1. General Description.................................................................................................................................3
2. Features & Specifications/Standard Accessories...................................................................................3
10. Mounting the Screen................................................................................................................................12
SVS Plasma One 4 Lift Installation InstructionsPage 2 of 16
SVS PLASMA ONE 4 LIFT
12" TO CEILING
CLOSURE
4' FROM
CEILING TO BOT TOM
OF BOOM
NOTE: FOR REFERENCE ONLYACCESSORIES/PLASMA MAY
EFFECT OVERALL DIMENSIONS
1. General Description:
The SVS Plasma One Series Lift is designed to
support display screens up to 200 lbs. [90.72 kg] and
provides an ideal solution for audio/video
applications with restricted vertical ceiling spaces.
This model only requires 14-inches [35.6 cm] of
vertical space (stores the display screen horizontally
above the ceiling). When required for viewing the
screen pivots 90 degrees to 4-feet below the ceiling
(the 4-feet [1.22 cm] refers to the distance from the
false ceiling to the bottom of the boom).
Figure 1. shows the SVS Plasma One 4 Lift with
Display Screen (Screen not included).
2. Features & Specifications
Minimum Vertical Ceiling Space Required for the lift: As little as 14-inches [35.6cm] (Allows 7-inches for screen & fixed
mount)
Figure 1. SVS Plasma One 4 Lift
Lift Positions:
•Storage – Screen can be aesthetically stored above the ceiling when not in use.
•Lowered – Screen lowers 4-feet for viewing.
Lowering Distance: 48-inches [121.9 cm] Lift Capacity: Up to 200 lbs [90.7 kg]Lift Weight: 100lbs [45.3 kg]
Maximum Screen Height: 55-inches [139.7 cm]
Voltage
Material
•110V/60Hz @ 1.5 Amps
•Steel/Aluminum/Nylon
•220V/50Hz@ .75 Amps
•Steel/Aluminum/Nylon
Low Voltage Control
•Wall Plate Controller supplied with lift
•24VAC Contact Closure Control (latch to move lift)
•Connects to lift using supplied 12-pin connector and 75-feet of cable (22 AWG/9 Conductor)
Precision Grooved Drum – Provides accurate and level tracking for consistent screen image.
Patented Fail Safe Drum Lock System – Insures safety in the event of mechanical failure. 100% safety record for 20 years of
manufacturing.
Quiet and Strong Motor – Extra quiet for meeting and presentations or simply for home use.
Redundant Limit Switches (up & down) – For secure and safe motor shutdown.
SVS Plasma One 4 Lift Installation InstructionsPage 3 of 16
Standard Accessories:
PCC-1 Ceiling closure framework kit to be installed underneath the Plasma One boom and used to attach
customer supplied ceiling closure material (not supplied by SVS – SVS recommends 10 GA
aluminum sheeting). On site fabrication and assembly required, ceiling closure dimensions will
be based on the screen size. See Figure 9 to calculate the dimensions.
PCC-2Complete customized ceiling closure. Includes framework and ceiling closure material cut to
the screen dimensions. Ceiling material is two pieces with seam between the Plasma One motor
plate and screen plate. Supplied unpainted.
PPS-2Plenum Shroud. Protective metal cover for lift and screen in plenum rated ceiling.
PMT-9Fixed-mounting bracket used to attach the screen to the Plasma One boom (model varies with
screen used).
3. SVS PLASMA ONE LIFT WARRANTY
SVS, Inc. 's limited warranty only covers failures due to defects in materials or workmanship that occur
during normal use. This limited warranty DOES NOT cover failures resulting from accident, misuse,
abuse, neglect, mishandling, misapplication, faulty or improper installation and set-up adjustments,
improper maintenance or alteration. Specific product warranties are as follows:
A 1-year parts and 90-day factory labor warranty applies to the following SVS products:
•Plasma One Lift
•Accessory #14 Floor Access Motor Control
A 1-year parts and 90-day factory labor warranty applies to the following SVS products:
•Lift Motors
•PCC-2 Closure Panel
•Accessory PPS-2 Plenum Shroud
•Accessory PMT-9 Screen Mount
A Return Material Authorization (RMA) number must be received from SVS prior to the return of any
product. Products returned to SVS must be shipped adequately insured with freight prepaid and the
RMA number clearly noted on the shipping label and crate. Items received freight collect or without
RMA numbers clearly noted will be refused. Lift model, serial number, and proof of original purchase
date may be required before warranty performance is rendered.
SVS Plasma One 4 Lift Installation InstructionsPage 4 of 16
IMPORTANT: PLEASE READ THROUGH ALL INSTRUCTIONS
BEFORE BEGINNING YOUR INSTALLATION.
This Lift is designed to be used with a Wall Plate Controller, either automatically or manually controlled.
The Wall Plate Controller features a key switch which can be placed in the “ON” or “OFF” positions for
normal operation. The “Off” position disables the Lift. The “ON” position allows the lift to be lowered
and raised using the Up/Down toggle switch.
WARNING
To prevent personal injury and property damage when servicing any part of the Lift drive system
(electric motor/brake, drive chain/sprockets, steel lift cables, and/or drum lock assembly) the screen must
be removed and the Lift's boom supported by straps, chain, or cable to prevent it from lowering
unexpectedly while the drive system is being serviced.
IMPORTANT
Please read all Accessory Installation Instructions before beginning your installation. If an Accessory
PSS-1 Plenum Shroud is to be installed with the Lift. Please read the Accessory Installation Instructions
before beginning your installation. The Lift support structure will need to allow enough space to install
the mounting hardware for the Plenum Shroud.
TO AVOID CABLE SPILLS
•Do not push the lift boom upwards once the Lift has been installed.
•Make sure that there are no obstructions in the Lift's path. If the boom is lowered onto an
obstruction the cable will slack and spill over the cable drum.
4. PRELIMINARY INSTALLATION CHECKS
•SVS recommends that the Lift support structure holds at least four (4) times the weight of the Lift and
screen combined. The rear support structure should hold three (3) times this amount due to the up thrust
caused as the lift pivots down from the ceiling. The rear threaded rods should be reinforced
approximately 12-inches up from the lift to avoid buckling under the up thrust. Always follow your local building codes.
•Required space for the Lift, screen, and accessories should be considered prior to installation. Check for
obstructions that may prevent the Lift or accessories from being installed or operated.
•Plan for necessary Lift low voltage control cabling, screen audio/video/control cabling, and power
connections.
•Do not install the screen on the Lift until the Lift, hardware, and any accessories have been properly
installed and are operational.
•This Lift has been adjusted with cables tightly packed on the cable drum and leveled for precise tracking
prior to being shipped from the factory. Do not remove the lift's shipping blocks until instructed to do so in Section 7.
•All weight attached to the Lift must be centered on the lift's boom.
•As a reminder, clear all persons and obstructions from the Lift's path during its operation. Keep fingers
and other objects away all moving parts. Technical personnel should always be present when the Lift is
being serviced.
SVS Plasma One 4 Lift Installation InstructionsPage 5 of 16
Loading...
+ 11 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.