Swanstone BD-4896 Installation

Page 1
Bathtub Deck Panel
BD-4896
Register your warranty at www.swanstone.com.
Read and Understand
Before Installing
Product WarningsSafety GuidelinesKit ContentsRequired ToolsPreparation TipsInstallation ProcedureCleaning & MaintenanceSurface RepairWarranty Information
Form # 229
Page 2
Page 3
800-325-7008 3 The Swan Corporation – Swanstone
The Swanstone Assurance — if our product is
properly installed and maintained, as stated in these
instructions, it will not leak.
RRRReeeemmmmeeeemmmmbbbbeeeerrrr SSSSaaaaffffeeeettttyyyy FFFFiiiirrrrsssstt
tt
The Swan Corporation, the makers of the Swanstone Wall Systems and Panels, cannot anticipate every possible circumstance that might involve a potential hazard during the installation of our product(s). The warnings and instructions in this installation guide are, therefore, not all-inclusive. If a tool, installation procedure, or work method that is not specifically recommended by the Swan Corporation is used, you must satisfy yourself that it is safe. You should also make sure that the Swanstone product(s) will not be damaged by the methods you choose. The Swan Corporation will not be held responsible for water damage of any kind in connection with the installation of one of our Swanstone bath/shower/panel kits.
To avoid product damage, personal injury, or even possible death, carefully read, understand, and follow all the instructions in this installation guide before installing this product(s). Do not use cleaning fluids or operate power tools unless you read and understand the instructions and warnings in this and all other applicable labels or manuals. Proper use of tools and the products described in this guide is your responsibility.
WARRANTY
This product is covered by a Limited Lifetime Warranty. Refer to the Warranty section in this manual for complete details.
SSaavvee tthhiiss mmaannuuaall ffoorr ffuuttuurree rreeffeerreennccee..
Important information on cleaning, maintenance, and repair is contained within.
IMPORTANT NOTICE
WARNING
Page 4
IMPORTANT NOTICE: Indicates that equipment or property damage can result if instructions are not followed.
Read and Understand the Manual
It is the responsibility of any individual who installs or maintains this product to fully
understand and follow proper installation and maintenance procedures. Be aware of the inherent dangers in the use of power tools when installing this product. Read and understand all Warnings, Cautions, and Important Notices in this manual.
Work Safely
DO NOT proceed if any doubt arises about the
correct or safe method of performing anything
found in this or other Swanstone manuals. The installation of this product can require using power tools. Do not use power tools without adequate training. If necessary, hire or consult a trained professional for expert assistance before continuing.
Use Proper Tools
Always use proper tools which are in good,
working condition during the installation of the
Swanstone products. Using tools other than those listed could adversely affect the integrity of floors, pipes, walls, or this product and could result in water damage or other damage to floors, pipes, walls, or other portions of your building or home.
Do Not Use Nails
Do not use nails to secure the panel to the
framing. The panel mounts to the mating
surface with clear silicone only. Only use the supplied clear silicone to mount this product. Never use hammers, nails, or screws, which could adversely affect the integrity of this product. Nails and screws could puncture the Swanstone panel, resulting in water or other damage to floors, pipes, walls, or other portions of your building or home.
Inspect Before Cutting
Make sure no electrical wiring or plumbing is
present before cutting into a wall to install any
accessories.
Wall Conditions
Inspect the walls before installing the
Swanstone panels. Never install panels over
damp walls or an existing mold condition.
CAUTION: Indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury. It may also be used to alert against unsafe practices.
Use Proper Installation Methods
Follow all instructions related to wall surface preparation. Failure to follow such instructions
could cause the panels to detach from the wall surface after installation, resulting in personal injury. Failure to follow these instructions could result in water damage.
Lifting Hazard
According to the National Institute for Occupational Safety and Health, the
recommended maximum safe lifting weight is 51 pounds, with all lifting conditions perfect—minimal forward reach, steady load close to the body, straight back, load between knees and shoulders, and good grips. To avoid personal injury, always use these proper lifting techniques and use two people to move heavy cartons. The box containing the Swanstone tub deck weighs over 151 pounds. Use the appropriate lifting devices to move the load. Always use two people when lifting heavy or bulky cartons. DO NOT attempt to lift objects that are too heavy.
WHEN CARRYING A HEAVY LOAD—GET HELP!
Slipping Hazard
Do not install this product in the presence of water. Installing this product without drying all
surfaces, or in the presence of water, could cause you to slip and fall due to wet floors or spilled fluids. Personal injury can result from slips or falls. Before installation, dry all surfaces, including the floor, with a cloth or paper towel. Clean up all water or spilled fluids immediately.
Tripping Hazard
Personal injury can result from tripping over power cords, tools, or other items. DO NOT leave items laying around the work area.
Personal Protection
Be sure to use all personal protective equipment, such as sturdy work
boots, preferably with steel toes, gloves, and hard hat, if necessary, to ensure your own safety. To prevent possible damage to your hearing, always wear ear protection, such as earmuffs or earplugs, when working around power tools.
IMPORTANT NOTICE
The Swan Corporation – Swanstone 4 800-325-7008
Safety Guidelines
CAUTION
Page 5
Cutting Hazard
The installation of the Swanstone product may require using power tools. Keep hands away
from the cutting edge of any tool used in the installation of our product. Placing fingers in or around the cutting blades could result in serious personal injury.
Sharp Edge Hazard
After cutting the edge of a Swanstone panel, it
can be sharp. Wear protective gloves to
prevent personal injury.
Room Temperature
Allow the Swanstone panel and silicone sealants to adjust to room
temperature for at least six hours before installation. The panel should be installed at temperatures not less than 65 degrees. The panel should not be installed in areas where the temperature may drop below freezing (32 degrees F). Failure to follow this recommendation could adversely affect the silicone sealants, which holds the panel to the mounting surface.
WARNING: Indicates a potentially hazardous situation which, if not avoided, could result in serious injury or death.
Eye Protection
Be sure to use all personal protective equipment to ensure your own safety. To avoid
eye injury, always wear protective glasses with side shields when using power tools. Also make sure no one else can be injured by flying particles when using power tools.
Fire Hazard
Personal injury or death can result from a fire caused by
flammable liquids or silicone sealants. Cleaners or solvents can be highly explosive, resulting in personal injury or even death when not used properly. Clean up any flammable substance immediately. Sparks or open flames can cause flammable substances to ignite. DO NOT smoke while working on or near any flammable substance.
Solvents Hazard
Follow all manufacturer’s safety instructions for silicone sealants and denatured alcohol.
Alcohol vapors are both flammable and hazardous to breathe. Silicone vapors may irritate eyes and nose. Personal injury can result from improperly handling or use of products such as denatured alcohol. Always follow the manufacturers recommendations for the safe use of these products. Ventilate any work area before beginning to apply silicone sealants, cleaning agents, or solvents.
Fumes Hazard
The fumes from the sealants and solvents used by the installer can be harmful if used in an unventilated
room. Always work in a well-ventilated area.
Dust Hazard
When cutting or drilling the Swanstone product, use a dust collection method
which prevents dust particles from going into the air. Always work in a well-ventilated area. Always use an OSHA approved dust mask when cutting, drilling, or sanding Swanstone products.
Power Tool Hazard
To prevent personal injury or possible
death, always follow the electrical
safety recommendations of the power tool’s manufacturer. Do not use power tools in an unsafe manner. Power tools should only be connected to a circuit protected by a ground-fault circuit interrupter (GFI).
Shock Hazard
Never use electric power tools around
water, condensation, or other liquids.
Electric shock can cause severe burns, significant injuries, and even death. If an extension cord is required, always use an OSHA approved extension cord. Power cords should only be connected to a circuit protected by a ground-fault circuit interrupter (GFI).
Electrical Shock Hazard
Contacting live electrical wiring with power tools or hand tools can cause
serious injury or death. Make sure all related circuit breakers are turned OFF. Test for live circuits or wiring inside any wall where installation of the Swanstone product requires cutting into a wall.
Electrocution Hazard
Water and other liquids conduct electric current and can create a short
circuit, resulting in injury or death. Keep all liquids away from electrical cords and power tools. DO NOT create a short circuit between a source of electricity and a liquid by being in contact with both simultaneously.
800-325-7008 5 The Swan Corporation – Swanstone
Safety Guidelines
WARNING
Page 6
Followed carefully, these installation instructions will result in an easy, trouble-free installation of your Swanstone product. Any deviations, additions, and/or deletions from the prescribed installation, without prior written approval of our Customer Service Department, will void the warranty covering this product. Not following the directions could also result in personal injuries, water damage, and other damage to floors, pipes, walls, and other portions of your building or home.
Required Tools
Circular saw with 60 to 80 tooth carbide blade
Sabre saw (straight up and down travel) with
bi-metal blade (14 teeth per inch)
Drill with 3/8” drill bit
Tape measure
Masking tape (2” wide works best)
Caulking gun
Clean paper towels or shop towels
Kit Contents
Confirm that all parts of this kit have been included before beginning installation.
(102 long x 54 wide x 4” thick; 151 lbs.)
1 — Tub Deck Panel (48” wide x 96” long x 0.400”
thick)
Unpackaging
Use care when opening the box so that you do not
damage the panel.
This product is shipped to you or your retail center
after careful inspection. After purchasing the kit, carefully unbox and inspect the product for any shipping damage that may have occurred. If damage is found, report it immediately to the store of purchase. After inspection and during installation, protect the products from construction damage, by moving them to another room or area until ready to install.
Store the panel in a flat area to avoid warpage until
the time of installation. Do not store the panel outside of the original packaging in a vertical position.
Please use the model number located on the side of
the box or the front of this manual when contacting us with questions concerning the installation of this product.
Helpful Hints
Read these instructions carefully and familiarize
yourself with the various parts of the kit.
The variety of installations possible for this kit may
require procedures other than those shown. Ensure the tub frame and deck construction is correctly sized, plumb, and square.
Allow sufficient time for the parts in this kit to adjust to
room temperature. We do not recommend installation of this product at temperatures below 65 degrees.
Sawhorses with 2 x 4 cross-members or a worktable
is helpful during the installation process.
Always transport the panel vertically. Use care when
laying the panel flat to prevent flexing, especially after it has the center cutout for the tub.
Store unused materials away from the work area to
prevent accidental damage.
Preparation Tips
Prepare the mounting surface with 1/2” (13 mm)
moisture-resistant concrete board or plywood. Never install our products directly on any surface that is, or may become, wet or damp.
Turn off the hot and cold water supply.
Ensure all plumbing or electrical work inside the tub
base is finished prior to installation of the concrete board or Swanstone panel.
Swanstone panels have a finished side and a
nonfinished backer side. The Swanstone panel has a sticker or stickers attached to the nonfinished backer side and, upon installation, should be placed against the mounting surface.
The mounting surface must be free of dirt, film,
waxes, or any other residues.
Caulking Tips
Follow the instructions on the caulking tube.
When job is complete, inspect all caulked areas for
gaps and fill as needed.
Clean up any excess silicone using denatured alcohol
and a clean cloth.
Be very careful not to disturb caulk joints.
The Swan Corporation – Swanstone 6 800-325-7008
General Information
Page 7
Installation on Cement Board or Wood
Swanstone panels can be installed over a variety of products. If you intend to apply the panel to any surface, other than those described, consult with a professional contractor.
Surface must be dry, smooth, and free of any dust,
soap scum, or any other contaminants.
To ensure proper adhesion of the Swanstone product,
the concrete board or wood surface must be sealed with a water or oil-based primer/sealer.
After the primer/sealer is completely dry, complete the
installation following the instructions in this manual.
Disclaimer
The information contained in this Installation Manual
is given free of charge. It is based upon technical data which we believe to be reliable and is intended for use, by persons having knowledge of this technical area, at their own discretion and risk. Swanstone assumes no responsibility for results obtained or damage incurred from the use of this material either in whole or in part by the buyer.
This manual will give you basic instructions for the
installation of the product in a step-by-step sequence that will work in most types of installations. If you have an installation application that is not covered in this manual, please call your local Swanstone distributor or contact Swanstone directly for additional information about your application.
Follow all installation instructions. Failure to follow
these instructions could result in personal injuries, water damage, or other damage to floors, pipes, walls, or other portions of your building or home.
1. Follow the tub manufacturer’s instructions for the
construction of the tub frame and deck.
2. Install 1/2” water-resistant cement board or plywood
over the tub’s framing. Follow the manufacturer’s recommendations for installation.
The template for the center cutout will also be used again for the Swanstone panel. Do not damage the template during this step of the procedure.
3. Use the template provided by the manufacturer of
the tub to mark the location for the center cutout. Drill a pilot hole with a 3/8” drill bit; this will normally be large enough to insert the jigsaw blade. Cut out the center of the tub deck.
IMPORTANT NOTICE
800-325-7008 7 The Swan Corporation – Swanstone
General Information Installation Procedure
TD4896-002
TD4896-003
Page 8
4. Apply a coat of water or oil-based primer/sealer to all the surfaces of the cement board or plywood (follow the manufacturers’ instructions). Allow the primer to dry thoroughly before applying any adhesive.
Dust Hazard
When cutting or drilling the Swanstone product, use a dust collection method
which prevents dust particles from going into the air. Always work in a well-ventilated area. Always use an OSHA approved dust mask when cutting, drilling, or sanding Swanstone products.
5. Using a circular saw with a 60 to 80 tooth carbide
blade, cut the panel to fit the dimensions of the tub deck. To avoid scratches, place pieces of masking tape over the area where the saw contacts the Swanstone panel.
The Swanstone panel must be adequately supported when making the center cutout for the tub. Because of the reduced width of the material at the sides of the panel, it will easily bend, deform, and/or possibly break.
Marking the exact location for the center cutout is a critical step. If the location is marked wrong and the panel is cut, it cannot be patched or repaired.
6. Use the template provided by the manufacturer of the tub to mark the location for the center cutout on the Swanstone panel.
7. Remove the template and/or place pieces of masking tape over the area where the sabre saw contacts the Swanstone panel.
8. Drill a pilot hole with a 3/8” drill bit; this will normally be large enough to insert the sabre saw blade. Using a sabre saw (straight up and down travel) with bi-metal blade (14 teeth per inch), cut the center opening for the tub.
IMPORTANT NOTICE
The Swan Corporation – Swanstone 8 800-325-7008
Installation Procedure
TD4896-004
WARNING
TD4896-006a
TD4896-006b
TD4896-006c
TD4896-005
Page 9
DO NOT force a panel to fit a bowed or curved surface as it may break; furthermore, the resiliency of the panel can break the adhesive bond to the mounting surface.
9. Dry fit the panel and make any necessary adjustments.
Do not use oil-based cleaners, such as mineral spirits, to clean the panel. The oil in the cleaner will prevent the panel from adhering properly to the mounting surface.
Fumes Hazard
The fumes from the sealants and solvents used by the installer can be harmful if used in an unventilated room.
Always work in a well-ventilated area.
10. Remove the panel and clean the back with
denatured alcohol or another non oil-based cleaning solvent.
11. Apply a 1/4 to 3/8” bead of adhesive to the tub deck, as shown. Keep the bead approximately 1” from the edge to prevent the adhesive from pressing out from under the panel. Also apply an “S” bead of adhesive, as shown. Follow the adhesive manufacturers’ instructions and note all ventilation and installation precautions.
12. Very carefully turn the panel over and place it onto the tub deck. Make sure the panel is correctly positioned. It is important to apply hand pressure to the entire surface of the panel to bond it to the mounting surface and then place weight on top of it to hold it firmly in place.
IMPORTANT NOTICE
IMPORTANT NOTICE
800-325-7008 9 The Swan Corporation – Swanstone
Installation Procedure
WARNING
TD4896-008
TD4896-007
TD4896-009
Page 10
Follow the caulking manufacturers’ instructions on the tube for proper application. Allow at least 24 hours for caulk and adhesive to set before using the tub.
13. After the tub is installed, apply a bead of the color­matched caulk (included in the kit) around the tub and to any other mating wall joints.
The installation is now complete. DO NOT discard these installation instructions. PLEASE LEAVE THEM WITH THE HOMEOWNER.
Care and Cleaning
The Swanstone products are stain and abrasion resistant; however, the finish requires reasonable care.
Because cleaning products change over time, always check the manufacturers’ instructions to make sure it is compatible with plastic. DO NOT use a cleaner if the label indicates it should not be used on plastics. DO NOT use spray-on cleaners that require daily use without immediately rinsing with water to stop the chemical cleaning reaction because damage will result and void the warranty.
Day-To-Day Cleanup
Simply wipe the surfaces with a clean towel to remove watermarks and residues. All Swanstone products can be cleaned with warm water, a soft cloth, and normal household detergents or cleansers, such as Fantastic, Formula 409, Clorox Clean-up, Handy Andy, Mr. Clean, or Lestoil. Always rinse off cleaners within five minutes of application.
Occasional scrubbing with household abrasive cleaners ensures that the original luster is maintained.
Caulking Joints
Inspect caulking joints monthly for damage or any signs of separation from the mating surface. Cracks in the caulking will allow water to leak into the surrounding surfaces. Reapply caulking to any joint showing signs of wear or cracking. Failure to inspect and repair caulking joints will void the warranty.
Surface Repair
Light Scratches
Use 400 grit sandpaper to remove light scratches in the surface.
Deep Scratches or Gouges
For deeper scratches or gouges, use 220 or 320 grit sandpaper. A “Scotchbright pad” can be used to blend the repair into the surrounding area.
IMPORTANT NOTICE
IMPORTANT
The Swan Corporation – Swanstone 10 800-325-7008
Installation Procedure Maintenance & Surface Repair
TD4896-010
Page 11
LIMITED WARRANTY
FOR RESIDENTIAL APPLICATIONS
If a Swanstone product covered by this warranty is found to be defective in materials or workmanship, after inspection by an authorized Swan Corporation representative, we will repair, or at our option, exchange the product for a similar model. This warranty extends for a designated period of time, so long as it remains in use in its original place of installation.
This warranty covers products installed in accordance with the Swan Corporation’s installation instructions, used as recommended, and not damaged due to misuse, abuse, or improper installation. It does not apply to any seams or changes made to the product by professional tradesmen or fabricators.
The warranty applies only to the original purchaser and installation of these products in residential applications. It does not apply to commercial applications.
The Swan Corporation’s option to repair or exchange the products under this warranty does not cover any labor or other costs of removal or installation, nor shall The Swan Corporation be responsible for any other incidental or consequential damages attributable to a product defect or to the repair or exchange of a defective product.
Limited Lifetime Warranty
Swanstone Wall Panels, Trim Kits, and Accessories
LIMITED WARRANTY
FOR COMMERCIAL APPLICATIONS
If a Swanstone product covered by this warranty is found to be defective in materials or workmanship, after inspection by an authorized Swan Corporation representative, we will repair, or at our option, exchange the product for a similar model. This warranty extends for a designated period of time, so long as it remains in use in its original place of installation.
This warranty covers only products installed in accordance with the Swan Corporation’s installation instructions, used as recommended, and not damaged due to misuse, abuse, or improper installation. It does not apply to any seams or changes made to the product by professional tradesmen or fabricators.
The warranty applies only to the original purchaser and installation of these products in commercial applications.
The Swan Corporation’s option to repair or exchange the products under this warranty does not cover any labor or other costs of removal or installation, nor shall The Swan Corporation be responsible for any other incidental or consequential damages attributable to a product defect or to the repair or exchange of a defective product.
25-Year Limited Warranty
Swanstone Tub and Shower Wall Panels, Trim Kits, and Accessories
800-325-7008 11 The Swan Corporation – Swanstone
Warranty
Page 12
www.swanstone.com
Form # 229
September 2008
Save these Installation Instructions for future reference. They
provide important information on cleaning, maintenance, and
surface repair of the Swanstone Wall Systems and Panels.
Loading...