Visit our web site at: www.swing-n-slide.com or call us at 1-800-888-1232
29'
27'
No. of Children: Up to 10
29
Min. Use Zone:
Set Dim.
Est. Building Time: 5-10 hr.
15
'W x13'L x 11'H
' x27'
R
Safety Checklist for Swing-N-Slide Play Sets and Accessories
Meijer.com
Observing the following statements and warnings reduces the likelihood of serious or fatal injury
Installation Safety – Have You:
Consulted the assembly instructions supplied with your particular model?
Noted this accessory is to be used only on Swing•N•Slide approved designs? (Do not alter its design or add/remove components.)
Made sure all hardware is tightened securely? (Supplied bolt covers must also be fastened securely.)
Using a hacksaw, cut off all protruding threaded ends of bolts and other fasteners and remove any sharp edges with
a metal file as needed?
Placed the equipment on level ground, not less than six feet (1.8 meters) from any structure or obstruction such as a fence, garage,
house, overhanging branches, laundry lines, or electrical wires?
Made sure home playground equipment is not installed over concrete, asphalt, packed earth or any other hard surface? (A fall onto
a hard surface can result in serious injury to the equipment user.)
Verified that suspended climbing ropes, chain,or cable are secured at both ends?
Consulted in assembly instructions of your particular model for minimum use zones?
Followed all anchoring and shock absorbing surfacing requirements on the back of this sheet as they apply?
Made sure not to allow children to use equipment until it is properly installed?
Operating Safety – Have You:
Determined that on-site adult supervision is provided for children of all ages?
Warned children the following before allowing them to use the equipment?
Not to walk close to, in front of, behind or between moving items.
Not to twist swing or any other accessory chains or ropes or loop them over the top support bar since this will reduce the
strength of chain or rope.
Not to swing empty seats or other accessories.
Be sure to sit in the center of the swing seat and other accessories with full weight on the seat.
Not to attach items to the playground equipment that are not specifically designed for use with the equipment such as but not
limited to, jump ropes, clotheslines, pet leashes, cables and chain. They may cause a strangulation hazard.
Not to use equipment in a manner other than intended.
Not to get off equipment while it is in motion.
Not to climb on the equipment when it is wet.
Determined that only one child per planned occupant seat should be allowed on this set at one time.
Determined children must be dressed appropriately for play. Avoid clothing with draw strings and loose fitting clothes which
could become entangled or snagged on equipment.
Determined that suspended climbing ropes, chain, or cable cannot be looped back upon itself.
Read and understood the following warning regarding the use of two and four passenger lawn swings?
Warning: Lawn Swings are designed for use by children over two years of age. Use by children under the age of two can result
in entrapment between the seats and back areas. Never place children in a rearward facing position or with legs between the
seat and backrest because the child’s body may pass through the opening causing entrapment of the child’s head.
Safety Maintenance – Have You Determined to:
Check all nuts and bolts twice monthly during the usage season for tightness and tighten as required? (It is
particularly important that this procedure be followed at the beginning of each season.)
To prevent the deterioration of materials, remove plastic swing seats and other plastic accessories and take indoors? (Do not
use when the temperature drops below 0° F.)
Oil all metallic moving parts monthly during usage period?
Check all hardware and equipment for sharp edges twice monthly during usage season? (Replace when
necessary. It is especially important to do this at the beginning of each new season.)
Check swing seats, chains, ropes and cables monthly during usage season for evidence of deterioration? Severe rusting or excessive
wear, especially near the top swing hanger or at the seat connection are evidence of chain deterioration. Cracks in the protective plastic
sleeve or seat itself are also signs of deterioration. If any of these conditions exist, call 1-800-888-1232 to order replacement accessories.
Sand rusted metal parts and repaint using non-lead based paint.
Disposal Instructions
When the equipment is taken out of service, it must be disassembled and disposed of in such a way that no unreasonable hazards
will exist at the time the set is discarded.
Important!
Save this instruction sheet in the event the manufacturer needs to be contacted.
Additional Safety Instructions for all Swing-N-Slide Playground Equipment.
2
This product is intended for single family home/residential use only and not intended for use in any public setting.
Meijer.com
According to ASTM requirements, all kits must be anchored to the ground and, if the unit has a climbing rope, the rope end must be anchored to the ground. If soil conditions
permit stakes to be pulled out easily, cementing into ground is necessary.
• To anchor the unit to the ground, Follow the instructions included in this plan for applying Anchor-It devices to your unit, or use 2" x 4" x 18" (45mm x 95mm x 457mm) pressuretreated stakes. Pound stakes into ground at least 12" (305mm) at all inside corners of the posts (including A-frame legs and climbing unit posts). Attach with four (4) 16D (3-1/2")
galvanized nails per stake into each 4" x 4" (95mm x 95mm) post.
• If the unit has a climbing rope, anchor the rope end.
• Once the unit is completely assembled and before children are allowed to play on it, proper shock-absorbing surfacing material must be installed. This may be accomplished by
using loose-fill materials at a sufficient depth. The Consumer Product Safety Commission “Handbook for Public Playground Safety” lists the following materials and required
depths that are sufficient for home/residential application. For fall height protection up to 9 ft. (2.742m) [recommended for Swing•N•Slide kits]:
Double Shredded Bark Mulch9" (229mm)
These depths were derived from the CPSC Handbook. Swing•N•Slide has not done independent tests to determine these required depths.
When properly installed, shock absorbing material will completely cover the horizontal baseboards on climbing units. This protective surfacing must extend a minimum of 6 ft.
(1.828m) in all directions from the perimeter of the equipment or from the outermost edges of any component. For example, a slide extending beyond the platform must have
protective surfacing at least 6 ft. (1.828mm) out from both sides as well as the end. For swings, the protective surface must extend at least 14 ft. (6m)
front of the swing when the swing is in its rest position.
Placement in any public setting constitutes a misuse of this product.
LOOSE FILL MATERIALREQUIRED (UNCOMPRESSED) DEPTH1in. (mm)
Wood Mulch9" (229mm)
Uniform Wood Chips12" (305mm)
Fine Sand12" (305mm)
Fine Gravel12" (305mm)
IMPORTANT!
out from both the back and
NOTES:
3
TOOLS REQUIRED
Meijer.com
TAPE MEASURE
(32) 1-1/4" lag screw
(54) 2" lag screw
ELECTRIC DRILL
1/2" SOCKET & WRENCH
SAFETY GLASSES
& DUST MASK
(4) 5/16''Hex Head Lag Screws
PHILLIPS BIT
HAMMER
CARPENTER'S SQUARE
(8) Tarp Washers
(8) 3/4'' panhead screws
(8) 3/4'' screws
(119) 1-1/4'' screws
(3) 1-1/2'' screws
(296) 2-1/2'' screws
(6) 3'' screws
(2) 6-1/2'' Bolts
(6) 5/16'' flat washers
(1) 3/8" DRILL BIT
(2) Loc-Nuts
(1) T20 Torx® Bit
(1) T30 Torx® Bit
(2) Wood Loc Washers
4
(8) Shelf-Loc
THIS PRODUCT IS
INTENDED FOR USE
BY CHILDREN FROM
AGES 2-10 YEARS
For Home / Residential
Use ONLY
1212 Barberry Drive
Janesville, WI 53545
1-800-888-1232
www.swing-n-slide.com
R
Meijer.com
(2) Step Brackets
Note: (1 Left, 1 Right)
(2) 3X3 TO 4X4
Shelf-Loc
(2) EZ Frame Brackets
(4) Anchor-It
(6) Wrap-Loc
(1) Pleated Tarp
(2) Play Handles
with Hardware
(2) Split Beam bracket
(1) Window Frame
(4) Anchor-It Straps
Brentwood
Plan
(1) Plan
(1) Name Plate
5
Brentwood Assembly Instructions
Meijer.com
(1) Coolwave Slide
with Hardware
250 lb Weight Limit
(2) Reg Duty Swing Seat
with Hardware
115 lb Weight Limit
(8) Swing Hanger
with Hardware
(1) Discovery Mountain
with Hardware
450 lb Weight Limit
(1) 2 For Fun
with Hardware
150 lb Weight Limit
(8) Climbing Rocks w/ Hardware
230 lb
Weight Limit
(1) Steering Wheel
With Hardware
6
(2) 2'' x 4'' x 22''
(2) 3'' x 3-1/2'' x 94''
(2) 5/4'' x 4'' x 20'' Angle Brace
(1) 1'' x 4'' x 10'' Window Sill
(3) 2'' x 4'' x 17-1/4'' (Slide Stake)
(2) 2'' x 4'' x 5''
(2) 2'' x 4'' x 25-1/2''
(4) 2'' x 4'' x 36''
(1) 2'' x 4'' x 47''
(8) 2'' x 4'' x 47-1/2''
(1) 1'' x 4'' x 7-7/16'' Window To p
(1) 1'' x 4'' x 7-3/4''
(2) 1'' x 4'' x 15-5/16'' Shutters
(1) 1'' x 4'' x 18''
(3) 1'' x 4'' x 20-1/2''
(8) 1'' x 4'' x 24''
(8) 1'' x 4'' x 30''
(2) 1'' x 4'' x 30'' Window Sides
(2) 1'' x 4'' x 41-1/4''
(7) 1'' x 4'' x 46''
(1) 1'' x 4'' x 46-3/4''
(23) 1'' x 4'' x 47-1/2''
(1) 1'' x 3'' x 23-1/2''
(4) 3'' x 3'' x 94'' (Plastic Coated)
(1) 4'' x 4'' x 47-1/2''
(1) 4'' x 6'' x 94'' Swing Beam
Meijer.com
Brentwood Assembly Instructions
Brentwood Board List
7
Brentwood Assembly Instructions
Meijer.com
How to select the correct fastener
Use these 2 pictorial guides to help select the correct fastener(s) for the
lumber attachment you are making. Each diagram will highlight the correct
number of fasteners to use, and where to attach them.
1'' x 4'' to 3'' x 3''
(3) 2-1/2'' screws
Apply 2-1/2" screws to the 1''x4'' boards
when attaching to 3''x3'' uprights.
1'' x 4'' to 1'' x 4''
(2) 1-1/4'' screws
Use 1-1/4'' screws when mounting 1'' x 4''
boards to 1''x4'' boards.
WHERE INSTRUCTED. DO NOT
FILL EVERY HOLE IN BRACKET.
THIS WILL LEAD TO HARDWARE
SHORTAGES.
Example of a Shelf-Loc bracket connection.
Look for ''TOP'' stamp on
bracket for correct orientation.
Shelf-Loc
Brackets Clip Together
GAP
TOP
Top of bracket
Wrap-Loc
Bottom of bracket
(Hole locations close to bottom)
DO NOT USE LAG
SCREWS HERE
Use Lag Screws Only Where
Brackets Attach
9
Brentwood Assembly Instructions
Look for ‘’TOP’’
stamp on brackets
while installing.
TOP
GAP on
this side
Meijer.com
Frame 1 Construction
3'' x 3'' x 94''
Fig.1a
83-1/4''
(2)
2'' Lag Screws
per joint
Fig.1b
DO NOT USE LAG
SCREWS HERE
Use Lag Screws Only Where
Brackets Attach
(2)
1-1/4'' Lag
Screws
per joint
1-1/4'' Lag screw
Frame 1
DO NOT USE LAG
SCREWS HERE
Use Lag Screws Only Where
Brackets Attach
47-1/4''
(2)
1-1/4'' Lag Screws
per joint
Fig.1c
(2)
2'' Lag Screws
per joint
A. Frame 1 Construction
1. Measure and position brackets on 3'' x 3'' as shown in (Fig.1a).
Note: Secure Shelf Lock with (2) Lag Screws only at this time.
2'' Lag screw
10
•WARNING•
Meijer.com
Avoid splitting your
lumber by offsetting
your screws at least
3/4’’ from edge.
Brentwood Assembly Instructions
Double check to make
sure structure is square
Tip: Flex brackets to make installation of
2'' x 4'' easier
Fig. 2a
Approx. 1/4''
Fig. 2b
STEP
BRACKET
(6)
1-1/4'' screws
(per Bracket)
Frame 1 Construction
(3)
2-1/2'' screws
per joint
1'' x 4'' x 47-1/2''
(2) 1-1/4'' lag screws
and
(3) 2'' lag screws
per bracket
2'' x 4'' x 47-1/2''
(3)
2-1/2'' screws
(per joint)
5/4'' x 4'' x 20''
Angle Brace
Fig. 2
(3)
2-1/2'' screws
(per joint)
Fig. 2c
(3)
2'' Lag
(2)
1-1/4'' Lag
NOTE: Upper screws are (2) 1-1/4'' Lag
Screws, Lower screws are (3) 2'' Lag
Screws.
1'' x 4'' x 47-1/2''
Frame 1
1-1/4'' Lag screw
1-1/4'' screw
A. Frame 1 Construction cont.
2. Attach boards as shown in (Fig. 2) through (Fig. 2c).
11
2'' Lag screw
2-1/2'' screw
(3)
2-1/2'' screws
per joint
Brentwood Assembly Instructions
Look for ‘’TOP’’
stamp on brackets
while installing.
TOP
GAP on
this side
Meijer.com
Fig. 3
3'' x 3'' x 94''
Frame 2 Construction
DO NOT USE LAG
SCREWS HERE
Use Lag Screws Only Where
Fig. 3a
Brackets Attach
1-1/4'' Lag Screws
per joint
Frame 2
(2)
47-1/4''
A. Frame 2 Construction
(2)
1-1/4'' Lag
Screws
per joint
1-1/4'' Lag screw
1. Measure and position brackets on 3'' x 3'' as shown in (Fig.3).
Note: Secure Shelf Lock with (2) Lag Screws only at this time.
12
Frame 2 Construction
Meijer.com
Fig. 4
Brentwood Assembly Instructions
•WARNING•
Avoid splitting your
lumber by offsetting
your screws at least
3/4’’ from edge.
(3)
2-1/2'' screws
per joint
(3)
2-1/2'' screws
per joint
1'' x 4'' x 47-1/2''
(2) 1-1/4'' lag screws
and
(3) 2'' lag screws
per bracket
2'' x 4'' x 47-1/2''
1'' x 4'' x 47-1/2''
Frame 2
(3)
2-1/2'' screws
(per joint)
(3)
2-1/2'' screws
per joint
Tip: Flex brackets to make installation of
2'' x 4'' easier
Fig. 4a
Approx. 1/4''
Fig. 4b
(3)
2'' Lag
NOTE: Upper screws are (2) 1-1/4'' Lag
Screws, Lower screws are (3) 2'' Lag
Screws.
(2)
1-1/4'' Lag
A. Frame 2 Construction cont.
2. Attach boards as shown in (Fig. 4) through (Fig. 4b).
1-1/4'' Lag screw
Double check to make
sure structure is square
2'' Lag screw
2-1/2'' screw
13
Brentwood Assembly Instructions
Meijer.com
Fig. 5
(3)
2-1/2'' screws
per joint
1'' x 4'' x 47-1/2''
(2) 1-1/4'' lag screws
and
2'' x 4'' x 47-1/2''
(3) 2'' lag screws
per bracket
1'' x 4'' x 47-1/2''
(2) 1-1/4'' lag screws
and
(3) 2'' lag screws
per bracket
(3)
2-1/2'' screws
per joint
Tip: Flex brackets to make installation of
2'' x 4'' easier
Fig. 5a
Approx. 1/4''
Fig. 5b
(2)
1-1/4'' Lag
(3)
2-1/2'' screws
per joint
1'' x 4'' x 47-1/2''
1'' x 4'' x 47-1/2''
A. Frame Construction cont.
1. Attach 1''x4'' and 2''x4'' boards as shown.
2'' x 4'' x 47-1/2''
Frame 1
(3)
2-1/2'' screws
per joint
(3)
2'' Lag
NOTE: Upper screws are (2) 1-1/4'' Lag
Screws, Lower screws are (3) 2'' Lag
Screws.
1-1/4'' Lag screw
2'' Lag screw
2-1/2'' screw
14
Fig. 6
Meijer.com
(3)
2-1/2'' screws
per joint
Brentwood Assembly Instructions
Tip: Flex brackets to make installation of
2'' x 4'' easier
Fig. 6a
Approx. 1/4''
(2) 1-1/4'' lag screws
(3) 2'' lag screws
Frame 2
and
per bracket
47-1/2'' Outside to Outside
Frame 1
Fig. 6b
(3)
2'' Lag
(2)
1-1/4'' Lag
NOTE: Upper screws are (2) 1-1/4'' Lag
Screws, Lower screws are (3) 2'' Lag
Screws.
(3)
2-1/2'' screws
per joint
A. Frame Construction (cont.)
1. Attach Frame 2 to Frame 1 as shown.
Note: Outside to Outside measurement of
uprights on all four sides of the tower
should be 47-1/2''.
1-1/4'' Lag screw
2'' Lag screw
1-1/4'' screw
2-1/2'' screw
15
Brentwood Assembly Instructions
Meijer.com
Fig. 7
(2)
2-1/2''
screws
per joint
2'' x 4'' x 47-1/2''
1'' x 4'' x 41-1/4''
18-1/2''
1'' x 4'' x 41-1/4''
(2)
2-1/2''
screws
per joint
Fig. 7a
1-1/4'' screw
2-1/2'' screw
B. Install Deck Boards
FRONT
1'' x 4'' x 18''
FRONT
(4)
1-1/4''
screws
UNDER DECK VIEW
1. Install (2) 1'' x 4'' deck boards as shown in (Fig. 7).
2. Attach 2'' x 4'' to deck boards using 2-1/2'' screws as shown in (Fig. 7).
3. Attach 1'' x 4'' Slide Support as shown in (Fig. 7a).
16
(10) 1'' x 4'' x 47-1/2''
Meijer.com
Brentwood Assembly Instructions
Fig. 8
(2)
2-1/2''
screws
per joint
NOTE: There must be a 1/2''
Nominal Gap between all
deck boards.
B. Install Deck Boards
1. Install (10) 1'' x 4'' deck boards to structure as shown (Fig. 8).
2. Use two 2-1/2'' screws at center and each end of deck boards.
Note: Screws at center will attach to center support.
2-1/2'' screw
17
Brentwood Assembly Instructions
Meijer.com
Fig. 9
(3)
2-1/2''
(5)
2-1/2''
screws
1'' x 4'' x 20-1/2''
1'' x 4'' x 20-1/2''
screws
1'' x 4'' x 47-1/2''
per joint
(3)
2-1/2''
screws
per joint
1'' x 4'' x 47-1/2''
1'' x 4'' x 47-1/2''
Fig. 9a
1'' x 4'' x 47-1/2''
(3)
2-1/2''
screws
per joint
(5)
2-1/2''
screws
1'' x 4'' x 20-1/2''
(5)
2-1/2''
screws
2-1/2'' screw
C. Install Barrier Support Boards
1. Install (3) 1'' x 4'' lower Barrier Support Boards as shown in (Fig. 9).
2. Install (3) 1'' x 4'' upper Barrier Support Boards as shown in (Fig. 9a).
(3)
2-1/2''
screws
per joint
18
Tip: Flex brackets to make installation of
Meijer.com
2'' x 4'' easier
Fig. 10
Fig.3a
Approx. 1/4''
Brentwood Assembly Instructions
Fig. 10a
2'' Lag screw
4'' x 4'' x 47-1/2''
ATTENTION:
Unit has been rotated
1/4 turn Counter
Clockwise for this view.
C. Install Lower Rail Boards
1. Install 4’’ x 4’’ Swing Beam Support as shown in
(Fig. 10) and (Fig. 10a).
19
3-1/2''
12-1/2''
5-1/2''
12-1/2''
94''
91-1/2''
17''
29-1/2''
12''
41-1/2''
14''
55-1/2''
8-1/4''
63-3/4''
14''
8-1/4''
77-3/4''
86''
2-1/2''
2 FOR FUN
Brentwood Assembly Instructions
Meijer.com
Fig. 11
A-FRAME
1-1/2''
5''
9-1/2''
10-1/2''15''
92-1/2''
87-1/2''
78''
63''
52-1/2''
D. Swing Beam Hole Locations
1. Install Swing Hangers into swing beam at
locations shown.
No Holes
Required
15''
10-1/4''
17''
10-1/4''
37-1/2''
27-1/4''
10-1/4''
20
Fig. 11a
(4) 1-1/4'' screws
Swing Hanger
Use Screwdriver to aid in tightening
Bottom Beam Clamp
t-nut
Hammer
3/8'' hole
Meijer.com
Brentwood Assembly Instructions
T-nut
1-1/4'' screw
E. Swing Beam Drill Locations
1. Tap T-nut into 3/8’’ hole as shown in (Fig. 11a).
2. Place a bottom beam clamp over the swing hanger as shown in (Fig. 11a).
3. Insert the swing hanger into the beam and thread it into the T-nut until it is flush or near flush with the top of theT-nut. A screwdriver may be used to twist the hanger (Fig. 11a). Orient swing hanger as shown in (Fig 11a).
4. Use (4) 1-1/4'' screws to secure beam clamp.
5. Check hanger to ensure it does not spin.
6. Repeat for all four hangers.
21
Brentwood Assembly Instructions
11-1/2''
2''
15''
2''
30-1/2''
28-1/2''
13-1/2''11-1/2''
94''
2 FOR FUN SWING
MOUNTS HERE
Meijer.com
Fig. 11b
A-FRAME ATTACHES
HERE
Fig. 11f
x4
2-1/4''
Carriage Bolt
8" min.
Washer
2'' x 4'' x 22''
side view
Drill 3/8" Holes
Loc Nut
17"
Fig. 11c
8" min.
Fig. 11d
Fig. 11e
1-1/2''
1-1/2''
14''
10-1/4''
27-1/4''
25-3/4''
11-3/4''
10-1/4''
22"
top view
2"
E. 2 For Fun Supports
1. Along top of Swing Beam mark placement for 2 For Fun2'' x 4'' Supports as shown in (Fig. 11b).
2. Position four beam brackets (right and left) in position on
beam making certain the outside of the braces are 17'' apart
and the nailing edge of the bracket is flush with the top of the
beam (Fig. 11c). Note: 2 For Fun Beam Brackets must be
placed a minimum of 8" from any adjacent structure or
accessory (Fig. 11d). Attach using three 2-1/2'' screws per
bracket.
3. Drill two 2'' x 4'' x 22'' supports as indicated in (Fig. 11e).
Attach four swing hangers to the supports using 5/16'' flat
washers and loc nuts as shown in (Fig. 11f).
4. Center supports across beam, mark and drill 3/8'' holes
(Fig. 11c). Attach using two 2-1/4'' Carriage bolts, 5/16"flat washers and loc nuts per bracket (Fig. 11c).
18"
2"
22
Brentwood Assembly Instructions
Meijer.com
Fig. 12
3-1/2'' FACE
Align the edges of the 3" x 3-1/2" legs
with the edges of EZ Frame Bracket
(8) 2-1/2’’ Screws
3-1/2'' FACE
3'' FACE
F. A-Frame Assembly
1. layout 3'' x 3-1/2’’s and 2'' x 4''as shown in (Fig. 12).
2. Align EZ Frame Bracket with face of
3'' x 3-1/2''s.
3. Secure EZ Frame Bracket with (8)
2-1/2'' screws to 3'' x 3-1/2''s
making sure they are flush with each
other.
4. Secure 2'' x 4'' to 3'' x 3-1/2''s as
shown in (Fig. 12a).
5. Flip over and add 2nd bracket.
Repeat steps 2 and 3.
Fig. 12a
3" x 3-1/2" x 94''
49-1/2"
(4)
2-1/2'' screws
2" x 4" x 47-1/2"
EZ Frame Bracket
3" x 3-1/2" x 94''
(4)
2-1/2'' screws
3-1/2'' FACE
2-1/2'' screw
93"
23
Brentwood Assembly Instructions
Meijer.com
Fig. 13
3'' x 5-1/2'' Swing Beam
6-1/2''
CARRIAGE
BOLT
WOOD LOC
WASHER
2-1/2'' screw
G. A-Frame Assembly cont.
Washer
2-1/2'' screws
Loc-Nut
1. Align EZ-Frame Bracket with carriage bolts on Swing Beam as shown in (Fig. 13).
2. Attach A-Frame beam to Swing Beam using (2) washers and (2) Loc-Nuts and 2 screws as shown in (Fig. 13).
3. Tighten Loc-Nut. Repeat on other bracket.
Note: Examine all hardware after the loc-nuts are fully tightened. If more than two threads are exposed, cut the
excess bolt off with a hacksaw or other suitable cutting tool.
24
H. A-Frame Assembly cont.
Meijer.com
1. Position Split-Brackets on 4'' x 4'' x 47-1/2''
(Fig 14).
2. With the help of others, lift A-Frame and
Swing Beam Assembly and center onto unit as
shown in (Fig. 14).
3. Secure as shown in (Fig 14a).
Brentwood Assembly Instructions
Fig. 14
Fig. 14a
22''
Swing Beam
Swing Beam
View from Deck
2'' Lag screw
x 8 (each bracket)
25
Brentwood Assembly Instructions
Meijer.com
(3)
2-1/2'' screws
Fig. 15
per joint
(7)1'' x 4'' x 46''
Use 2-1/2'' screws to
secure to 1'' x 4'' to 4'' x 4''
NOTE: There must be a 2-1/4''
Nominal Gap between
rear barrier boards.
Fig. 15a
NOTE: There must be a 2-1/4''
Nominal Gap between
side barrier boards.
1-1/4'' screw
2-1/2'' screw
I. Install Barriers
1. Attach (7) 1'' x 4'' Barrier Boards, evenly spaced asshown in (Fig. 15).
2. Attach (3) 1'' x 4'' Barrier Boards, evenly spaced, asshown in (Fig. 15a).
(2)
1-1/4'' deck screws
per joint
(3) 1'' x 4'' x 30''
26
(2)
Meijer.com
1-1/4'' deck screws
per joint
Brentwood Assembly Instructions
Fig. 16
(3) 1'' x 4'' x 30''
NOTE: There must be a 2-1/4''
Nominal Gap between
side barrier boards.
1-1/4'' screw
J. Install Barriers
1. Attach (3) 1'' x 4'' Barrier Boards, evenly spaced as shown in (Fig. 16).
27
Brentwood Assembly Instructions
Meijer.com
Fig. 17
(1) 1'' x 4'' x 7-1/16''
Window Top
(Flush With Barrier
Boards)
(1) 1'' x 4'' x 30''
(1) 1'' x 4'' x 30''
Window Cut
(1) 1'' x 4'' x 30''
(1) 1'' x 4'' x 30''
Window Cut
(1) 1'' x 4'' x 7-3/4''
Window Bottom
NOTE: There must be no Gap
between front barrier
boards. Mount Flush.
3/4'' screw
(2)
1-1/4'' deck screws
per joint
Fig. 17a
(8)
3/4'' deck screws
1-1/4'' screw
1-1/2'' screw
K. Install Barrier
1. Attach 1'' x 4'' barrier boards as shown in (Fig. 17).
2. Install Window Frame, as shown in (Fig. 17a).
NOTE: You may need to readjust Window Top Board to
properly align Window Frame with Opening.
28
(2)
Meijer.com
2-1/2'' screws
per joint
Brentwood Assembly Instructions
Fig. 18
21''
2'' x 4'' x 47-1/2''
2-1/2'' screw
L. Climbing Wall Support
1. Install 2'' x 4'' Climbing Wall support board as shown in (Fig. 18).
29
Brentwood Assembly Instructions
Meijer.com
M. Climbing Wall.
Fig. 19
TOP
1. Attach (8) 1'' x 4'' boards to (2) 2'' x 4'' boards and
install on unit as shown in (Fig. 19).
Note: There is a 2-3/4'' Gap between each
Climbing Wall 1'' x 4'' Board.
2. Attach Climbing Wall to unit as shown in
(Fig. 19a).
NNOOTTEE::
mbing Rock Wall will require
5' Cli
88CClliimmbbiinnggRRoocckkss
Fig. 19b
(2)"T" nuts
1'' x 4'' x 24''
2-3/4'' GAP
1'' x 4'' x 24''
2-3/4'' GAP
2'' x 4'' x 47-1/2''
1'' x 4'' x 24''
2-3/4'' GAP
1'' x 4'' x 24''
2-3/4'' GAP
1'' x 4'' x 24''
2-3/4'' GAP
1'' x 4'' x 24''
2-3/4'' GAP
1'' x 4'' x 24''
2-3/4'' GAP
1'' x 4'' x 24''
2'' x 4'' x 47-1/2''
(2)
2-1/2'' screws
(Per joint)
3/8" Holes
(2) 1-1/4'' Hex Head Bolts
(1) Loc Washer per bolt
(1) Flat Washer per bolt
Rock
M. Climbing Rock Installation
1. Mark locations of Climbing Rocks on the Climbing
Wall in a pattern that will easily allow your child to
climb to the deck. Make sure the bolt hole locations
are clear of wall supports before drilling.
2. Drill holes through the wall at the desired locations
using a 3/8" drill bit. Install Climbing Rocks as
shown in (Fig. 19b).
3. Make sure the Climbing Wall and Climbing Rock
connections are secure before allowing any children
to play on the Climbing Wall.
Fig. 19a
2-1/2'' screw
(3)
2-1/2'' screws
(Both Sides)
30
Brentwood Assembly Instructions
Meijer.com
(2)
2-1/2'' screws
Fig. 20
(2)
2-1/2'' screws
(3)
1-1/2'' screws
1'' x 4'' x 46-3/4''
22''
(3)
2-1/2'' screws
(2) 2'' x 4'' x 36''
1-1/2'' screw
2-1/2'' screw
N. Tarp Support Boards
1. Install 2'' x 4'' and 1'' x 4'' tarp support boards as shown in (Fig. 20).
31
Brentwood Assembly Instructions
Meijer.com
Fig. 20a
3/4'' screw
N. Install Canopy.
1. Install canopy as shown in (Fig. 20a).
Note: Make certain pleats are facing outward when
canopy is installed.
2. Secure canopy in six locations (Fig. 20b).
Fig. 20b
Washer
3/4'' Screw
3 Per Side
32
Fig. 21
Meijer.com
1'' x 4'' x 47-1/2''
21-1/2''
Brentwood Assembly Instructions
Fig. 21a
(3)
2-1/2'' screws
per joint
1-1/4'' screw
2-1/2'' screw
(2)
1-1/4'' screws
per joint
O. Install Protective Board and Window Dressing
1. Secure protective 1'' x 4'' barrier board as shown in (Fig. 21).
2. Attach Window Sill and Shutters as shown in (Fig. 21a).
33
Brentwood Assembly Instructions
Meijer.com
1/4'' washer
1 - 3/4'' Panhead screw
Fig. 22
washer
1 - 3/4'' Panhead screw
11"
1 - 3/4'' Panhead screw
Deck Surface
P. Safety Handles.
1. Mount (2) safety handles in the Climbing Wall and Lookout Mountain openings, approximately 11'' above thedeck surface (Fig. 22).
2. Reference page 30 for Climbing Wall assembly and page 36 for Lookout Mountain assembly.
34
Fig. 23
Meijer.com
Brentwood Assembly Instructions
Fig. 23a
(4)
1-1/4'' screws
1'' x 3'' x 23-1/2''
UNDER DECK VIEW
1-1/4'' screw
R. Slide Installation.
1'' Truss Screw
Use truss head screws to
to secure slide to deck.
Fig. 23b
1. Attach Deck Support as shown in (Fig. 23).
2. Install Slide centered in the provided opening asshown in (Fig. 23a).
3. Attach Stake to end of slide as shown in (Fig. 23b).
35
(2)
1-1/4'' screws
per joint
2'' x 4'' x 17-1/4''
2'' Above Ground
Brentwood Assembly Instructions
Meijer.com
Fig. 24
(2) 2-1/2''
screws per joint
1-1/2"
(2) 2-1/2'' screws per joint
2" x 4" x 25-1/2"
(3) 2-1/2'' screws per
2" x 4" x 36"
2" x 4" x 25-1/2"
12"
2" x 4" x 5"
joint
2" x 4" x 36"
15-1/2''
brace
dig (2) 12" deep holes
hole locations
2'' x 4'' x 17-1/4''
stake
Fig. 24a
Note: If stakes are not close enough to the wall to be secured, dig
out the area around the stake(s) and reposition them until the
wall and stakes meet. Fill in any ground removed and pack
firmly.
2-1/2'' screw
S. Lookout Mountain Attachment:
1.Assemble the wall support as illustrated in (Fig. 24). Use three 2-1/2" screws to attach the 2" x 4" boards
and two 2-1/2" screws per joint for the remaining assembly.
2.Place the top of the wall in front of the opening of the climbing unit. Center the top of the wall within the
opening of the unit. Note: The edge of the wall should be firmly positioned against the climbing unit (see
Fig. 24a). Do not attach the wall at this time.
3.Note the location of four holes in the sides of the wall (two each side). These holes will be used to secure the
stakes and bracing. Mark the locations of these holes on the ground directly below the position of the holes
on the wall. Remove the wall from the unit.
4.Dig four (4) holes approximately 12" below grade at the hole locations shown in (Fig. 24a).
5.Pound the 18" stakes into the ground at the proper hole locations. Leave approximately 6" of each stake
above grade. Level the grade around the stakes to assure the base of the wall is securely seated.
36
Fig. 24b
Meijer.com
Brentwood Assembly Instructions
four (4) 1" trusshead screws
T. Lookout Mountain Attachment:
1.Reposition the wall in the opening of the climbing unit. Center the top of the wall in the opening of the unit.
The edge of the wall should be firmly positioned against the climbing unit and the stakes should be inside the
base of the wall. Secure the wall to the rail using four (4) 1'' Truss Head screws as indicated in (Fig. 24b).
Secure the base to the stakes using one 1-1/4" panhead screw per joint.
2.Place the brace beneath the wall. Position the legs in the holes dug previously and adjust the brace until the
brace lines up with the holes of the wall. Attach the wall to the brace using one 1-1/4" panhead screw per
joint. Square the brace to the ground. Note: The bottom rail of the brace should rest firmly on the ground.
Adjust the grade as required. Fill in each of the holes and level the surrounding grade.
37
Brentwood Assembly Instructions
•WARNING•
Do NOT Put Chain Here
Chain goes
through here
2 for FUN
Glider Seat
Meijer.com
Fig. 25
(2) 2-1/2'' screws
top of swing beam
Bolt Cover
Fig. 25a
U. 2 FOR FUN SWING.
1. Place Bolt Covers over the top of the swing hangers and loc nuts. Secure to the supports using 2-1/2'' screwsper Bolt Cover, as shown in (Fig. 25).
2. Thread chains through 2 for Fun handles as shown in (Fig. 25a).
3. Attach handle assembly to seat using (1) 6 1/2" hex head bolts, (1) 5/16" loc washer, (2) 5/16" washers,and (1) 5/16" loc nut. Locate hardware as shown in (Fig. 25a). Repeat this for the other side.
NOTE: Do not overtighten bolts. The bolt threads should not extend beyond the end of loc nut.
Overtightening can damage the 2 For Fun Glider assembly and cause injury. Check this connection
frequently to see if the Loc Nut stays in position. If there is any problem keeping the loc nut in position.
Replace it immediatly.
4. Attach 2 for FUN Glider to set. Crimp all swing hangers and clamps tightly.
38
Fig. 25b
Meijer.com
steering wheel
Brentwood Assembly Instructions
Steering Wheel
V. Steering Wheel Installation.
1. Choose a desired location for the
steering wheel and drill a 3/8"
diameter hole through the lumber.
NOTE: If lumber is greater than 2"
Carriage Bolt
in depth, you will need to
counterbore the hole appropriately.
2. Mount steering wheel to climbing
unit as indicated in (Fig. 25b).
3. Snap steering wheel cap into place
(Fig. 25b).
metal strap
Anchor-It
Flat Washer
1-1/2"
lag bolt
1. D
etermine the final location of your activity center.
2. Place the Anchor-It stakes adjacent to the base and near
the corners of your activity center (at the bottom of the legs
on swing sets) and twist the auger-style stakes into the
ground until only the loop is exposed.
3. Place the metal strap through the loop of the Anchor-It
stake and secure it to the unit with a lag screw and washer
as illustrated to the right. Note: Attach the strap to the unit
with as little play as possible using whatever holes in the
strap that work best.