Surefine SF-LED16-80, SF-LED16-40, SF-LED16-120, SF-LED16-160, SF-LED16-200 Installation Instructions Manual

...
LED FLOOD LIGHTS
INSTALLATION INSTRUCTIONS
When using electrical equipment, basic safety precauons should always be followed including the following:
IMPORTANT SAFEGUARDS
READ AND FOLLOW ALL SAFETY INSTRUCTIONS
1.
2.
3.
4.
SAVE THIS INSTRUCTIONS FOR FUTURE REFERENCE
TO INSTALL:
DIRECT MOUNTING
1
*¹ Minimum M10 (3/8”) Bolts (not-provided) *² Mounng Nuts are not provided *³ Allen Wrench: 8mm (5/16”)
3
Assemble the mounng bracket to the xture by provided M10 (3/8”) round head screws.
STEP 1:
Quality You can
Trust
328 mm (12.91 inches)
40 mm (1.57 inches)
Φ12 mm (0.47 inches)
138 mm (5.43 inches)
12 mm (0.47 inches)
Mounng Bracket
81 mm
(3.19 inches)
75 mm
(2.95 inches)
Luminaire
Mounng Holes For Minimum M10 (3/8”) Mounng Bolts
Pendant Mounng Hole
Waterproof Connector
2
Celling /Wall
Mounng Blots*¹
Mounng Nuts*²
Power Cord (Cord Not shown)
Power Cord (Cord Not shown)
Allen Wrench*³
Mount the xture by TWO(2) minimum M10 (3/8”) bolts. See Figure 2.
STEP 2:
Loosen the mounng bracket screws, adjust the xture to desire posion, re-secure the screws.
STEP 3:
Connect the Power Cord to the supply wiring per “Electrical ConnecƟons” secon for compleng electrical connecons.
STEP 4:
Tighten bracket screws on both sides, luminaire installaon angle will be xed by the lock gear.
Model No.
SF-LED16-80
SF-LED16-40
SF-LED16-120
SF-LED16-160
SF-LED16-200
SF-LED16-240
40W
80W
120W
160W
200W
240W
Power
366 x340 x156 mm /14.4 x13.4 x6.1”
439 x340 x156 mm /19.4 x13.4 x6.1”
512 x340 x156 mm /20.2 x13.4 x6.1”
585 x340 x156 mm /23.0 x13.4 x6.1”
658 x340 x156 mm /26.0 x13.4 x6.1”
Dimension
4.3 kg /9.5 lbs
5.2 kg /11.5 lbs
6.0 kg /13.2 lbs
7.0 kg /15.4 lbs
7.8 kg /17.2 lbs
Weight
3.1 kg /6.8 lbs293 x340 x156 mm /11.5 x13.4 x6.1”
100-240V/277V AC, 50/60Hz, Suitable for Wet Locaons (IP65), Class I
*This product must be grounding
IMPORTANT
Check whether it concerns an AC(AlternaƟng Current) based system - 100-240V/277V AC, 50/60Hz.
This marking indicates that this product should not be disposed with other household wastes throughout the EU. To prevent possible harm to the environment or human health from uncontrolled waste disposal, recycle it responsibly to promote the sustainable reuse of material resources. To return your used device, please use the return and collecƟon systems or contact the retailer where the product was purchased. They can take this product for environmental safe recycling.
ELECTRICAL CONNECTIONS - 100-240V/277V AC, 50/60Hz
PHASE TO NEUTRAL WIRING
STEP 1:
Make the following Electrical ConnecƟons:
a.
b.
c.
Connect INPUT GROUND conductor to GREEN WIRE posiƟon of the terminal block or GROUND conductor of LED driver. Connect INPUT VOLTAGE conductor to BROWN WIRE posiƟon of the terminal block or LINE conductor of LED driver. Connect INPUT NEUTRAL conductor to BLUE WIRE posiƟon of the terminal block or NEUTRAL conductor of LED driver.
STEP 2:
Make sure all excess input wires are pushed into pole, screws are Ɵghtened.
STEP 3:
Close cover by rmly pushing cover towards xture, making sure that no wires are pinched and Sealing gasket are fully engaged.
STEP 4:
If the xture without a terminal block, please insulate all electrical connecƟons with wire nuts suitable for at least 90°C
TERMINAL BLOCK(not-provided), Use waterproof connector for wet locaƟon.
LED DRIVER
GROUND
GREEN
NEUTRAL
WHITE
NEUTRAL
BLUE
GROUND
YELLOW-GREEN
LINE
BLACK
LINE
BROWN
L
G
N
INPUT WIRING
FIXTURE WIRING
AC BASED
Input cable should be at least H05RN-F 3x1.0mm²(SJTW 18AWG) or outdoor grade cable with rubber sheathed(not supplied). The cable must have a minimum cross secƟonal area of 1.0mm²(18AWG).
*If the xture with built-in 3 in 1 dimming funcƟon, please connect INPUT
POSITIVE(+) signal conductor to DIM+ (BLUE WIRE), INPUT NEGATIVE(-) signal conductor to DIM-(WHITE WIRE) of LED driver.
WWW.SUREFINEGROUP.COM
Loosen the mounƟng bracket screws, adjust the xture to desire posiƟon, re-secure the screws.
STEP 3:
Connect the Power Cord to the supply wiring per “Electrical ConnecƟons” secƟon for compleƟng electrical connecƟons.
STEP 4:
PENDANT MOUNTING
Assemble the mounƟng bracket to the xture by provided M10 (3/8”) round head screws.
STEP 1:
AƩach Lock-Nut(A) to the boƩom of the Pendant Stem. AƩach Lock-Nut(B) by holding the interjacent Fixture Bracket and Ɵghtening Lock-Nut(B) unƟl secure. See Figure 4.
STEP 2:
4 5
Look-Nut(A)*²
Look-Nut(B)*²
Pendant Stem*¹
Pendant Stem Thread
*¹ Pendant Stem can not be the soŌ material (not-provided) *² Look Nuts are not provided
Power Cord (Cord Not shown)
Power Cord (Cord Not shown)
Loading...