Supero SUPERSERVER 6016T-URF, SUPERSERVER 6016T-UF, SUPERSERVER 6016T-NTF, SUPERSERVER 6016T-NTRF User Manual

®
SUPER
SUPERSERVER 6016T-URF S SUPERSERVER 6016T-NTRF SUPERSERVER 6016T-NTF
UPERSERVER 6016T-UF
USER’S MANUAL
The information in this User’s Manual has been carefully reviewed and is believed to be accurate. The vendor assumes no responsibility for any inaccuracies that may be contained in this document, makes no commitment to update or to keep current the information in this manual, or to notify any person or organization of the updates. Please Note: For the most up-to-date version of this
manual, please see our web site at www.supermicro.com.
Super Micro Computer, Inc. ("Supermicro") reserves the right to make changes to the product described in this manual at any time and without notice. This product, including software and docu­mentation, is the property of Supermicro and/or its licensors, and is supplied only under a license. Any use or reproduction of this product is not allowed, except as expressly permitted by the terms of said license.
IN NO EVENT WILL SUPERMICRO BE LIABLE FOR DIRECT, INDIRECT, SPECIAL, INCIDENTAL, SPECULATIVE OR CONSEQUENTIAL DAMAGES ARISING FROM THE USE OR INABILITY TO USE THIS PRODUCT OR DOCUMENTATION, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. IN PARTICULAR, SUPERMICRO SHALL NOT HAVE LIABILITY FOR ANY HARDWARE, SOFTWARE, OR DATA STORED OR USED WITH THE PRODUCT, INCLUDING THE COSTS OF REPAIRING, REPLACING, INTEGRATING, INSTALLING OR RECOVERING SUCH HARDWARE, SOFTWARE, OR DATA.
Any disputes arising between manufacturer and customer shall be governed by the laws of Santa Clara County in the State of California, USA. The State of California, County of Santa Clara shall be the exclusive venue for the resolution of any such disputes. Super Micro's total liability for all claims will not exceed the price paid for the hardware product.
FCC Statement: This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environ­ment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the manufacturer’s instruction manual, may cause harmful interference with radio communications. Operation of this equipment in a residential area is likely to cause harm­ful interference, in which case you will be required to correct the interference at your own expense.
California Best Management Practices Regulations for Perchlorate Materials: This Perchlorate warn­ing applies only to products containing CR (Manganese Dioxide) Lithium coin cells. “Perchlorate Material-special handling may apply. See www.dtsc.ca.gov/hazardouswaste/perchlorate”
WARNING: Handling of lead solder materials used in this product may expose you to lead, a chemical known to the State of California to cause birth defects and other repro­ductive harm.
Manual Revision 1.0 Release Date: December 21, 2012
Unless you request and receive written permission from Super Micro Computer, Inc., you may not copy any part of this document.
Information in this document is subject to change without notice. Other products and companies referred to herein are trademarks or registered trademarks of their respective companies or mark holders.
Copyright © 2012 by Super Micro Computer, Inc. All rights reserved.
Printed in the United States of America
Preface
About This Manual
This manual is written for professional system integrators and PC technicians. It pro­vides information for the installation and use of the SuperServer 6016T-URF/6016T­UF/6016T-NTRF/6016T-NTF. Installation and maintenance should be performed by experienced technicians only.
Manual Organization
Chapter 1: Introduction
The fi rst chapter provides a checklist of the main components included with the server system and describes the main features of the X8DTU-F serverboard and the SC815TQ-R650UBP/SC815TQ-560UBP chassis, which comprise the SuperServer 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF.
Preface
Chapter 2: Server Installation
This chapter describes the steps necessary to install the SuperServer into a rack and check out the server confi guration prior to powering up the system. If your server was ordered without processor and memory components, this chapter will refer you to the appropriate sections of the manual for their installation.
Chapter 3: System Interface
Refer here for details on the system interface, which includes the functions and information provided by the control panel on the chassis as well as other LEDs located throughout the system.
Chapter 4: System Safety
You should thoroughly familiarize yourself with this chapter for a general overview of safety precautions that should be followed when installing and servicing the SuperServer 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF.
iii
SUPERSERVER 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF User's Manual
Chapter 5: Advanced Serverboard Setup
Chapter 5 provides detailed information on the X8DTU-F serverboard, including the locations and functions of connections, headers and jumpers. Refer to this chapter when adding or removing processors or main memory and when reconfi guring the serverboard.
Chapter 6: Advanced Chassis Setup
Refer to Chapter 6 for detailed information on the SC815TQ-R650UBP/SC815TQ­560UBP server chassis. You should follow the procedures given in this chapter when installing, removing or reconfi guring SATA or peripheral drives and when replacing system power supply modules and cooling fans.
Chapter 7: BIOS
The BIOS chapter includes an introduction to BIOS and provides detailed informa­tion on running the CMOS Setup Utility.
Appendix A: BIOS Error Beep Codes
Appendix B: Installing Windows
Appendix C: System Specifi cations
iv
Notes
Preface
v
SUPERSERVER 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF User's Manual
Table of Contents
Chapter 1 Introduction
1-1 Overview ......................................................................................................... 1-1
1-2 Serverboard Features ..................................................................................... 1-2
Processors ...................................................................................................... 1-2
Memory ........................................................................................................... 1-2
UIO .................................................................................................................. 1-2
Serial ATA ....................................................................................................... 1-2
Onboard Controllers/Ports .............................................................................. 1-2
Graphics Controller ......................................................................................... 1-3
Other Features ................................................................................................ 1-3
1-3 Server Chassis Features ................................................................................ 1-3
System Power ................................................................................................. 1-3
SATA Subsystem ............................................................................................. 1-3
PCI Expansion Slots ....................................................................................... 1-3
Front Control Panel ......................................................................................... 1-4
I/O Backplane .................................................................................................. 1-4
Cooling System ............................................................................................... 1-4
1-4 Contacting Supermicro .................................................................................... 1-6
Chapter 2 Server Installation
2-1 Overview ......................................................................................................... 2-1
2-2 Unpacking the System .................................................................................... 2-1
2-3 Preparing for Setup ......................................................................................... 2-1
Choosing a Setup Location ............................................................................. 2-2
2-4 Warnings and Precautions .............................................................................. 2-2
Rack Precautions ............................................................................................ 2-2
Server Precautions .......................................................................................... 2-2
Rack Mounting Considerations ....................................................................... 2-3
Ambient Operating Temperature ................................................................ 2-3
Reduced Airfl ow ......................................................................................... 2-3
Mechanical Loading ................................................................................... 2-3
Circuit Overloading ..................................................................................... 2-3
Reliable Ground ......................................................................................... 2-3
2-5 Installing the System into a Rack ................................................................... 2-4
Identifying the Sections of the Rack Rails ...................................................... 2-4
Installing the Inner Rails ................................................................................. 2-4
Installing the Outer Rails ................................................................................. 2-5
vi
Table of Contents
Installing the Server into the Rack .................................................................. 2-6
Installing the Server into a Telco Rack ........................................................... 2-7
2-6 Checking the Serverboard Setup .................................................................... 2-8
2-7 Checking the Drive Bay Setup ........................................................................ 2-9
Chapter 3 System Interface
3-1 Overview ......................................................................................................... 3-1
3-2 Control Panel Buttons ..................................................................................... 3-1
3-3 Control Panel LEDs ........................................................................................ 3-2
3-4 Hard Drive Carrier LEDs ................................................................................. 3-4
Chapter 4 Standardized Warning Statements for AC Systems
4-1 About Standardized Warning Statements ....................................................... 4-1
Warning Defi nition ........................................................................................... 4-1
Installation Instructions .................................................................................... 4-4
Circuit Breaker ................................................................................................ 4-5
Power Disconnection Warning ........................................................................ 4-6
Equipment Installation ..................................................................................... 4-8
Restricted Area ................................................................................................ 4-9
Battery Handling ............................................................................................ 4-10
Redundant Power Supplies .......................................................................... 4-12
Backplane Voltage ........................................................................................ 4-13
Comply with Local and National Electrical Codes ........................................ 4-14
Product Disposal ........................................................................................... 4-15
Hot Swap Fan Warning ................................................................................. 4-16
Power Cable and AC Adapter ...................................................................... 4-18
Chapter 5 Advanced Serverboard Setup
5-1 Handling the Serverboard ............................................................................... 5-1
Precautions ..................................................................................................... 5-1
Unpacking ....................................................................................................... 5-1
5-2 Processor and Heatsink Installation................................................................ 5-2
Installing LGA1366 Processors ....................................................................... 5-2
Installing the Heatsink ..................................................................................... 5-4
Removing the Heatsink ................................................................................... 5-5
5-3 Connecting Cables .......................................................................................... 5-6
Connecting Data Cables ................................................................................. 5-6
Connecting Power Cables .............................................................................. 5-6
Connecting the Control Panel ......................................................................... 5-6
5-4 I/O Ports .......................................................................................................... 5-7
5-5 Installing Memory ............................................................................................ 5-8
vii
SUPERSERVER 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF User's Manual
5-6 Adding PCI Cards ......................................................................................... 5-10
5-7 Serverboard Details .......................................................................................5-11
X8DTU-F Quick Reference ........................................................................... 5-12
5-8 Connector Defi nitions .................................................................................... 5-13
5-9 Jumper Settings ............................................................................................ 5-19
5-10 Onboard Indicators ........................................................................................ 5-22
5-11 SATA Port Connections ................................................................................. 5-23
5-12 Installing Software ......................................................................................... 5-24
Super Doctor III ............................................................................................. 5-25
5-13 Onboard Battery ............................................................................................ 5-27
Chapter 6 Advanced Chassis Setup
6-1 Static-Sensitive Devices .................................................................................. 6-1
Precautions ..................................................................................................... 6-1
6-2 Control Panel .................................................................................................. 6-2
6-3 System Fans ................................................................................................... 6-3
System Fan Failure ......................................................................................... 6-3
6-4 Drive Bay Installation/Removal ....................................................................... 6-4
Removing the Front Bezel .............................................................................. 6-4
Accessing the Drive Bays ............................................................................... 6-5
Hard Drive Installation ..................................................................................... 6-6
DVD-ROM Drive Installation ........................................................................... 6-8
6-5 Power Supply .................................................................................................. 6-9
6016T-URF/6016T-NTRF ................................................................................ 6-9
Power Supply Failure ................................................................................. 6-9
6016T-UF/6016T-NTF ................................................................................... 6-10
Power Supply Failure ............................................................................... 6-10
Chapter 7 BIOS
7-1 Introduction ...................................................................................................... 7-1
7-2 Main Setup ...................................................................................................... 7-2
7-3 Advanced Setup Confi gurations...................................................................... 7-4
7-4 Security Settings ........................................................................................... 7-21
7-5 Boot Confi guration ........................................................................................ 7-23
7-6 Exit Options ................................................................................................... 7-24
Appendix A BIOS Error Beep Codes Appendix B Installing Windows Appendix C System Specifi cations
viii
Chapter 1: Introduction
Chapter 1
Introduction
1-1 Overview
The SuperServer 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF is a high-end server comprised of two main subsystems: the SC815TQ-R650UBP (6016T­URF/6016T-NTRF)/SC815TQ-560UBP (6016T-UF/6016T-NTF) 1U server chassis and the X8DTU-F dual processor serverboard. Please refer to our web site for information on operating systems that have been certifi ed for use with the system.
Note: a complete list of safety warnings is provided on the Supermicro web site at
http://super-dev/about/policies/safety_information.cfm
In addition to the serverboard and chassis, various hardware components have been included with the system, as listed below:
One slim DVD-ROM drive (DVM-TEAC-DVD-SBT)
One SATA to USB adapter for DVD-ROM drive (CDM-USATA-G)
One internal USB cable for DVD-ROM drive (CBL-0341L)
Four sets of 4-cm counter-rotating fans (FAN-0086L4)
One air shroud (MCP-310-18001-0N)
Two passive CPU heatsinks (SNK-P0037)
Riser Cards: (see Section 5-6 for details)
One RSC-R1UU-UE16 for PCI-E card (6016T-URF/6016T-UF only) One RSC-R1UU-2E8 for two PCI-E cards (6016T-NTRF/6016T-NTF only)
SATA Accessories
One SATA backplane (BPN-SAS-815TQ) One SATA iPASS cable (CBL-0188L) (6016T-URF/6016T-UF only) Four SATA drive carriers (MCP-220-00001-01) One SATA cable set (CBL-0190L) (6016T-NTRF/6016T-NTF only) One SGPIO cable (CBL-0157) (6016T-NTRF/6016T-NTF only)
One rackmount kit (CSE-PT51L)
SuperServer 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF User's Manual
1-1
SUPERSERVER 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF User's Manual
1-2 Serverboard Features
At the heart of the SuperServer 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF lies the X8DTU-F, a dual processor serverboard based on the Intel® IOH-36D (North Bridge) + ICH10R (South Bridge) chipset. Below are the main features of the X8DTU-F. (See Figure 1-1 for a block diagram of the chipset).
Processors
The X8DTU-F supports single or dual two Intel® 5500 Series processors in LGA1366 sockets. Please refer to our web site for a complete listing of supported processors (www.supermicro.com).
Memory
The X8DTU-F has 240-pin DIMM sockets that can support up to 96 GB of reg­istered ECC DDR3-1333/1066/800 or up to 24 GB of unbuffered ECC DDR3­1333/1066/800MHz SDRAM. Please refer to Chapter 5 for installing memory.
UIO
The X8DTU-F is a specially-designed serverboard that features Supermicro's UIO (Universal I/O) technology. UIO serverboards have a PCI Express x8 slot that can support any one of several types of UIO card types to add SAS ports, additional LAN ports, etc. to the serverboard. This allows the user to tailor the serverboard to their own needs.
Note: the server does not come with a UIO card installed.
Serial ATA
An on-chip (ICH10R) SATA controller is integrated into the X8DTU-F to provide a six-port, 3 Gb/sec SATA subsystem, which is RAID 0, 1, 5 and 10 supported. The SATA drives are hot-swappable units.
Note: You must have RAID set up to enable the hot-swap capability of the SATA drives. Documentation on RAID setup guidelines can be found on our web site.
Onboard Controllers/Ports
The color-coded I/O ports include one COM port, a VGA (monitor) port, two USB
2.0 ports, PS/2 mouse and keyboard ports and two gigabit Ethernet ports.
1-2
Chapter 1: Introduction
Graphics Controller
The X8DTU-F features an integrated Matrox G200eW graphics chip, which includes 8 MB of DDR2 memory.
Other Features
Other onboard features that promote system health include onboard voltage moni­tors, auto-switching voltage regulators, chassis and CPU overheat sensors, virus protection and BIOS rescue.
1-3 Server Chassis Features
The 6016T-URF/6016T-NTRF is built upon the SC815TQ-R650UBP chassis while the 6016T-UF/6016T-NTF is built upon the SC815TQ-560UBP chassis. Details on the chassis and on servicing procedures can be found in Chapter 6.The following is a general outline of the main features of both chassis.
System Power
The SC815TQ-R650UBP features a redundant 650W power supply consisting of two power modules. The system does not need to be shut down when replacing or removing a single power supply module.
The SC815TQ-560UBP features a single 560W power supply module. The system must be shut down when replacing or removing this power supply module.
SATA Subsystem
The SC815TQ-R650UBP/SC815TQ-560UBP chassis was designed to support four hot-swap SATA hard drives.
Note: In the 6016T-NTRF/6016T-NTF, SATA drives are connected to the onboard SATA ports.
PCI Expansion Slots
6016T-URF/6016T-UF: A riser card (RSC-R1UU-E8PR, optional) on the right side of the chassis can support AOC-PG-i2+ add-on card to provide two Gb LAN ports. The left side supports a UIO card and one PCI-E x16 card. These two systems can support four SAS/SATA drives with an optional UIO SAS card. See our web site for details (http://www.supermicro.com/products/nfo/UIO.cfm).
1-3
SUPERSERVER 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF User's Manual
6016T-NTRF/6016T-NTF: A riser card (RSC-R1UU-E8PR, optional) on the right side of the chassis can support AOC-PG-i2+ add-on card to provide two Gb LAN ports. The left side supports two PCI-E x8 cards.
See section 5-6 for details. (Right and left refer to the side when viewed from the front of the system. The 6016T-NTRF/6016T-NTF does not support a UIO card.)
Front Control Panel
The chassis' control panel provides you with system monitoring and control. LEDs indicate system power, HDD activity, network activity (two) and UID/overheat/fan fail/power fail. A main power button, a system reset button and a UID button are also included.
I/O Backplane
The SC815TQ-R650UBP/SC815TQ-560UBP is an extended ATX form factor chas­sis that is designed to be used in a 1U rackmount confi guration. Ports on the I/O backplane include one COM port, a VGA port, two USB 2.0 ports, PS/2 mouse and keyboard ports and two gigabit Ethernet ports. A UID (Unit Identifi er) button and LED are also located beside the LAN2 Ethernet port.
Cooling System
The SC815TQ-R650UBP/SC815TQ-560UBP chassis has an innovative cooling design that features four sets of 4-cm counter-rotating fans located in the middle section of the chassis. There is a "Fan Speed Control Mode" setting in BIOS that allows chassis fan speed to be determined by system temperature. The power supply module also includes a cooling fan.
1-4
Chapter 1: Introduction
Figure 1-1. Intel IOH-36D/ICH10R Chipset:
System Block Diagram
Note: This is a general block diagram. Please see Chapter 5 for details.
C
DDR3 DIMM
B
DDR3 DIMM
A
B
CPU 1
C
DDR3 DIMM
Gen2 x16
PCI-E x16
(Lane Reversal)
Gen2 x8
PCI-E x8
in x4 Slot
Gen2 x8
PCI-E x8
(Lane Reversal)
COMA
COMB
QPI
QPI
Port 1
Ports 7,8,9,10
Intel 5520
Ports 5,6
ESI
Ports 3,4
ESI
USB
PCI
BMC
VGA
Port 0
Ports 1,2
CLINK
CLINK
Ports 8,10
RJ45
CPU 2
QPI
Gen2 x4
Intel ICH10R
SATA
SATA 0 SATA 1
SATA 2 SATA 3 SATA 4 SATA 5
D
E
F
Intel 82576
RJ45
RJ45
SST
25VF016
SPI
PCI- E Ports 1-6
LPC
W83527HG
PS2 KB/MS
USB
SIO
E
DDR3 DIMM
USB 0/1 USB 2/3 USB 4/5 USB 6/7
F
DDR3 DIMM
DDR3 DIMM
1-5
SUPERSERVER 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF User's Manual
1-4 Contacting Supermicro
Headquarters
Address: Super Micro Computer, Inc.
980 Rock Ave.
San Jose, CA 95131 U.S.A. Tel: +1 (408) 503-8000 Fax: +1 (408) 503-8008 Email: marketing@supermicro.com (General Information)
support@supermicro.com (Technical Support) Web Site:
Europe
Address: Super Micro Computer B.V.
Tel: +31 (0) 73-6400390 Fax: +31 (0) 73-6416525 Email: sales@supermicro.nl (General Information)
Asia-Pacifi c
Address: Super Micro Computer, Inc.
www.supermicro.com
Het Sterrenbeeld 28, 5215 ML
's-Hertogenbosch, The Netherlands
support@supermicro.nl (Technical Support)
rma@supermicro.nl (Customer Support)
4F, No. 232-1, Liancheng Rd
Chung-Ho Dist., New Taipei City 235
Taiwan Tel: +886-(2) 8226-3990 Fax: +886-(2) 8226-3991 Web Site: Technical Support: Email: support@supermicro.com.tw Tel: +886-(2)-8226-3990
www.supermicro.com.tw
1-6
Chapter 2: Server Installation
Chapter 2
Server Installation
2-1 Overview
This chapter provides a quick setup checklist to get your SuperServer 6016T­URF/6016T-UF/6016T-NTRF/6016T-NTF up and running. Following these steps in the order given should enable you to have the system operational within a minimum amount of time. This quick setup assumes that your system has come to you with the processors and memory preinstalled. If your system is not already fully integrated with a serverboard, processors, system memory etc., please turn to the chapter or section noted in each step for details on installing specifi c components.
2-2 Unpacking the System
You should inspect the box the SuperServer 6016T-URF/6016T-UF/6016T­NTRF/6016T-NTF was shipped in and note if it was damaged in any way. If the server itself shows damage you should fi le a damage claim with the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold the 6016T-URF/6016T­UF/6016T-NTRF/6016T-NTF. It should be situated in a clean, dust-free area that is well ventilated. Avoid areas where heat, electrical noise and electromagnetic fi elds are generated. You will also need it placed near a grounded power outlet. Be sure to read the Rack and Server Precautions in the next section.
2-3 Preparing for Setup
The box the SuperServer 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF was shipped in should include two sets of rail assemblies, two rail mounting brackets and the mounting screws you will need to install the system into the rack. Follow the steps in the order given to complete the installation process in a minimum amount of time. Please read this section in its entirety before you begin the installation procedure outlined in the sections that follow.
2-1
SUPERSERVER 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF User's Manual
Choosing a Setup Location
Leave enough clearance in front of the rack to enable you to open the front door
completely (~25 inches) and approximately 30 inches of clearance in the back of the rack to allow for suffi cient airfl ow and ease in servicing.This product is for installation only in a Restricted Access Location (dedicated equipment rooms, service closets and the like).
This product is not suitable for use with visual display work place devices
acccording to §2 of the the German Ordinance for Work with Visual Display Units.
2-4 Warnings and Precautions
Rack Precautions
Ensure that the leveling jacks on the bottom of the rack are fully extended to
the fl oor with the full weight of the rack resting on them.
In single rack installation, stabilizers should be attached to the rack. In multiple
rack installations, the racks should be coupled together.
Always make sure the rack is stable before extending a component from the
rack.
You should extend only one component at a time - extending two or more si-
multaneously may cause the rack to become unstable.
Server Precautions
Review the electrical and general safety precautions in Chapter 4.
Determine the placement of each component in the rack before you install the
rails.
Install the heaviest server components on the bottom of the rack fi rst, and then
work up.
Use a regulating uninterruptible power supply (UPS) to protect the server from
power surges, voltage spikes and to keep your system operating in case of a power failure.
2-2
Chapter 2: Server Installation
Allow the hot plug SATA drives and power supply modules to cool before touch-
ing them.
Always keep the rack's front door and all panels and components on the servers
closed when not servicing to maintain proper cooling.
Rack Mounting Considerations
Ambient Operating Temperature
If installed in a closed or multi-unit rack assembly, the ambient operating tempera­ture of the rack environment may be greater than the ambient temperature of the room. Therefore, consideration should be given to installing the equipment in an environment compatible with the manufacturer’s maximum rated ambient tempera­ture (Tmra).
Reduced Airfl ow
Equipment should be mounted into a rack so that the amount of airfl ow required for safe operation is not compromised.
Mechanical Loading
Equipment should be mounted into a rack so that a hazardous condition does not arise due to uneven mechanical loading.
Circuit Overloading
Consideration should be given to the connection of the equipment to the power supply circuitry and the effect that any possible overloading of circuits might have on overcurrent protection and power supply wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing this concern.
Reliable Ground
A reliable ground must be maintained at all times. To ensure this, the rack itself should be grounded. Particular attention should be given to power supply connec­tions other than the direct connections to the branch circuit (i.e. the use of power strips, etc.).
2-3
SUPERSERVER 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF User's Manual
2-5 Installing the System into a Rack
This section provides information on installing the 6016T-URF/6016T-UF/6016T­NTRF/6016T-NTF into a rack unit with the rack rails provided. If the system has already been mounted into a rack, you can skip ahead to Sections 2-5 and 2-6.
There are a variety of rack units on the market, which may mean the assembly procedure will differ slightly. You should also refer to the installation instructions that
came with the rack unit you are using.
Identifying the Sections of the Rack Rails
You should have received two rack rail assemblies in the rack mounting kit. Each assembly consists of two sections: an inner fi xed chassis rail that secures directly to the server chassis and an outer fi xed rack rail that secures directly to the rack itself (see Figure 2-1). Two pairs of short brackets to be used on the front side of the outer rails are also included.
Installing the Inner Rails
Both the left and right side inner rails have been pre-attached to the chassis. Pro­ceed to the next step.
Figure 2-1. Identifying the Sections of the Rack Rails
(right side rail shown)
2-4
Chapter 2: Server Installation
Installing the Outer Rails
Begin by measuring the distance from the front rail to the rear rail of the rack. Attach a short bracket to the front side of the right outer rail and a long bracket to the rear side of the right outer rail. Adjust both the short and long brackets to the proper distance so that the rail can fi t snugly into the rack. Secure the short bracket to the front side of the outer rail with two screws and the long bracket to the rear side of the outer rail with three screws. Repeat these steps for the left outer rail.
Locking Tabs: Both chassis rails have a locking tab, which serves two functions. The fi rst is to lock the server into place when installed and pushed fully into the rack, which is its normal position. Secondly, these tabs also lock the server in place when fully extended from the rack. This prevents the server from coming completely out of the rack when you pull it out for servicing.
Figure 2-2. Installing the Rack Rails
Warning: do not pick up the server with the front handles. They are de-
signed to pull the system from a rack only.
Stability hazard. The rack stabilizing mechanism must be in place, or the rack must be bolted to the fl oor before you slide the unit out for servicing. Failure to stabilize the rack can cause the rack to tip over.
2-5
SUPERSERVER 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF User's Manual
Installing the Server into the Rack
You should now have rails attached to both the chassis and the rack unit. The next step is to install the server into the rack. Do this by lining up the rear of the chassis rails with the front of the rack rails. Slide the chassis rails into the rack rails, keeping the pressure even on both sides (you may have to depress the locking tabs when inserting). See Figure 2-3.
When the server has been pushed completely into the rack, you should hear the locking tabs "click".
Figure 2-3. Installing the Server into a Rack
Warning! To prevent bodily injury when mounting or servicing this unit in a
rack, you must take special precautions to ensure that the system remains stable. The following guidelines are provided to ensure your safety:
This unit should be mounted at the bottom of the rack if it is the only unit in
the rack.
When mounting this unit in a partially fi lled rack, load the rack from the bottom
to the top with the heaviest component at the bottom of the rack.
If the rack is provided with stabilizing devices, install the stabilizers before
mounting or servicing the unit in the rack.
2-6
Chapter 2: Server Installation
Installing the Server into a Telco Rack
To install the 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF into a Telco type rack, use two L-shaped brackets on either side of the chassis (four total). First, determine how far follow the server will extend out the front of the rack. Larger chassis should be positioned to balance the weight between front and back. If a bezel is included on your server, remove it. Then attach the two front brackets to each side of the chassis, then the two rear brackets positioned with just enough space to accom­modate the width of the telco rack. Finish by sliding the chassis into the rack and tightening the brackets to the rack.
Figure 2-4. Installing the Server into a Telco Rack
2-7
SUPERSERVER 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF User's Manual
2-6 Checking the Serverboard Setup
After you install the 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF in the rack, you will need to open the top cover to make sure the serverboard is properly installed and all the connections have been made.
Accessing the Inside of the System
1. First, grasp the two handles on either side and pull the system straight out until it locks (you will hear a "click").
2. Depress the two buttons on the top of the chassis to release the top cover (1).
3. Push the cover away from you (toward the rear of the chassis) until it stops (2). You can then lift the top cover from the chassis to gain full access to the inside of the server. See Figure 2-5.
4. To remove the system from the rack completely, depress the locking tabs in the chassis rails (push the right-side tab down and the left-side tab up) to continue to pull the system out past the locked position.
Checking the Components
1. You may have one or two processors already installed in the serverboard. Each processor needs its own heatsink. See Chapter 5 for instructions on processor and heatsink installation.
2. Your server system may have come with system memory already installed. Make sure all DIMMs are fully seated in their slots. For details on adding system memory, refer to Chapter 5.
3. If desired, you can install add-on cards to the system. See Chapter 5 for details on installing PCI add-on cards.
4. Make sure all power and data cables are properly connected and not blocking the chassis airfl ow. See Chapter 5 for details on cable connections.
2-8
Chapter 2: Server Installation
Figure 2-5. Accessing the Inside of the System
2-7 Checking the Drive Bay Setup
Next, you should check to make sure the peripheral drives and the SATA drives and SATA backplane have been properly installed and all connections have been made.
Checking the Drives
1. All drives are accessable from the front of the server. The SATA disk drives can be installed and removed from the front of the chassis without removing the top chassis cover.
2. A slim DVD-ROM drive should be preinstalled in your server. For servicing the DVD-ROM drive, you will need to remove the top chassis cover. Refer to Chapter 6 if you need to reinstall a DVD-ROM drive to the system.
3. Depending upon your system's confi guration, your system may have one or more drives already installed. If you need to install SATA drives, please refer to Chapter 6.
2-9
SUPERSERVER 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF User's Manual
Checking the Airfl ow
1. Airfl ow is provided by four sets of 4-cm fans (each set of fans consists of two fans that are mounted back to back). The system component layout was carefully designed to direct suffi cient cooling airfl ow to the components that generate the most heat.
2. Note that all power and data cables have been routed in such a way that they do not block the airfl ow generated by the fans.
Providing Power
1. The last thing you must do is to provide input power to the system. Plug the power cords from the power supply modules into a high-quality power strip that offers protection from electrical noise and power surges.
2. It is recommended that you use an uninterruptible power supply (UPS).
2-10
Chapter 3: System Interface
Chapter 3
System Interface
3-1 Overview
There are several LEDs on the control panel as well as others on the SATA drive carriers to keep you constantly informed of the overall status of the system as well as the activity and health of specifi c components. There are also two buttons on the chassis control panel and an on/off switch on the power supply. This chapter explains the meanings of all LED indicators and the appropriate response you may need to take.
3-2 Control Panel Buttons
There are three push-buttons located on the front of the chassis: a reset button, a UID button and a power on/off button.
UID
Depressing the UID (unit identifi er) button illuminates an LED on both the front and rear of the chassis for easy system location in large stack confi gurations. The LED will remain on until the button is pushed a second time. Another UID button on the rear of the chassis serves the same function.
Reset
Use the reset button to reboot the system.
3-1
SUPERSERVER 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF User's Manual
Power
The main power button is used to apply or remove power from the power supply to the server system. Turning off system power with this button removes the main power but keeps standby power supplied to the system.
3-3 Control Panel LEDs
The control panel located on the front of the SC815TS-R560U/SC815TS-560UBP chassis has fi ve LEDs. These LEDs provide you with critical information related to different parts of the system. This section explains what each LED indicates when illuminated and any corrective action you may need to take.
Universal Information LED
When this LED blinks red quickly, it indicates a fan failure and when blinking red slowly a power failure. The LED will be blue when used for UID (Unit Identifi er). When on continuously it indicates an overheat condition, which may be caused by cables obstructing the airfl ow in the system or the ambient room temperature being too warm. Check the routing of the cables and make sure all fans are present and operating normally. You should also check to make sure that the chassis covers are installed. Finally, verify that the heatsinks are installed properly (see Chapter
5). This LED will remain fl ashing or on as long as the indicated condition exists. See the table below for descriptions of the LED states.
Figure 3-1. Universal Information LED States
Universal Information LED States
State Indication
Fast Blinking Red (1x/sec) Fan Fail
Solid Red CPU Overheat
Slow Blinking Red (1x/4 sec) Power Fail
Solid Blue Local UID Button Depressed
Blinking Blue IPMI-Activated UID
Note: deactivating the UID LED must be performed in the same way it was activated. (If the UID LED was activated via IPMI, you can only turn the LED off via IPMI and not with the UID button.)
3-2
2
NIC2
Indicates network activity on LAN2 when fl ashing.
1
NIC1
Indicates network activity on LAN1 when fl ashing.
Chapter 3: System Interface
HDD
On the SuperServer 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF, this light indicates SATA and/or DVD-ROM drive activity when fl ashing.
Power
Indicates power is being supplied to the system's power supply units. This LED should normally be illuminated when the system is operating.
3-3
SUPERSERVER 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF User's Manual
3-4 Hard Drive Carrier LEDs
Each hard drive carrier has two LEDs.
Green: When illuminated, the green LED on the front of the drive carrier in-
dicates drive activity. A connection to the drive backplane enables this LED to blink on and off when that particular drive is being accessed.
Red: The red LED indicates two states. When blinking, it indicates the drive is
rebuilding. When solid, it indicates a drive failure. If a hard drive fails, you should be notifi ed by your system management software. Please refer to Chapter 6 for instructions on replacing failed hard drives.
3-4
Chapter 4: Warning Statements for AC Systems
Chapter 4
Standardized Warning Statements for AC Systems
4-1 About Standardized Warning Statements
The following statements are industry standard warnings, provided to warn the user of situations which have the potential for bodily injury. Should you have questions or experience difficulty, contact Supermicro's Technical Support department for assistance. Only certifi ed technicians should attempt to install or confi gure components.
Read this appendix in its entirety before installing or confi guring components in the Supermicro chassis.
These warnings may also be found on our web site at http://www.supermicro.com/ about/policies/safety_information.cfm.
Warning Defi nition
Warning!
This warning symbol means danger. You are in a situation that could cause bodily injury. Before you work on any equipment, be aware of the hazards involved with electrical circuitry and be familiar with standard practices for preventing accidents.
警告の定義
この警告サインは危険を意味します。
人身事故につながる可能性がありますので、いずれの機器でも動作させる前に、
電気回路に含まれる危険性に注意して、標準的な事故防止策に精通して下さい。
此警告符号代表危险。
您正处于可能受到严重伤害的工作环境中。在您使用设备开始工作之前,必须充分 意识到触电的危险,并熟练掌握防止事故发生的标准工作程序。请根据每项警告结 尾的声明号码找到此设备的安全性警告说明的翻译文本。
此警告符號代表危險。
您正處於可能身體可能會受損傷的工作環境中。在您使用任何設備之前,請注意觸 電的危險,並且要熟悉預防事故發生的標準工作程序。請依照每一注意事項後的號 碼找到相關的翻譯說明內容。
4-1
SUPERSERVER 6016T-URF/6016T-UF/6016T-NTRF/6016T-NTF User's Manual
ןונקת תורהצהאהרהז
Warnung
WICHTIGE SICHERHEITSHINWEISE
Dieses Warnsymbol bedeutet Gefahr. Sie befi nden sich in einer Situation, die zu Verletzungen führen kann. Machen Sie sich vor der Arbeit mit Geräten mit den Gefahren elektrischer Schaltungen und den üblichen Verfahren zur Vorbeugung vor Unfällen vertraut. Suchen Sie mit der am Ende jeder Warnung angegebenen Anweisungsnummer nach der jeweiligen Übersetzung in den übersetzten Sicherheitshinweisen, die zusammen mit diesem Gerät ausgeliefert wurden.
BEWAHREN SIE DIESE HINWEISE GUT AUF.
INSTRUCCIONES IMPORTANTES DE SEGURIDAD
Este símbolo de aviso indica peligro. Existe riesgo para su integridad física. Antes de manipular cualquier equipo, considere los riesgos de la corriente eléctrica y familiarícese con los procedimientos estándar de prevención de accidentes. Al nal de cada advertencia encontrará el número que le ayudará a encontrar el texto traducido en el apartado de traducciones que acompaña a este dispositivo.
GUARDE ESTAS INSTRUCCIONES.
IMPORTANTES INFORMATIONS DE SÉCURITÉ
Ce symbole d'avertissement indique un danger. Vous vous trouvez dans une situation pouvant entraîner des blessures ou des dommages corporels. Avant de travailler sur un équipement, soyez conscient des dangers liés aux circuits électriques et familiarisez-vous avec les procédures couramment utilisées pour éviter les accidents. Pour prendre connaissance des traductions des avertissements gurant dans les consignes de sécurité traduites qui accompagnent cet appareil, référez-vous au numéro de l'instruction situé à la fi n de chaque avertissement.
CONSERVEZ CES INFORMATIONS.
ןה תואבה תורהצהא ינפמ שמתשמה תא ריהזהל תנמ לע ,היישעתה ינקת יפ לע תורהז הלבח
ה וא תולאש שיו הדימב .תירשפא תיזיפי ,יהשלכ היעבב תולקתרוציל שי הכימת תקלחמ םע רשק
רידגהל וא ןיקתהל םיאשר דבלב םיכמסומ םיאנכט .ורקימרפוס לש תינכט תאה .םיביכר
תרדגה וא תנקתה ינפל ואולמב חפסנה תא
אורקל שי .ורקימרפוס יזראמב םיביכרה
4-2
Loading...
+ 90 hidden pages