergymfg.com. Check the website before
you begin for any updated instructions and additional photos for your reference.
PARTS LIST:
PART NUMBER – PART DECRIPTION
(1) 4018-RHD Compressor Bracket
Parts / Tools Needed to complete installation:
13mm wrench (ratcheting wrench preferred)
10mm wrench
Phillips head screw driver
APPROXIMATE INSTALL TIME: ½-1 HOUR
INSTALLATION:
1) Note - if mounting a 400H or 450 Series Viar compressor, see additional install steps 6-10
2) Using the fasteners included with the compressor, mount compressor on bracket as shown in the images
below.
ARB: Viar:
![](/html/d5/d5b7/d5b74cc4ccfc9405496a53531a6a27426ff10dbe7cda12489a3e69c072628fb7/bg2.png)
3) **NOTE** Be careful not to bump or pull the master cylinder away from the booster during install.
Doing so can dislodge the brake booster o-ring. If the o-ring does become dislodged, do not drive the
Jeep until repaired.
4) Using a 13mm wrench, remove both nuts securing the master cylinder to the brake booster.
5) Install the 4018-RHD bracket using the factory nuts removed in step 4.