Supero 2026TT-HIBXRF, 2026TT-H6IBXRF, 2026TT-HIBQRF, 2026TT-H6RF, 2026TT-H6IBQRF User Manual

®
SUPER
SuperServer 2026TT-HTRF SuperServer 2026TT-HIBXRF SuperServer 2026TT-HIBQRF SuperServer 2026TT-H6RF SuperServer 2026TT-H6IBXRF SuperServer 2026TT-H6IBQRF
USER’S MANUAL
Revision 1.0a
The information in this User’s Manual has been carefully reviewed and is believed to be accurate. The vendor assumes no responsibility for any inaccuracies that may be contained in this document, makes no commitment to update or to keep current the information in this manual, or to notify any person or organization of the updates. Please Note: For the most up-to-date version of this
manual, please see our web site at www.supermicro.com.
Super Micro Computer, Inc. ("Supermicro") reserves the right to make changes to the product described in this manual at any time and without notice. This product, including software and docu­mentation, is the property of Supermicro and/or its licensors, and is supplied only under a license. Any use or reproduction of this product is not allowed, except as expressly permitted by the terms of said license.
IN NO EVENT WILL SUPERMICRO BE LIABLE FOR DIRECT, INDIRECT, SPECIAL, INCIDENTAL, SPECULATIVE OR CONSEQUENTIAL DAMAGES ARISING FROM THE USE OR INABILITY TO USE THIS PRODUCT OR DOCUMENTATION, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. IN PARTICULAR, SUPERMICRO SHALL NOT HAVE LIABILITY FOR ANY HARDWARE, SOFTWARE, OR DATA STORED OR USED WITH THE PRODUCT, INCLUDING THE COSTS OF REPAIRING, REPLACING, INTEGRATING, INSTALLING OR RECOVERING SUCH HARDWARE, SOFTWARE, OR DATA.
Any disputes arising between manufacturer and customer shall be governed by the laws of Santa Clara County in the State of California, USA. The State of California, County of Santa Clara shall be the exclusive venue for the resolution of any such disputes. Super Micro's total liability for all claims will not exceed the price paid for the hardware product.
FCC Statement: This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environ­ment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the manufacturer’s instruction manual, may cause harmful interference with radio communications. Operation of this equipment in a residential area is likely to cause harmful interference, in which case you will be required to correct the interference at your own expense.
California Best Management Practices Regulations for Perchlorate Materials: This Perchlorate warn­ing applies only to products containing CR (Manganese Dioxide) Lithium coin cells. “Perchlorate Material-special handling may apply. See www.dtsc.ca.gov/hazardouswaste/perchlorate”
WARNING: Handling of lead solder materials used in this product may expose you to lead, a chemical known to the State of California to cause birth defects and other repro­ductive harm.
Manual Revision 1.0a Release Date: February 24, 2011
Unless you request and receive written permission from Super Micro Computer, Inc., you may not copy any part of this document.
Information in this document is subject to change without notice. Other products and companies referred to herein are trademarks or registered trademarks of their respective companies or mark holders.
Copyright © 2011 by Super Micro Computer, Inc. All rights reserved.
Printed in the United States of America
Preface
About This Manual
This manual is written for professional system integrators and PC technicians. It provides information for the installation and use of the SuperServer 2026TT-HTRF/ HDIBXRF/HDIBQRF. Installation and maintenance should be performed by expe­rienced technicians only.
The SuperServer SuperServer 2026TT-HTRF/HDIBXRF/HDIBQRF is a 2U Twin2 (four serverboards/nodes in a 2U chassis) rackmount server based on the SC217HQ-R1400BP server chassis and four Super X8DTT-HF+/X8DTT-HIBXF+/ X8DTT-HIBQF+ serverboards. The "(H)" in the product name indicates that the system is cableless.
The main differences between the various serverboards and the servers they are in is shown in the table below:
Model Variations (Differences between X8DTT-x Models)
X8DTT-HF+ X8DTT-HIBXF+ X8DTT-HIBQF+
IPMI 2.0 w/ KVM Over LAN
Infi niBand Connection
DDR IB QDR IB
Yes Yes Yes
No Yes Yes
No Yes No No No Yes
Preface
Manual Organization
Chapter 1: Introduction
The fi rst chapter provides a checklist of the main components included with the server system and describes the main features of the Super X8DTT-HF+/X8DTT­HIBXF+/X8DTT-HIBQF+ serverboard and the SC217HQ-R1400BP chassis.
Chapter 2: Server Installation
This chapter describes the steps necessary to install the SuperServer 2026TT­HTRF/HDIBXRF/HDIBQRF into a rack and check out the server confi guration prior to powering up the system. If your server was ordered without the processor and memory components, this chapter will refer you to the appropriate sections of the manual for their installation.
iii
SUPERSERVER 2026TT-HxRF User's Manual
Chapter 3: System Interface
Refer to this chapter for details on the system interface, which includes the functions and information provided by the control panel on the chassis as well as other LEDs located throughout the system.
Chapter 4: System Safety
You should thoroughly familiarize yourself with this chapter for a general overview of safety precautions that should be followed when installing and servicing the SuperServer 2026TT-HTRF/HDIBXRF/HDIBQRF.
Chapter 5: Advanced Serverboard Setup
Chapter 5 provides detailed information on the X8DTT-HF+/X8DTT -HIBXF+/X8DTT ­HIBQF+ serverboard, including the locations and functions of connectors, headers and jumpers. Refer to this chapter when adding or removing processors or main memory and when reconfi guring the serverboard.
Chapter 6: Advanced Chassis Setup
Refer to Chapter 6 for detailed information on the SC217HQ-R1400BP 2U rack­mount server chassis. You should follow the procedures given in this chapter when installing, removing or reconfi guring SATA or peripheral drives and when replacing system power supply units and cooling fans.
Chapter 7: BIOS
The BIOS chapter includes an introduction to BIOS and provides detailed informa­tion on running the CMOS Setup Utility.
Appendix A: BIOS Error Beep Codes Appendix B: Installing Windows Appendix C: System Specifi cations
iv
Notes
Preface
v
SUPERSERVER 2026TT-HxRF User's Manual
Table of Contents
Chapter 1 Introduction
1-1 Overview .........................................................................................................1-1
1-2 Serverboard Features .....................................................................................1-2
Processors ......................................................................................................1-2
Memory ...........................................................................................................1-2
Onboard SAS (2026TT-H6 models only) ........................................................1-2
Serial ATA ........................................................................................................ 1-2
PCI Expansion Slots .......................................................................................1-3
Ethernet Ports .................................................................................................1-3
Onboard Controllers/Ports .............................................................................. 1-3
Graphics Controller .........................................................................................1-3
Other Features ................................................................................................ 1-3
Infi niBand ........................................................................................................1-3
1-3 Server Chassis Features ................................................................................ 1-5
System Power ................................................................................................. 1-5
SATA Subsystem ............................................................................................. 1-5
Control Panel .................................................................................................. 1-5
Rear I/O Panel ................................................................................................1-5
Cooling System ............................................................................................... 1-5
1-4 2U Twin: System Notes ...................................................................................1-6
Nodes ..............................................................................................................1-6
System Power ................................................................................................. 1-6
SAS/SATA Backplane/Drives ..........................................................................1-6
1-5 Contacting Supermicro ....................................................................................1-7
Chapter 2 Server Installation
2-1 Overview .........................................................................................................2-1
2-2 Unpacking the System .................................................................................... 2-1
2-3 Preparing for Setup ......................................................................................... 2-1
Choosing a Setup Location .............................................................................2-2
Rack Precautions ............................................................................................ 2-2
Server Precautions ..........................................................................................2-2
Rack Mounting Considerations .......................................................................2-3
Ambient Operating Temperature ................................................................2-3
Reduced Airfl ow ......................................................................................... 2-3
Mechanical Loading ................................................................................... 2-3
Circuit Overloading ..................................................................................... 2-3
vi
Table of Contents
Reliable Ground ......................................................................................... 2-3
Removing the Protective Film ......................................................................... 2-4
2-4 Rack Mounting Instructions .............................................................................2-5
Separating the Sections of the Rack Rails ..................................................... 2-5
Installing The Inner Rails on the Chassis ....................................................... 2-6
Installing the Outer Rails on the Rack ............................................................ 2-7
Standard Chassis Installation ......................................................................... 2-8
2-5 Checking the Serverboard Setup ....................................................................2-9
2-6 Preparing to Power On ................................................................................. 2-10
Chapter 3 System Interface
3-1 Overview .........................................................................................................3-1
3-2 Control Panel Buttons ..................................................................................... 3-1
Power ..............................................................................................................3-1
UID ..................................................................................................................3-1
3-3 Control Panel LEDs ........................................................................................ 3-2
Alert LED .........................................................................................................3-2
NIC ..................................................................................................................3-2
3-4 Drive Carrier LEDs .......................................................................................... 3-3
Chapter 4 System Safety
4-1 Electrical Safety Precautions .......................................................................... 4-1
4-2 General Safety Precautions ............................................................................4-2
4-3 ESD Precautions ............................................................................................. 4-3
4-4 Operating Precautions .................................................................................... 4-4
Chapter 5 Advanced Serverboard Setup
5-1 Handling the Serverboard ............................................................................... 5-1
Precautions .....................................................................................................5-1
5-2 I/O Ports ..........................................................................................................5-2
Unpacking .......................................................................................................5-2
5-3 Processor and Heatsink Installation................................................................5-3
Installing LGA1366 Processors .......................................................................5-3
Installing a CPU Heatsink ............................................................................... 5-5
Removing the Heatsink ................................................................................... 5-6
5-4 Installing Memory ............................................................................................ 5-7
5-5 Adding PCI Expansion Cards ......................................................................... 5-9
5-6 Serverboard Details ...................................................................................... 5-10
X8DTT-H+ Series Quick Reference ...............................................................5-11
5-7 Connector Defi nitions ....................................................................................5-12
5-8 Jumper Settings ............................................................................................ 5-16
vii
SUPERSERVER 2026TT-HxRF User's Manual
5-9 Onboard Indicators ........................................................................................5-18
5-10 Serial ATA Ports ............................................................................................5-19
5-11 Installing Additional Drivers ...........................................................................5-20
5-12 Confi guring Super Doctor III ......................................................................... 5-21
Chapter 6 Advanced Chassis Setup
6-1 Static-Sensitive Devices ..................................................................................6-1
Precautions .....................................................................................................6-1
Unpacking .......................................................................................................6-1
6-2 Control Panel ..................................................................................................6-2
6-3 System Fans ................................................................................................... 6-2
Fan Confi guration ............................................................................................ 6-3
System Fan Failure ......................................................................................... 6-3
6-4 Hard Drive Installation/Removal......................................................................6-4
Overview .........................................................................................................6-4
Installing and Removing Hard Drives ............................................................. 6-4
6-5 Node Installation/Removal ..............................................................................6-7
6-6 Installing the Air Shrouds ................................................................................ 6-9
Air Shrouds ..................................................................................................... 6-9
6-7 Power Supply .................................................................................................. 6-9
Chapter 7 BIOS
7-1 Introduction ......................................................................................................7-1
Starting BIOS Setup Utility ..............................................................................7-1
How To Change the Confi guration Data .........................................................7-1
Starting the Setup Utility .................................................................................7-2
7-2 Main Setup ...................................................................................................... 7-2
7-3 Advanced Setup Confi gurations...................................................................... 7-4
7-4 Security Settings ........................................................................................... 7-23
7-5 Boot Confi guration ........................................................................................ 7-24
7-6 Exit Options ................................................................................................... 7-26
7-7 BIOS Recovery ............................................................................................. 7-26
Appendix A BIOS Error Beep Codes Appendix B Installing Windows Appendix C System Specifi cations
viii
Chapter 1: Introduction
Chapter 1
Introduction
1-1 Overview
The SuperServer 2026TT-HTRF/HIBXRF/HIBQRF/H6RF/H6IBXRF/H6IBQRF is a "2U Twin2" server comprised of the SC217HQ-R1400BP 2U chassis and four X8DTT-H(E)F+/X8DTT-HIBXF+/X8DTT-HIBQF+ serverboards. See the list below for the serverboard included in each server model.
In addition to the serverboard and chassis, various hardware components may have been included with the system, as listed below.
Eight passive CPU heatsinks (SNK-P0037P)
Four 8-cm cooling fans (FAN-0111L4)
Four air shrouds (MCP-310-82710-0B)
SAS/SATA Accessories: Twelve hard drive carriers (six per node) (MCP-220-00075-0B) One internal HDD backplane (BPN-SAS-217HQ) Four SAS daughter cards (2026TT-H6 models only, BPN-ADP-SAS2-H8iR) Four SATA daughter cards (non-H6 models only, BPN-827ADP-X8-H+)
Four PCI Express riser cards (RSC-R1U-E16R)
Rackmount rails kit (MCP-290-00053-0N)
One CD containing drivers and utilities
SuperServer 2026TT-HxRF User's Manual
Note: These servers do not require the use of SATA cables. 2026TT-HTRF: X8DTT-HF+ serverboard 2026TT-HIBXRF: X8DTT-HIBXF+ serverboard 2026TT-HIBQRF: X8DTT-HIBQF+ serverboard 2026TT-H6RF: X8DTT-HE+ serverboard 2026TT-H6IBXRF: X8DTT-HIBXF+ serverboard 2026TT-H6IBQRF: X8DTT-HIBQF+ serverboard
1-1
SUPERSERVER 2026TT-HxRF User's Manual
1-2 Serverboard Features
At the heart of the SuperServer 2026TT are two X8DTT series dual processor serverboards (see list on previous page), which are based on Intel's 5520 + ICH10R chipset. Below are the main features of the serverboards. Note that the features on each board are quadrupled for the server, which includes four nodes.
Processors
Each X8DTT series serverboard supports two Intel® 5600/5500 series processors in LGA1366 sockets. Please refer to our web site for a complete listing of supported processors (www.supermicro.com).
Memory
Each X8DTT has twelve DIMM sockets that can support up to 192 GB of regis­tered ECC DDR3-1333/1066/800 SDRAM or 48 GB of unbuffered ECC/Non-ECC 1333/1066/800 MHz memory for a maximum of 768 GB for the system. See Chapter 5 Section 6 for more details on installing memory into the system.
Onboard SAS (2026TT-H6 models only)
An LSI 2108 SAS controller is integrated into a daughter card to provide six SAS ports per node. The hot-swap SAS drives are connected to a backplane that pro­vides power, bus termination and confi guration settings.
Note: The operating system you use must have RAID support to enable the hot-swap capability and RAID function of the SAS drives. RAID 0, 1, 5 and 10 and 6 are supported. Refer to the following ftp site for setup guidelines <ftp://ftp.supermicro.com/driver/SAS/LSI/LSI_SAS_EmbMRAID_SWUG.pdf>.
Serial ATA
The South B ri dge (IC H10R) of the chi pset in clu des a Se ri al ATA controller for s ix Gb/s SATA drives. The hot-swappable SATA drives are connected to a backplane that provides power, bus termination and confi guration settings. R A ID 0, 1, 10 and 5 are suppor te d. Refer to t he supp or t ar ea of our we b site fo r pro ce dures o n set­ting up RAID on your system.
1-2
Chapter 1: Introduction
PCI Expansion Slots
Each X8DTT-HF+/X8DTT-HIBXF+/X8DTT-HIBQF+ has included riser cards that allow it to support two full-sized PCI Express 2.0 x8 expansion cards (in x16 slots), or four total for the server.
Ethernet Ports
An Intel® network controller is integrated into each of the serverboards to support two Gigabit LAN ports (100/1000Base-T/1000BaseTX, RJ45 output).
Onboard Controllers/Ports
Onboard I/O backpanel ports on each serverboard include one COM port, a VGA port, two USB ports, a dedicated IPMI LAN port and two Gigabit LAN (NIC) ports. An Infi niBand port is also included on the X8DTT-HIBXF+/HIB QF+ serverboards (the 2026TT-HIBXRF, 2026TT-HIBQRF, 2026TT-H6IBXRF and 2026TT-H6IBQRF only). Up to four US B 2.0 (Uni versal S eria l Bus) conne ctio ns (2 Rear USB Po rt s and 1 Type A Header w/2 USB connections supported) are on each of the servers. There are two sets of I/O ports included in the server (one set for each serverboard).
Graphics Controller
The X8DTT-HF+/X8DTT-HIBXF+/X8DTT-HIBQF+ features an integrated Matrox G200eW graphics chip, which includes 16 MB of DDR2 memory.
Other Features
Other onboard features that promote system health include voltage monitors, auto­switching voltage regulators, chassis and CPU overheat sensors, virus protection and BIOS rescue.
Infi niBand
The 2026TT-HIBXRF, 2026TT-HIBQRF, 2026TT-H6IBXRF and 2026TT-H6IBQRF include an Infi niBand port at DDR (dual data rate) and QDR (quad data rate) speeds, re spec tively. Infi niBand is a scalable serial communications link intended
for connecting processors with high-speed peripherals. (Infi niBand requires a QSFP connector.)
1-3
SUPERSERVER 2026TT-HxRF User's Manual
Figure 1-1. Intel 5520 Chipset:
System Block Diagram
Note1: This is a general block diagram. Please see Chapter 5 for details.
1-4
Chapter 1: Introduction
1-3 Server Chassis Features
The following is a general outline of the main features of the SC217HQ-R1400BP 2U chassis. Details on the chassis can be found in Chapter 6.
System Power
The SC217HQ-R1400BP includes a redundant (dual) 1400W power supply, which provides power to both serverboards (nodes). If either power supply failes, the other will allow the system to continue to run.
SATA Subsystem
The SC217HQ-R1400BP chassis was designed to support 24 SAS/SATA hard drives, wh ich are h ot-swa ppable un its. Th ere are si x hard dr ives per no de in the system.
Control Panel
The SC217HQ-R1400BP features four independant control panels. Each control panel has LEDs to indicate power on, network activity, power fail, fan fail, system overheat conditions and the UID LED for it's own specifi c node. Each control panel also includes a main power button and a UID button.
Rear I/O Panel
The SC217HQ-R1400BP is a 2U rackmount chassis. Its I/O panel provides slots for four low-profi le PCI Express x16 expansion cards, four COM ports, eight USB ports, four VGA ports and eight Gb Ethernet ports. See Chapter 6 for details.
Cooling System
The SC217HQ-R1400BP chassis has an innovative cooling design that features four 8-cm high-performance fans. A fan speed control setting in BIOS allows fan speed to be determined by system temperature. See Chapter 6 for details.
1-5
SUPERSERVER 2026TT-HxRF User's Manual
1-4 2U Twin: System Notes
As a 2U Twin confi guration, the 2026TT-HxRF is a unique server system. With four system boards incorporated into a single chassis acting as four separate nodes, there are several points you should keep in mind.
Nodes
Each of the four serverboards act as a separate node in the system. As independant nodes, each may be powered off and on without affecting the others. In addition, each node is a hot-swappable unit that may be removed from the rear of the chassis. The nodes are connected to the server backplane by means of an adapter card.
System Power
The server has an additional 1400W power supply module (two total) for power redundancy. If a power supply module fails the other backup module will keep the system running until it can be replaced.
SAS/SATA Backplane/Drives
As a system, the 2026TT-HxRF supports the use of 24 SAS or SATA drives. A single backplane works to apply system-based control for power and fan speed functions, yet at the same time logically connects a set of six drives to each serverboard. Consequently, RAID setup is limited to a six-drive scheme (RAID cannot be spread across all 24 drives). See the Drive Bay Installation/Removal section in Chapter 6 for the logical hard drive and node confi guration.
1-6
1-5 Contacting Supermicro
Headquarters
Address: Super Micro Computer, Inc.
980 Rock Ave. San Jose, CA 95131 U.S.A.
Tel: +1 (408) 503-8000
Fax: +1 (408) 503-8008
Email: marketing@supermicro.com (General Information)
support@supermicro.com (Technical Support)
Web Site: www.supermicro.com
Europe
Address: Super Micro Computer B.V.
Het Sterrenbeeld 28, 5215 ML 's-Hertogenbosch, The Netherlands
Tel: +31 (0) 73-6400390
Fax: +31 (0) 73-6416525
Email: sales@supermicro.nl (General Information)
support@supermicro.nl (Technical Support) rma@supermicro.nl (Customer Support)
Chapter 1: Introduction
Asia-Pacifi c
Address: Super Micro Computer, Inc.
4F, No. 232-1, Liancheng Rd. Chung-Ho 235, Taipei County Taiwan, R.O.C.
Tel: +886-(2) 8226-3990
Fax: +886-(2) 8226-3991
Web Site: www.supermicro.com.tw
Technical Support:
Email: support@supermicro.com.tw
Tel: 886-2-8228-1366, ext.132 or 139
1-7
SUPERSERVER 2026TT-HxRF User's Manual
Notes
1-8
Chapter 2: Server Installation
Chapter 2
Server Installation
2-1 Overview
This chapter provides a quick setup checklist to get the 2026TT-HxRF up and running. Following these steps in the order given should enable you to have the system operational within a minimum amount of time. This quick setup assumes that your system has come to you with the processors and memory preinstalled. If your system is not already fully integrated with a serverboard, processors, system memory etc., please turn to the chapter or section noted in each step for details on installing specifi c components.
2-2 Unpacking the System
You should inspect the box the system was shipped in and note if it was damaged in any way. If the server itself shows damage you should fi le a damage claim with the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold the server. It should be situated in a clean, dust-free area that is well ventilated. Avoid areas where heat, electrical noise and electromagnetic fi elds are generated. You will also need it placed near a grounded power outlet. Be sure to read the Rack and Server Precautions in the next section.
2-3 Preparing for Setup
The box the server was shipped in should include the rackmount hardware needed to install the system into the rack. Follow the steps in the order given to complete the installation process in a minimum amount of time. Please read this section in its entirety before you begin the installation procedure outlined in the sections that follow.
2-1
SUPERSERVER 2026TT-HxRF User's Manual
!
!
Choosing a Setup Location
Leave enough clearance in front of the rack to enable you to open the front door completely (~25 inches).
Leave approximately 30 inches of clearance in the back of the rack to allow for suffi cient airfl ow and ease in servicing.
This product is for installation only in a Restricted Access Location (dedicated equipment rooms, service closets and the like).
This product is not suitable for use with visual display work place devices accord- ing to §2 of the the German Ordinance for Work with Visual Display Units.
Warnings and Precautions!
Rack Precautions
Ensure that the leveling jacks on the bottom of the rack are fully extended to the fl oor with the full weight of the rack resting on them.
In single rack installation, stabilizers should be attached to the rack.
In multiple rack installations, the racks should be coupled together.
Always make sure the rack is stable before extending a component from it.
You should extend only one component at a time - extending two or more si- multaneously may cause the rack to become unstable.
Server Precautions
Review the electrical and general safety precautions in Chapter 4.
Determine the placement of each component in the rack before you install the rails.
Install the heaviest server components on the bottom of the rack fi rst, and then work up.
Use a regulating uninterruptible power supply (UPS) to protect the server from power surges, voltage spikes and to keep your system operating in case of a power failure.
2-2
Chapter 2: Server Installation
Allow the hot plug hard drives and power supply modules to cool before touch- ing them.
Always keep the rack's front door and all panels and components on the servers closed when not servicing to maintain proper cooling.
Make sure all power and data cables are properly connected and not blocking the chassis airfl ow. See Chapter 5 for details on cable connections.
Rack Mounting Considerations
Ambient Operating Temperature
If installed in a closed or multi-unit rack assembly, the ambient operating tempera­ture of the rack environment may be greater than the ambient temperature of the room. Therefore, consideration should be given to installing the equipment in an environment compatible with the manufacturer’s maximum rated ambient tempera­ture (Tmra).
Reduced Airfl ow
Equipment should be mounted into a rack so that the amount of airfl ow required for safe operation is not compromised.
Mechanical Loading
Equipment should be mounted into a rack so that a hazardous condition does not arise due to uneven mechanical loading.
Circuit Overloading
Consideration should be given to the connection of the equipment to the power supply circuitry and the effect that any possible overloading of circuits might have on overcurrent protection and power supply wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing this concern.
Reliable Ground
A reliable ground must be maintained at all times. To ensure this, the rack itself should be grounded. Particular attention should be given to power supply connec­tions other than the direct connections to the branch circuit (i.e. the use of power strips, etc.).
2-3
SUPERSERVER 2026TT-HxRF User's Manual
!
Removing the Protective Film
Before operating the server for the fi rst time, it is important to remove the protec- tive fi lm covering the top of the chassis, in order to allow for proper ventilation and cooling.
Removing the Protective Film
Peel off the protective fi lm covering the top cover and the top of the chassis1.
Check that all ventilation openings on the top cover and the top of the chassis 2. are clear and unobstructed.
Figure 2-1: Removing the Protective Film
1
1
Check Ventilation
Openings
2
1
Warning: Except for short periods of time, do NOT operate the server without the cover in place. The chassis cover must be in place to allow proper airfl ow and prevent overheating.
2-4
Chapter 2: Server Installation
2-4 Rack Mounting Instructions
This section provides information on installing the SC217 chassis into a rack unit with the quick-release rails provided. There are a variety of rack units on the market, which may mean the assembly procedure will differ slightly . You should also refer to the installation instructions that came with the rack unit you are using.
Note: This rail will t a rack between 26" and 33.5" deep.
Separating the Sections of the Rack Rails
The chassis package includes two rail assemblies in the rack mounting kit. Each assembly consists of two sections: an inner fi xed chassis rail that secures directly to the server chassis and an outer fi xed rack rail that secures directly to the rack itself.
Figure 2-2. Separating the Rack Rails
1
1
2
1
4
1
Rail Assembly
Extending the Rails
3
1
Quick-
Release Tab
Separating
the Inner Rail
Extension
Separating the Inner and Outer Rails
Locate the rail assembly in the chassis 1. packaging.
Extend the rail assembly by pulling it 2. outward.
Press the quick-release tab.3.
Separate the inner rail extension from 4. the outer rail assembly.
2-5
SUPERSERVER 2026TT-HxRF User's Manual
4
1
Figure 6-3: Installing the Inner Rails
Inner Rails
3
1
2
1
4
1
Figure 2-3: Installing the Inner Rails
Installing The Inner Rails on the Chassis
Installing the Inner Rails
Confi rm that the left and right inner rails have been correctly identifi ed.1.
Place the inner rail fi rmly against the side of the chassis, aligning the hooks 2. on the side of the chassis with the holes in the inner rail.
Slide the inner rail forward toward the front of the chassis until the rail clicks 3. into the locked position, which secures the inner rail to the chassis.
Secure the inner rail to the chassis with the screws provided. 4.
Repeat steps 1 through 4 above for the other inner rail.5.
2-6
1
1
2
1
3
1
Figure 6-5: Extending and Releasing the Outer Rails
Installing the Outer Rails on the Rack
Installing the Outer Rails
Press upward on the locking tab at the rear end of the middle rail. 1.
Chapter 2: Server Installation
4
1
Push the middle rail back into the outer rail.2.
Hang the hooks of the front of the outer rail onto the slots on the front of 3. the rack. If necessary, use screws to secure the outer rails to the rack, as illustrated above.
Pull out the rear of the outer rail, adjusting the length until it fi ts within the 4. posts of the rack.
Hang the hooks of the rear portion of the outer rail onto the slots on the rear 5. of the rack. If necessary, use screws to secure the rear of the outer rail to the rear of the rack.
Repeat steps 1-5 for the remaining outer rail.6.
2-7
SUPERSERVER 2026TT-HxRF User's Manual
Ball-Bearing
Shuttle
Figure 6-6: Installing into a Rack
Standard Chassis Installation
Installing the Chassis into a Rack
Confi rm that the inner rails are properly installed on the chassis. 1.
Confi rm that the outer rails are correctly installed on the rack. 2.
Pull the middle rail out from the front of the outer rail and make sure that the 3. ball-bearing shuttle is at the front locking position of the middle rail.
Align the chassis inner rails with the front of the middle rails.4.
Slide the inner rails on the chassis into the middle rails, keeping the pressure 5. even on both sides, until the locking tab of the inner rail clicks into the front of the middle rail, locking the chassis into the fully extended position.
Depress the locking tabs of both sides at the same time and push the chassis 6. all the way into the rear of the rack.
If necessary for security purposes, use screws to secure the chassis handles 7. to the front of the rack.
2-8
Chapter 2: Server Installation
2-5 Checking the Serverboard Setup
After you install the system in the rack, you will need to access the inside of the nodes to make sure the serverboard is properly installed.
Accessing the Inside of a Node (Figure 2-6)
Make sure the protective fi lm on the cover has been removed as described in 1. the previous section.
Before removing a node, unplug all the cables that connect to that node.2.
To remove a node, fi rst push the two latches (located near the handles) 3. inward.
Grasp the handles and pull the node out from the rear of the chassis.4.
To remove the system from the rack completely, depress the locking tabs in 5. the chassis rails (push the right-side tab down and the left-side tab up) to continue to pull the system out past the locked position.
Checking the Components and Setup
You may have one or two processors already installed in each of the four 1. serverboards. Each processor needs its own heatsink. See Chapter 5 for instructions on processor and heatsink installation.
Your server system may have come with system memory already installed. 2. Make sure all DIMMs are fully seated in their slots. For details on adding system memory, refer to Chapter 5.
You can install four add-on cards to the system (one for each node). See 3. Chapter 5 for details on installing PCI add-on cards.
Make sure all power and data cables are properly connected and not blocking 4. the chassis airfl ow. See Chapter 5 for details on cable connections.
2-9
SUPERSERVER 2026TT-HxRF User's Manual
2-6 Preparing to Power On
Next, you should check to make sure the hard drives and the backplane have been properly installed and all connections have been made.
Checking the Hard Drives
The hard disk drives are accessable from the front of the server and can be 1. installed and removed from the front of the chassis without removing the top chassis cover.
Depending upon your system's confi guration, your system may have one or 2. more drives already installed. If you need to install hard drives, please refer to Chapter 6.
Checking the Airfl ow
Airfl ow is provided by four 8-cm PWM fans and (for each serverboard) one 1. air shroud. The system component layout was carefully designed to direct suffi cient cooling airfl ow to the components that generate the most heat.
Note that all power and data cables have been routed in such a way that they 2. do not block the airfl ow generated by the fans.
Providing Power
Plug the power cords from the power supplies unit into a high-quality power 1. strip that offers protection from electrical noise and power surges.
It is recommended that you use an uninterruptible power supply (UPS).2.
Finally, depress the power on button on the front of the chassis.3.
2-10
Chapter 2: Server Installation
Figure 2-6. Removing a Node from the System
2
1
2-11
1
1
1
1
2
1
1
1
SUPERSERVER 2026TT-HxRF User's Manual
Notes
2-12
Chapter 3: System Interface
Chapter 3
System Interface
3-1 Overview
There are LEDs on the control panels and on the hard drive carriers to keep you constantly informed of the overall status of the system as well as the activity and health of specifi c components. There are also two buttons on each control panel. This chapter explains the meanings of all LED indicators and the appropriate re­sponse you may need to take. Note that the server has four control panels, one for each serverboard (node) installed in the system. This allows each node to be
controlled independently of the other.
3-2 Control Panel Buttons
There are two push-buttons located on each control panel: a power on/off button and a UID button.
Power
This is the main power button, which is used to apply or turn off the main system power only to the node it is connected to. Depressing this button removes the main power but keeps standby power supplied to the serverboard. Therefore, you must unplug the AC power cord from any external power source before servicing. This button has an LED built into it, which will illuminate when its node is powered on.
UID
Depressing the UID (unit identifi er) button illuminates an LED on both the front and rear of the chassis for easy system location in large stack confi gurations. The LED will remain on until the button is pushed a second time. Another UID button on the rear of the chassis serves the same function. This button has an LED built into it, which will illuminate when either the front or rear UID button is pushed.
3-1
SUPERSERVER 2026TT-HxRF User's Manual
3-3 Control Panel LEDs
In addition to the LEDs built into the power and UID buttons, each of the four control panels located on the front of the SC217 chassis has two LEDs that provide you with critical information related their own node. This section explains what each LED indicates when illuminated and any corrective action you may need to take.
Alert LED
This LED is illuminated when an alert condition occurs. A solid red light indicates an overheat condition in the system. A red light that fl ashes in one second inter- vals indicates a fan failure. A red light which fl ashes in four second intervals indi- cates a power failure. When notifi ed of an alert, check the routing of the cables and make sure all fans are present and operating normally. You should also check to make sure that the chassis covers and air shrouds are installed. Finally, verify that the heatsinks are installed properly. This LED will remain fl ashing or on as long as the temperature is too high or a fan does not function properly.
NIC
Indicates network activity on any of the LAN ports when fl ashing
3-2
Loading...
+ 76 hidden pages