Swagelok S60 Series, S62, A60 Series, S63, A63 Mounting Instructions

...
A60 Fire / S60 Steam Series Ball Valves
Kit Contents
• Panel Mount Brackets (2)
• Cap Screws (4)
• Bolts (4)
• Panel Mount Cover (except 62 series with oval handle)
• Lubricant with MSDS sheet
• Assembly Instructions
Maximum Panel Thickness
62 series 0.188 in. (4.77 mm)
All other 60 series 0.25 in. (6.35 mm)
Assembly Instructions
Refer to the illustrations on page 2 for a 62 series and a 65 series steam ball valve.
1. Loosen and remove the top four body bolts from the
valve. Do not loosen the remaining (4) bolts.
2. Loosen and remove stem nut, stem spring, name- plate, stop plate, handle, and grounding spring from valve stem.
3. Position one of the panel mount brackets against the flange so the more closely spaced pair of holes lines up with the holes in the flange.
4. Lubricate the (4) bolts with the lubricant provided. Install (2) bolts through the holes in the bracket, flange, and into the body.
5. Position the other panel mount bracket against the other flange so the more closely spaced pair of holes lines up with the holes in the flange. Note: The tab with the threaded hole(s) should point away from the valve stem.
6. Install the other (2) bolts through the holes in the bracket, flange, and into the body. Tighten the bolts (4) according to the table below.
Torque Values
Valve
Series
S62 5.0
A63 / S63 10 (1.1) 20 (2.3) 40 (4.5) 150 (17.0) 150 (17.0)
A65 / S65 25 (2.8) 50 (5.7) 100 (11.3) 300 (33.9) 300 (33.9)
A67 / S67 35 (4.0) 75 (8.5) 150 (17.0) 400 (45.2) 400 (45.2)
A68 / S68 40 (4.5) 100 (11.3) 200 (22.6) 600 (67.8) 600 (67.8)
1st Pass 2nd Pass 3rd Pass 4th Pass 5th Pass
(0.57) 10 (1.1) 20 (2.3) 40 (4.5) 40 (4.5)
in.·lb (N·m)
Panel Mount Instructions
Panel Mount Cover
Bolts (4)
Cap Screws (4)
Panel Mount Brackets (2)
7. Drill mounting holes in panel. See the diagram and
table on page 3 and / or use template on page 4.
Note: For 62 series in a horizontal piping system,
turn template 90° to drill holes.
8. Line up the panel mounting holes with the mount­ing bracket tabs. Use the cap screws to fasten the valve assembly to the panel.
9. Reinstall the grounding spring, handle, and stop plate. Install cover plate.
Note: 62 series uses a cover plate with lever style
handle only.
10. Reinstall the stem spring, and stem nut. Tighten the stem nut to the value shown below.
Note: 62 series does not use a stem spring.
Torque Values
Valve
Series
S62 25
A63 / S63 50 (5.7)
A65 / S65 100 (11.3)
A67 / S67 150 (17.0)
A68 / S68 150 (17.0)
in.·lb (N·m)
1st Pass
(2.8)
Lubricant
MS-INS-S60PMK Revision 2 09-10
2
MS-INS-S60PMK
Revision 2 09-10
Cover plate
Handle / stop plate
Cap screws
Panel
62 Series Ball Valve
Stem nut
Grounding spring
(2)
Panel mounting holes (2)
Panel mount
bracket (1)
Top body bolts (2)
Flange
Body
Stem
Panel mount
bracket (1)
Tab
Flange
Top body bolts (2)
65 Series Ball Valve
Stem nut
Stem spring
Cover plate
Stop plate
Handle
Grounding spring
Top body bolts (2)
2
Cap screws
Panel
Panel mount
bracket (1)
(4)
Flange
Body
Stem
Panel mounting holes (4)
Panel mount
bracket (1)
Top body bolts (2)
Tab
Flange
Loading...
+ 2 hidden pages