Supermicro SUPERSERVER 6023L-8R User Manual

®
SUPERSERVER 6023L-8R
USER’S MANUAL
1.0a
SUPER
The information in this User’s Manual has been carefully reviewed and is believed to be accurate. The vendor assumes no responsibility for any inaccuracies that may be contained in this document, makes no commitment to update or to keep current the information in this manual, or to notify any person or organization of the updates.
Please Note: For the most up-to-date version of this manual, please see our web site at www.supermicro.com.
SUPERMICRO COMPUTER reserves the right to make changes to the product described in this manual at any time and without notice. This product, including software, if any, and documentation may not, in whole or in part, be copied, photocopied, reproduced, translated or reduced to any medium or machine without prior written consent.
IN NO EVENT WILL SUPERMICRO COMPUTER BE LIABLE FOR DIRECT, INDIRECT, SPECIAL, INCIDENTAL, SPECULATIVE OR CONSEQUENTIAL DAMAGES ARISING FROM THE USE OR INABILITY TO USE THIS PRODUCT OR DOCUMENTATION, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. IN PARTICULAR, THE VENDOR SHALL NOT HAVE LIABILITY FOR ANY HARDWARE, SOFTWARE, OR DATA STORED OR USED WITH THE PRODUCT, INCLUDING THE COSTS OF REPAIRING, REPLACING, INTEGRATING, INSTALLING OR RECOVERING SUCH HARDWARE, SOFTWARE, OR DATA.
Any disputes arising between manufacturer and customer shall be governed by the laws of Santa Clara County in the State of California, USA. The State of California, County of Santa Clara shall be the exclusive venue for the resolution of any such disputes. Supermicro's total liability for all claims will not exceed the price paid for the hardware product.
Unless you request and receive written permission from SUPER MICRO COMPUTER, you may not copy any part of this document.
Information in this document is subject to change without notice. Other products and companies referred to herein are trademarks or registered trademarks of their respective companies or mark holders.
Copyright © 2002 by SUPER MICRO COMPUTER INC. All rights reserved.
Printed in the United States of America
Preface
About This Manual
This manual is written for professional system integrators and PC techni­cians. It provides information for the installation and use of the Super­Server 6023L-8R. Installation and maintenance should be performed by experienced technicians only.
The SuperServer 6023L-8R is a high-end, dual processor 2U rackmount server based on the SC822R-400RC 2U rackmount server chassis and the X5DLR-8G2, a dual processor motherboard that supports single or dual Intel Xeon® processors with clock speeds up to 3.06 GHz and faster at a Front Side (system) Bus speeds of 533/400 MHz and up to 12 GB PC2100/1600 (DDR-266/200) SDRAM main memory.
Manual Organization
Chapter 1: Introduction
The first chapter provides a checklist of the main components included with the server system and describes the main features of the SUPER X5DLR­8G2 mainboard and the SC822R-400RC chassis, which make up the Super­Server 6023L-8R.
Chapter 2: Server Installation
This chapter describes the steps necessary to install the SuperServer 6023L-8R into a rack and check out the server configuration prior to pow­ering up the system. If your server was ordered without processor and memory components, this chapter will refer you to the appropriate sections of the manual for their installation.
Chapter 3: System Interface
Refer here for details on the system interface, which includes the functions and information provided by the control panel on the chassis as well as other LEDs located throughout the system.
iii
Preface
SUPERSERVER 6023L-8R Manual
iv
Chapter 4: System Safety
You should thoroughly familiarize yourself with this chapter for a general overview of safety precautions that should be followed when installing and servicing the SuperServer 6023L-8R.
Chapter 5: Advanced Motherboard Setup
Chapter 5 provides detailed information on the X5DLR-8G2 motherboard, including the locations and functions of connections, headers, jumpers and IRQs. Refer to this chapter when adding or removing processors or main memory and when reconfiguring the motherboard.
Chapter 6: Advanced Chassis Setup
Refer to Chapter 6 for detailed information on the SC822R-400RC 2U rackmount server chassis. You should follow the procedures given in this chapter when installing, removing or reconfiguring SCSI or peripheral drives and when replacing system power supply units and cooling fans.
Chapter 7: BIOS
The BIOS chapter includes an introduction to BIOS and provides detailed information on running the CMOS Setup Utility.
Appendix A: AMIBIOS Error Beep Codes
Appendix B: AMIBIOS POST Codes
Appendix C: System Specifications
v
Preface
Notes
SUPERSERVER 6023L-8R Manual
vi
Table of Contents
Preface
About This Manual ...................................................................................................... iii
Manual Organization ................................................................................................... iii
Chapter 1: Introduction to the SuperServer 6023L-8R
1-1 Overview ......................................................................................................... 1-1
1-2 Server Chassis Features.............................................................................. 1-2
1-3 Mainboard Features ....................................................................................... 1-4
1-4 Contacting Supermicro .................................................................................. 1-6
Chapter 2: Server Installation
2-1 Overview ......................................................................................................... 2-1
2-2 Unpacking the SuperServer 6023L-8R ....................................................... 2-1
2-3 Preparing for Setup ....................................................................................... 2-1
Choosing a Setup Location .................................................................... 2-2
Rack Precautions ..................................................................................... 2-2
Server Precautions.................................................................................. 2-2
2-4 Installing the SuperServer 6023L-8R into a Rack .................................... 2-3
Identifying the Sections of the Rack Rails .......................................... 2-3
Installing the Chassis Rails ..................................................................... 2-4
Installing the Rack Rails .......................................................................... 2-4
Installing the Server into the Rack ........................................................ 2-5
Installing the Server into a Telco Rack ................................................ 2-6
2- 5 Checking the Motherboard Setup ................................................................ 2-7
2-6 Checking the Drive Bay Setup ..................................................................... 2-9
Chapter 3: System Interface
3-1 Overview ......................................................................................................... 3-1
3- 2 Control Panel Buttons .................................................................................... 3-1
Reset.......................................................................................................... 3-1
Power ........................................................................................................ 3-1
3-3 Control Panel LEDs ........................................................................................ 3-2
Power Fail ................................................................................................. 3-2
Overheat ................................................................................................... 3-2
NIC2 ............................................................................................................ 3-2
NIC1 ............................................................................................................ 3-2
HDD ............................................................................................................ 3-3
Power ........................................................................................................ 3-3
3- 4 SCSI Drive Carrier LEDs ............................................................................... 3-3
3- 5 Motherboard LED ............................................................................................ 3-3
Chapter 4: System Safety
4-1 Electrical Safety Precautions ........................................................................ 4-1
4-2 General Safety Precautions .......................................................................... 4-2
4- 3 ESD Precautions.............................................................................................. 4-3
4-4 Operating Precautions .................................................................................... 4-4
Chapter 5: Advanced Motherboard Setup
5- 1 Handling the X5DLR-8G2 Motherboard ........................................................ 5-1
5-2 Xeon Processor and Heatsink Installation .................................................. 5-2
5-3 Connecting Cables .......................................................................................... 5-5
Connecting Data Cables .......................................................................... 5-5
Connecting Power Cables....................................................................... 5-5
Connecting the Control Panel ................................................................. 5-6
5- 4 I/O Ports ............................................................................................................ 5-7
5- 5 Installing Memory............................................................................................. 5-7
5- 6 Adding PCI Cards ............................................................................................ 5-9
5- 7 Motherboard Details ...................................................................................... 5-10
SUPER X5DLR-8G2 Layout .................................................................. 5-10
SUPER X5DLR-8G2 Quick Reference .................................................. 5-11
Chipset Diagram ...................................................................................... 5-12
5-8 Connector Definitions ................................................................................... 5-13
ATX Power Connection ........................................................................ 5-13
Processor Power Connector................................................................ 5-13
NMI Button ................................................................................................ 5-13
Power LED ............................................................................................... 5-13
HDD LED ................................................................................................... 5-14
NIC1 LED ................................................................................................. 5-14
NIC2 LED ................................................................................................. 5-14
Overheat LED .......................................................................................... 5-14
Power Fail LED ...................................................................................... 5-15
Reset......................................................................................................... 5-15
PWR_ON ................................................................................................... 5-15
Universal Serial Bus............................................................................... 5-15
Serial Ports .............................................................................................. 5-16
PS/2 Keyboard and Mouse ................................................................... 5-16
Fan Headers ............................................................................................5-16
vii
Table of Contents
SUPERSERVER 6023L-8R Manual
viii
GLAN1/GLAN2 Ports .............................................................................. 5-16
HD LED Indicator ..................................................................................... 5-17
Power LED ............................................................................................... 5-17
Third Power Supply Fail Header .......................................................... 5-17
Chassis Intrusion .................................................................................... 5-18
Extra Universal Serial Bus Headers ....................................................5-18
SMB ........................................................................................................... 5-18
5-9 Onboard Indicators ....................................................................................... 5-19
GLAN1/GLAN2 LEDs ............................................................................. 5-19
GLED1/GLED2 (Debug LEDs) ............................................................... 5-19
CR5 LED .................................................................................................. 5-20
5-10 DIP Switch Settings ...................................................................................... 5-20
DIP Switch 4: Processor Speed ......................................................... 5-20
5-11 Jumper Settings............................................................................................. 5-21
Explanation of Jumpers ......................................................................... 5-21
CMOS Clear.............................................................................................. 5-21
Speaker Enable/Disable ......................................................................... 5-22
Fan Detection Select .............................................................................. 5-22
Chassis/Overheat Fan Select ...............................................................5-22
Watch Dog Enable .................................................................................. 5-22
SCSI Enable/Disable................................................................................ 5-23
SCSI Termination Enable/Disable.......................................................... 5-23
PCI-X Bus Speed Setting....................................................................... 5-23
Front Side Bus Speed ........................................................................... 5-23
Spread Spectrum .................................................................................... 5-24
VGA Enable/Disable ............................................................................... 5-24
5-12 Parallel Port, Floppy/Hard Drive and SCSI Connections......................... 5-25
Parallel Port Connector ......................................................................... 5-25
Floppy Connector ................................................................................... 5-25
IDE Connectors ...................................................................................... 5-26
Ultra320 SCSI Connectors ..................................................................... 5-27
5-13 Installing Software Drivers.......................................................................... 5-28
Chapter 6: Advanced Chassis Setup
6-1 Static-Sensitive Devices ................................................................................ 6-1
6-2 Control Panel .................................................................................................... 6-2
6-3 System Fans .................................................................................................... 6-3
System Fan Failure .................................................................................. 6-3
Replacing System Cooling Fans ............................................................ 6-3
Table of Contents
ix
6- 4 Drive Bay Installation/Removal ...................................................................... 6-4
Accessing the Drive Bays ..................................................................... 6-4
SCSI Drive Installation............................................................................. 6-5
5 1/4" Drive Bay Installation .................................................................. 6-7
CD ROM and Floppy Drive Installation ................................................. 6-8
6-5 Power Supply .................................................................................................. 6-9
Power Supply Failure ............................................................................. 6-9
Removing/Replacing the Power Supply ............................................... 6-9
Chapter 7: AMIBIOS
7- 1 Introduction....................................................................................................... 7-1
7- 2 BIOS Features.................................................................................................. 7-2
7- 3 Running Setup.................................................................................................. 7-2
The Main BIOS Setup Menu .................................................................... 7-3
7-4 Advanced BIOS Setup .................................................................................... 7-4
7- 5 Chipset Setup................................................................................................. 7-15
7-6 PCI PnP Setup ................................................................................................ 7-16
7-7 Power Setup .................................................................................................. 7-18
7- 8 Boot Setup...................................................................................................... 7-20
7-9 Security Setup ...............................................................................................7-22
7-10 Exit Setup ....................................................................................................... 7-24
Appendices:
Appendix A: AMIBIOS Error Beep Codes ............................................................ A-1
Appendix B: AMIBIOS POST Codes .......................................................................B-1
Appendix C: System Specifications ...................................................................... C-1
Notes
SUPERSERVER 6023L-8R User's Manual
x
Chapter 1
Introduction to the SuperServer 6023L-8R
1-1 Overview
The Supermicro SuperServer 6023L-8R is a high-end dual processor, 2U rackmount server that features some of the most advanced technology currently available. The SuperServer 6023L-8R is comprised of two main subsystems: the SC822R-400RC 2U rackmount chassis and the X5DLR-8G2 dual Xeon processor mainboard. Please refer to our web site for informa­tion on operating systems that have been certified for use with the SuperServer 6023L-8R. (www.supermicro.com)
In addition to the mainboard and chassis, various hardware components may have been included with your SuperServer 6023L-8R, as listed below:
! Up to two (2) 604-pin Xeon 512k L2 cache processors*
! Two (2) CPU heatsinks* Fan (Fan-042-CFD)
! Up to 12 GB ECC registered DDR-266/200 (PC 2100/1600) SDRAM
main memory*
! One (1) 1.44" floppy drive
! One (1) slim CD-ROM drive
! One (1) 5.25" drive bay
! One three-slot active riser card (CSE-RR2U-LE)
! One (1) SCA SCSI backplane (SAF-TE compliant)
! Six (6) SCA 1-inch high SCSI drive carriers
! SCSI Accessories
Six (6) internal 68-pin Ultra320 SCSI cables for SCA SCSI backplane
One (1) set of SCSI driver diskettes
One (1) SCSI manual
Chapter 1: Introduction
1-1
SUPERSERVER 6023L-8R Manual
1-2
1-2 Server Chassis Features
The SuperServer 6023L-8R is a high-end, scalable 2U rackmount server platform designed with today's most state-of-the-art features. The follow­ing is a general outline of the main features of the SC822R-400RC chassis.
System Power
When configured as a SuperServer 6023L-8R, the SC822R-400RC chassis includes two 400W power supply modules for 400W of redundant power.
SCSI Subsystem
The SCSI subsystem supports dual channel SCA Ultra320 SCSI hard drives. (Any standard 1" drives are supported. SCA = Single Connection Attach­ment.) The SCSI drives are connected to a SAF-TE compliant SCA backplane that provides power, bus termination and configuration settings. The SCSI drives are also SAF-TE compliant hot-swap units.
Control Panel
The SC822R-400RC's control panel provides important system monitoring and control information. LEDs indicate power on, network activity, hard disk drive activity and system overheat conditions. The control panel also includes a main power button and a system reset button.
! Rackmount hardware (with screws):
Two (2) rack rail assemblies Six (6) brackets for mounting the rack rails to a rack/telco rack
! One (1) CD-ROM containing drivers and utilities:
Broadcom 5704 Gigabit Ethernet Dual GLAN Controller ATI Rage XL 8MB PCI graphics controller driver GLAN driver SCSI driver
! SuperServer 6023L-8R User's Manual
* Type and number depends upon the configuration ordered.
1-3
Chapter 1: Introduction
I/O Backplane
The SC822R-400RC is a 2U rackmount chassis. Its I/O backplane provides three motherboard low profile expansion slots for the 6023L-8R, one COM port (the other is internal), two USB ports, PS/2 mouse and keyboard ports and two Ethernet ports. (See Figure 1-1.)
Cooling System
The SC822R-400RC chassis has an innovative cooling design that includes four 8-cm redundant system cooling (intake) fans. The fans plug into chas­sis fan connectors that are located behind the HDD drive bays and continu­ously operate at full rpm. If they break down, the ambient air temperature inside the chassis will rise and activate an overheat LED.
Figure 1-1. I/O Backplane
Power Supplies (2)
Full-sized PCI Slots (3)
Mouse/Keyboard
Ports
USB Ports
COM1 Port
VGA Port
LAN Ports External SCSI Port
Printer Port
SUPERSERVER 6023L-8R Manual
1-4
1-3 Mainboard Features
At the heart of the SuperServer 6023L-8R lies the X5DLR-8G2, a dual Xeon processor motherboard designed to provide maximum performance. Below are the main features of the X5DLR-8G2.
Chipset
The X5DLR-8G2 is based on the ServerWorks GC-LE chipset, which is a high-performance core logic chipset designed for dual-processor servers.
The GC-LE chipset consists of three major components: a North Bridge, a South Bridge and an IO bridge.
The North Bridge interfaces directly to the processor bus and integrates the functions of the main memory subsystem and the IMB bus interface unit. The memory subsystem consists of an 6-DIMM configuration accessed over a 144-bit memory bus (most chipsets have a 72-bit memory bus), which provides a significant boost in performance.
The South Bridge provides various integrated functions, including the PCI to ISA bridge and support for UDMA100, security (passwords and system protection), Plug & Play, USBs, power management, interrupt controllers and the SMBus.
The 5704 (Broadcom Ethernet Dual Controller) is an integrated IO bridge that provides high-performance data flow between the IMB interface and the dual peer PCI-X bus interfaces.
Processors
The X5DLR-8G2 supports single or dual Intel Xeon 512K L2 cache proces­sors of up to 3.06 GHz and faster with a 533/400 MHz FSB. Please refer to the support section of our web site for a complete listing of supported processors (http://www.supermicro.com/TechSupport.htm).
Memory
The X5DLR-8G2 has 6 184-pin DIMM slots that can support up to 12 GB of registered ECC PC2100/1600 DDR-266/200 SDRAM. Module sizes of 128 MB, 256 MB, 512 MB, 1 GB and 2 GB may be used to populate the DIMM slots. (PC2100 is also supported, but only at a speed of 200 MHz.)
1-5
Chapter 1: Introduction
Onboard SCSI
Onboard SCSI is provided with an Adaptec AIC-7902W SCSI controller chip, which supports dual channel, Ultra 320 SCSI at a burst throughput rate of 320 MB/sec. The X5DLR-8G2 has six 1-inch hot swap Ultra 320 SCSI SCA drive bays.
PCI Expansion Slots
The X5DLR-8G2 has one 64-bit 133 MHz PCI-X slot. An active riser card (having its own I/O Controller Bridge) is included with the X5DLR-8G2 that, along with the server backplane, accommodates up to three standard size PCI cards. Jumpers are included on the motherboard to change the speeds of the PCI-X slot if required (see Chapter 5).
ATI Graphics Controller
The X5DLR-8G2 includes an integrated ATI video controller based on the Rage XL 8 MB PCI graphics chip. Rage XL fully supports sideband address­ing and AGP texturing. This onboard graphics package can provide a band­width of up to 512 MB/sec over a 32-bit graphics memory bus.
Onboard Controllers/Ports
One floppy drive controller and two ATA/100 onboard IDE controllers, which support up to four hard drives or ATAPI devices. Backpanel I/O ports include one COM port, four USB ports, PS/2 mouse and keyboard ports, a video (monitor) port, a parallel port and two Ethernet ports (GLAN1 & GLAN2).
Other Features
Other onboard features are included to promote system health. These in­clude various voltage monitors, two CPU temperature sensors, fan speed sensors, a chassis intrusion header, auto-switching voltage regulators, chassis and CPU overheat sensors, virus protection and BIOS rescue.
SUPERSERVER 6023L-8R Manual
1-6
1-4 Contacting Supermicro
Headquarters
Address: SuperMicro Computer, Inc.
980 Rock Ave.
San Jose, CA 95131 U.S.A. Tel: +1 (408) 503-8000 Fax: +1 (408) 503-8008 E-mail: marketing@supermicro.com (General Information)
support@supermicro.com (Technical Support) Web site: www.supermicro.com
European Office
Address: SuperMicro Computer B.V.
Het Sterrenbeeld 28, 5215 ML,
's-Hertogenbosch, The Netherlands Tel: +31 (0) 73-6400390 Fax: +31 (0) 73-6416525 E-mail: sales@supermicro.nl (General Information)
support@supermicro.nl (Technical Support)
rma@supermicro.nl (Customer Support)
Asia-Pacific
Address: SuperMicro Taiwan
3F, #753 Chung-Cheng Road
Chung-Ho City, Taipei Hsien, Taiwan, R.O.C. Tel: +886-(2) 8228-1366 Fax: +886-(2) 8221-2790 www : www.supermicro.com.tw Technical Support: Email: support@supermicro.com.tw Tel : 886-2-8228-1366, ext.132 or 139
Chapter 2: Server Installation
2-1
Chapter 2
Server Installation
2-1 Overview
This chapter provides a quick setup checklist to get your SuperServer 6023L-8R up and running. Following these steps in the order given should enable you to have the system operational within a minimum amount of time. This quick setup assumes that your SuperServer 6023L-8R system has come to you with the processors and memory preinstalled. If your system is not already fully integrated with a motherboard, processors, system memory etc., please turn to the chapter or section noted in each step for details on installing specific components.
2-2 Unpacking the SuperServer 6023L-8R
You should inspect the box the SuperServer 6023L-8R was shipped in and note if it was damaged in any way. If the server itself shows damage you should file a damage claim with the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold the SuperServer 6023L-8R. It should be situated in a clean, dust-free area that is well ventilated. Avoid areas where heat, electrical noise and electromagnetic fields are generated. You will also need it placed near a grounded power outlet. Read the Rack and Server Precautions in the next section.
2-3 Preparing for Setup
The box the SuperServer 6023L-8R was shipped in should include two sets of rail assemblies, two rail mounting brackets and the mounting screws you will need to install the system into the rack. Follow the steps in the order given to complete the installation process in a minimum amount of time. Please read this section in its entirety before you begin the installation procedure outlined in the sections that follow.
2-2
SUPERSERVER 6023L-8R Manual
Choosing a Setup Location:
- Leave enough clearance in front of the rack to enable you to open
the front door completely (~25 inches).
- Leave approximately 30 inches of clearance in the back of the rack
to allow for sufficient airflow and ease in servicing.
Rack Precautions:
- Ensure that the leveling jacks on the bottom of the rack are fully
extended to the floor with the full weight of the rack resting on them.
- In single rack installation, stabilizers should be attached to the rack.
- In multiple rack installations, the racks should be coupled together.
- Always make sure the rack is stable before extending a component
from the rack.
- You should extend only one component at a time - extending two or
more simultaneously may cause the rack to become unstable.
Server Precautions:
- Review the electrical and general safety precautions in Chapter 4.
- Determine the placement of each component in the rack before you
install the rails.
- Install the heaviest server components on the bottom of the rack
first, and then work up.
- Use a regulating uninterruptible power supply (UPS) to protect the server from power surges, voltage spikes and to keep your system operating in case of a power failure.
- Allow the hot plug SCSI drives and power supply units to cool before
touching them.
- Always keep the rack's front door and all panels and components on
the servers closed when not servicing to maintain proper cooling.
!
!
Warnings and Precautions!
Chapter 2: Server Installation
2-3
2-4 Installing the SuperServer 6023L-8R into a Rack
This section provides information on installing the SuperServer 6023L-8R into a rack unit. If the 6023L-8R has already been mounted into a rack, you can skip ahead to Sections 2-5 and 2-6. There are a variety of rack units on the market, which may mean the assembly procedure will differ slightly. The following is a guideline for installing the 6023L-8R into a rack with the rack rails provided. You should also refer to the installation instructions that came with the rack unit you are using.
Identifying the Sections of the Rack Rails:
You should have received two rack rail assemblies with the SuperServer 6023L-8R. Each of these assemblies consist of three sections: an inner fixed chassis rail that secures to the 6023L-8R (A) and an outer fixed rack rail that secures directly to the rack itself (B). A sliding rail guide sand­wiched between the two should remain attached to the fixed rack rail. (See Figure 2-1.) The A and B rails must be detached from each other to install.
To remove the fixed chassis rail (A), pull it out as far as possible - you should hear a "click" sound as a locking tab emerges from inside the rail assembly and locks the inner rail. Then depress the locking tab to pull the inner rail completely out. Do this for both the left and right side rack rail assemblies.
Figure 2-1. Identifying the Sections of the Rack Rails
A
B
2-4
SUPERSERVER 6023L-8R Manual
Installing the Chassis Rails:
Position the fixed chassis rail sections you just removed along the side of the 6023L-8R making sure the screw holes line up. Note that these two rails are left/right specific. Screw the rail securely to the side of the chas­sis (see Figure 2-2). Repeat this procedure for the other rail on the other side of the chassis. You will also need to attach the rail brackets when installng into a telco rack.
Locking Tabs: As you have seen, both chassis rails have a locking tab, which serves two functions. The first is to lock the server into place when installed and pushed fully into the rack, which is its normal position. Secondly, these tabs also lock the server in place when fully extended from the rack. This prevents the server from coming completely out of the rack when you pull it out for servicing.
Figure 2-2. Installing Chassis Rails
Installing the Rack Rails:
Determine where you want to place the SuperServer 6023L-8R in the rack. (See Rack and Server Precautions in Section 2-3.) Position the fixed rack rail/sliding rail guide assemblies at the desired location in the rack, keeping the sliding rail guide facing the inside of the rack. Screw the assembly securely to the rack using the brackets provided. Attach the other assem-
Chapter 2: Server Installation
2-5
Figure 2-3. Installing the Server into a Rack
Installing the Server into the Rack:
You should now have rails attached to both the chassis and the rack unit. The next step is to install the server into the rack. Do this by lining up the rear of the chassis rails with the front of the rack rails. Slide the chassis rails into the rack rails, keeping the pressure even on both sides (you may have to depress the locking tabs when inserting). See Figure 2-3.
When the server has been pushed completely into the rack, you should hear the locking tabs "click". Finish by inserting and tightening the thumbscrews that hold the front of the server to the rack.
bly to the other side of the rack, making both are at the exact same height and with the rail guides facing inward.
2-6
SUPERSERVER 6023L-8R Manual
Figure 2-4. Installing the Server into a Telco Rack
Installing the Server into a Telco Rack:
If you are installing the SuperServer 6023L-8R into a Telco type rack, follow the directions given on the previous pages for rack installation. The only difference in the installation procedure will be the positioning of the rack brackets to the rack. They should be spaced apart just enough to accomodate the width of the telco rack.
Chapter 2: Server Installation
2-7
2-5 Checking the Motherboard Setup
After you install the 6023L-8R in the rack, you will need to open the unit to make sure the motherboard is properly installed and all the connections have been made.
1. Accessing the inside of the 6023L-8R (see Figure 2-5):
First, release the retention screws that secure the unit to the rack. Grasp the two handles on either side and pull the unit straight out until it locks (you will hear a "click"). Next, depress the two buttons on the top of the chassis to release the top cover. There is a large rectangular recess in the middle front of the top cover to help you push the cover away from you until it stops. You can then lift the top cover from the chassis to gain full access to the inside of the server.
2. Check the CPUs (processors):
You should have one or two processors already installed into the system board. Each processor should have its own heatsink attached. See Chapter 5 for instructions on processor installation.
3. Verify the proper CPU speed setting:
If the CPU speed is not automatically detected you will need to set the correct speed with DIP Switch 4 on the motherboard. (Most Intel proces­sors have a fixed Core/Bus ratio that overwrites the setting of DIP Switch
4; you should not need to make any changes with DIP Switch 4.)
4. Check the system memory:
Your 6023L-8R server system may have come with system memory al­ready installed. Make sure all DIMMs are fully seated in their slots. For details on adding system memory, refer to Chapter 5.
5. Installing PCI cards:
If desired, you can install up to three standard size PCI cards to the system. See the appropriate section in Chapter 5 for details on installing PCI add-on cards.
2-8
SUPERSERVER 6023L-8R Manual
Figure 2-5. Accessing the Inside of the SuperServer 6023L-8R
(with one SCSI Drive removed)
Chapter 2: Server Installation
2-9
6. Check all cable connections and airflow:
Make sure all power and data cables are properly connected and not blocking the chassis airflow. See Chapter 5 for details on cable connec­tions.
2-6 Checking the Drive Bay Setup
Next, you should check to make sure the peripheral drives and the SCSI drives and SCA backplane have been properly installed and all connec­tions have been made.
1. Accessing the drive bays:
All drives can be accessed from the front of the server. For servicing the CD-ROM and floppy drives, you will need to remove the top chassis cover. The SCSI disk drives can be installed and removed from the front of the chassis without removing the top chassis cover. The 5.25" drive bay cover can be removed by pressing the tab on the corner of the drive bay and then pushing the bay outward from the inside.
2. CD-ROM and floppy disk drives:
A slim CD-ROM and a floppy drive should be preinstalled in your server. Refer to Chapter 6 if you need to reinstall a CD-ROM and/or floppy disk drive to the system.
3. 5.25" drive bay:
The 5.25" drive bay comes without a preinstalled drive. Refer to Chapter 6 if you need to install a component (such as an IDE hard drive) into the
5.25" drive bay.
4. Check the SCSI disk drives:
Depending upon your system's configuration, your system may have one or more drives already installed. If you need to remove or install SCSI drives, please refer to Chapter 6.
2-10
SUPERSERVER 6023L-8R Manual
5. Check the airflow:
Airflow is provided by four 8-cm redundant cooling fans. The system component layout was carefully designed to promote sufficient airflow through the 2U rackmount space. Also note that all power and data cables have been routed in such a way that they do not block the airflow generated by the fans.
6. Supplying power to the system:
The last thing you must do is to provide input power to the system. Plug the power cord from both power supply modules into a high-quality power strip that offers protection from electrical noise and power surges. It is recommended that you use an uninterruptible power supply (UPS). Finally, depress the power button on the front control panel to supply power to and boot up the system.
Chapter 3: System Interface
3-1
Chapter 3
System Interface
3-1 Overview
There are several LEDs on the control panel as well as others on the SCSI drive carriers and the motherboard to keep you constantly informed of the overall status of the system as well as the activity and health of specific components. There are also two buttons on the chassis control panel.
3-2 Control Panel Buttons
There are two push-button buttons located on the front of the chassis. These are (in order from left to right) a reset button and a power on/off button.
! RESET: Use the reset button to reboot the system.
! POWER: This is the main power button, which is used to apply or turn
off the main system power. Turning off system power with this button removes the main power but keeps standby power supplied to the system.
SUPERSERVER 6023L-8R User's Manual
3-2
3-3 Control Panel LEDs
The control panel located on the front of the SC822R-400RC chassis has five LEDs. These LEDs provide you with critical information related to dif­ferent parts of the system. This section explains what each LED indicates when illuminated and any corrective action you may need to take.
! Power Fail: Indicates a power supply unit has failed and will need to be replaced. Refer to Chapter 6 for details on replacing power supply units. This LED should be off when the system is operating normally.
! Overheat: Indicates an overheat condition in the chassis. This may be caused by cables obstructing the airflow in the system or the ambient room temperature being too warm. You should also check to make sure that the chassis cover is installed and that all fans are present and operat­ing normally. Verify that the heatsinks are installed properly (see the pro­cessor installation section in Chapter 5). Finally, check the air seals for damage. The air seals are located under the blower fans and beneath the frame cross section that separates the drive bay area from the motherboard area of the chassis.
! NIC2: Indicates network activity on GLAN2 when flashing.
! NIC1: Indicates network activity on GLAN1 when flashing.
NIC2
NIC1
Chapter 3: System Interface
3-3
! HDD: Indicates IDE channel activity. On the SuperServer 6023L-8R, this LED indicates CD-ROM drive activity when flashing.
! Power: Indicates power is being supplied to the system's power
supply units. This LED should normally be illuminated when the system is operating.
3-4 SCSI Drive Carrier LEDs
A SCSI drive carrier has two LEDs.
! Green: When illuminated, the green LED on the front of the SCSI drive
carrier indicates drive activity. A connection to the SCSI SCA backplane enables this LED to blink on and off when that particular drive is being accessed.
! Red: A SAF-TE compliant backplane is needed to activate the red LED, which indicates a drive failure. (A SAF-TE compliant SCSI backplane is standard on the 6023L-8R.) If one of the SCSI drives fail, you should be notified by your system management software. Please refer to Chapter 6 for instructions on replacing failed SCSI drives.
3-5 Motherboard LED
There is only one LED on the motherboard, which is designated CR5 and is located in the corner of the X5DLR-8G2 near the JA1 SCSI connector. The CR5 LED can be one of three different colors. When green, it indicates that power is present on the motherboard. Yellow indicates standby power is present on the motherboard. Red indicates an incorrect or missing CPU.
SUPERSERVER 6023L-8R User's Manual
3-4
Notes
Loading...
+ 80 hidden pages