Supermicro SUPERSERVER 6013P-8 User Manual

®
SUPERSERVER 6013P-8
USER’S MANUAL
1.1b
SUPER
The information in this User’s Manual has been carefully reviewed and is believed to be accurate. The vendor assumes no responsibility for any inaccuracies that may be contained in this document, makes no commitment to update or to keep current the information in this manual, or to notify any person or organization of the updates.
Please Note: For the most up-to-date version of this manual, please see our web site at www.supermicro.com.
SUPERMICRO COMPUTER reserves the right to make changes to the product described in this manual at any time and without notice. This product, including software, if any, and documentation may not, in whole or in part, be copied, photocopied, reproduced, translated or reduced to any medium or machine without prior written consent.
IN NO EVENT WILL SUPERMICRO COMPUTER BE LIABLE FOR DIRECT, INDIRECT, SPECIAL, INCIDENTAL, SPECULATIVE OR CONSEQUENTIAL DAMAGES ARISING FROM THE USE OR INABILITY TO USE THIS PRODUCT OR DOCUMENTATION, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. IN PARTICULAR, THE VENDOR SHALL NOT HAVE LIABILITY FOR ANY HARDWARE, SOFTWARE, OR DATA STORED OR USED WITH THE PRODUCT, INCLUDING THE COSTS OF REPAIRING, REPLACING, INTEGRATING, INSTALLING OR RECOVERING SUCH HARDWARE, SOFTWARE, OR DATA.
Any disputes arising between manufacturer and customer shall be governed by the laws of Santa Clara County in the State of California, USA. The State of California, County of Santa Clara shall be the exclusive venue for the resolution of any such disputes. Supermicro's total liability for all claims will not exceed the price paid for the hardware product.
Unless you request and receive written permission from SUPER MICRO COMPUTER, you may not copy any part of this document.
Information in this document is subject to change without notice. Other products and companies referred to herein are trademarks or registered trademarks of their respective companies or mark holders.
Copyright © 2003 by SUPER MICRO COMPUTER INC. All rights reserved.
Printed in the United States of America
Preface
About This Manual
This manual is written for professional system integrators and PC technicians. It provides information for the installation and use of the SuperServer 6013P-8. Installation and maintainance should be performed by experienced technicians only.
The SuperServer 6013P-8 is a high-end, dual Xeon processor 1U rackmount server based on the SC812S-400 1U rackmount server chassis and the X5DPR­8G2+ serverboard, which supports single or dual Xeon processors of up to 3.20 GHz at a Front Side (system) Bus speed of 533/400 MHz and up to 12 GB of DDR-266/200 (PC2100/1600) low-profile SDRAM memory.
Manual Organization
Chapter 1: Introduction
The first chapter provides a checklist of the main components included with the server system and describes the main features of the SUPER X5DPR-8G2+ serverboard and the SC812S-400 chassis, which make up the SuperServer 6013P-8.
Chapter 2: Server Installation
This chapter describes the steps necessary to install the SuperServer 6013P-8 into a rack and check out the server configuration prior to powering up the system. If your server was ordered without processor and memory components, this chapter will refer you to the appropriate sections of the manual for their installation.
Chapter 3: System Interface
Refer here for details on the system interface, which includes the functions and information provided by the control panel on the chassis as well as other LEDs located throughout the system.
iii
Preface
SUPERSERVER 6013P-8 Manual
iv
Chapter 4: System Safety
You should thoroughly familiarize yourself with this chapter for a general overview of safety precautions that should be followed when installing and servicing the SuperServer 6013P-8.
Chapter 5: Advanced Serverboard Setup
Chapter 5 provides detailed information on the X5DPR-8G2+ serverboard, including the locations and functions of connectors, headers and jumpers. Refer to this chapter when adding or removing processors or main memory and when reconfiguring the serverboard.
Chapter 6: Advanced Chassis Setup
Refer to Chapter 6 for detailed information on the 1U SC812S-400 rackmount server chassis. You should follow the procedures given in this chapter when installing, removing or reconfiguring SCSI or peripheral drives and when replacing the system power supply unit and cooling fans.
Chapter 7: BIOS
The BIOS chapter includes an introduction to BIOS and provides detailed information on running the CMOS Setup Utility.
Appendix A: BIOS POST Messages
Appendix B: BIOS POST Codes
Appendix C: System Specifications
v
Preface
Notes
SUPERSERVER 6013P-8 Manual
vi
Table of Contents
Preface
About This Manual ....................................................................................................... ii i
Manual Organization .................................................................................................... ii i
Chapter 1: Introduction to the SuperServer 6013P-8
1-1 Overview ............................................................................................................ 1- 1
1- 2 Server Chassis Features ................................................................................ 1-2
1-3 Serverboard Features ...................................................................................... 1- 4
1- 4 Contacting Supermicro ................................................................................... 1-6
Chapter 2: Server Installation
2-1 Overview ............................................................................................................ 2- 1
2- 2 Unpacking the SuperServer 6013P-8............................................................. 2- 1
2- 3 Preparing for Setup ......................................................................................... 2-1
Choosing a Setup Location...................................................................... 2-2
Rack Precautions...................................................................................... 2- 2
Server Precautions.................................................................................... 2-2
2-4 Installing the SuperServer 6013P-8 into a Rack .......................................... 2-3
Identifying the Sections of the Rack Rails ............................................ 2-3
Installing the Chassis Rails.......................................................................2-4
Installing the Rack Rails ............................................................................2-4
Installing the Server into the Rack ...........................................................2-5
Installing the Server into a Telco Rack ....................................................2-6
2- 5 Checking the Serverboard Setup ................................................................... 2-7
2-6 Checking the Drive Bay Setup....................................................................... 2-9
Chapter 3: System Interface
3-1 Overview ............................................................................................................ 3- 1
3-2 Control Panel Buttons..................................................................................... 3 -1
Reset.......................................................................................................... 3-1
NMI ............................................................................................................. 3-1
Power ......................................................................................................... 3 -2
3- 3 Control Panel LEDs......................................................................................... 3-2
Overheat ..................................................................................................... 3 -2
NIC2 ............................................................................................................ 3- 2
NIC1 ............................................................................................................ 3- 3
HDD ............................................................................................................ 3-3
Power ......................................................................................................... 3 -3
3- 4 SCSI Drive Carrier LEDs................................................................................. 3-3
3-5 Serverboard LEDs ............................................................................................ 3-4
Chapter 4: System Safety
4-1 Electrical Safety Precautions...........................................................................4-1
4- 2 General Safety Precautions .............................................................................4-2
4-3 ESD Precautions ...............................................................................................4-3
4- 4 Operating Precautions ......................................................................................4-4
Chapter 5: Advanced Serverboard Setup
5-1 Handling the X5DPR-8G2+ Serverboard ..........................................................5-1
5-2 PGA Processor and Heatsink Installation ......................................................5-2
5- 3 Connecting Cables ............................................................................................5-5
Connecting Data Cables ............................................................................5-5
Connecting Power Cables ..........................................................................5-5
Connecting the Control Panel ...................................................................5-6
5-4 I/O Ports .............................................................................................................5-7
5- 5 Installing Memory ..............................................................................................5-7
5- 6 Adding PCI Cards ..............................................................................................5-9
5-7 Serverboard Details .........................................................................................5-10
X5DPR-8G2+ Layout............................................................................... 5-10
X5DPR-8G2+ Quick Reference.............................................................. 5-11
5- 8 Connector Definitions ......................................................................................5-12
ATX Power Connection ........................................................................... 5-12
PWR_SEC Connection ........................................................................... 5-12
NMI Button............................................................................................... 5-12
Power LED............................................................................................... 5-12
HDD LED ................................................................................................. 5-12
NIC1 LED ................................................................................................. 5-13
NIC2 LED ................................................................................................. 5-13
Overheat LED .......................................................................................... 5-13
Power Fail LED ....................................................................................... 5-13
Reset Button ........................................................................................... 5-13
Power Button........................................................................................... 5-14
Universal Serial Bus ............................................................................... 5-14
Extra USB Headers ................................................................................ 5-14
Serial Ports ............................................................................................. 5-15
ATX PS/2 Keyboard & Mouse Ports..................................................... 5-15
Fan Headers ............................................................................................ 5-15
vii
Table of Contents
SUPERSERVER 6013P-8 Manual
viii
GLAN 1/2 (Ethernet Ports) .................................................................... 5-15
Power LED/Speaker/NMI........................................................................ 5-16
Third Power Supply Fail Header............................................................ 5-16
Chassis Intrusion .................................................................................... 5-16
Wake-On-LAN.......................................................................................... 5-17
Wake-On-Ring ......................................................................................... 5-17
Keylock .................................................................................................... 5-17
5- 9 Jumper Settings............................................................................................. 5-18
Explanation of Jumpers.......................................................................... 5-18
CMOS Clear ............................................................................................ 5-18
GLAN Enable/Disable............................................................................. 5-19
VGA Enable/Disable ............................................................................... 5-19
Front Side Bus Speed............................................................................ 5-19
SCSI Enable/Disable .............................................................................. 5-19
SCSI Termination Enable/Disable ......................................................... 5-20
Watch Dog Enable/Disable.................................................................... 5-20
5-10 Onboard Indicators ........................................................................................ 5-21
GLAN1/GLAN2 LEDs .............................................................................. 5-21
5-11 Floppy/Hard Drive and SCSI Connections .................................................. 5-22
Floppy Connector .................................................................................... 5-22
IDE Connectors ....................................................................................... 5-23
Ultra320 SCSI Connectors ..................................................................... 5-23
5-12 Installing Software Drivers ............................................................................ 5-24
5-13 Supero Doctor III............................................................................................ 5-27
Chapter 6: Advanced Chassis Setup
6- 1 Static-Sensitive Devices ................................................................................. 6-1
6- 2 Control Panel ................................................................................................... 6-2
6-3 System Fans .................................................................................................... 6-3
System Fan Failure .................................................................................. 6-3
Replacing System Cooling Fans............................................................. 6-3
6-4 Drive Bay Installation/Removal ....................................................................... 6-4
Accessing the Drive Bays ....................................................................... 6-4
SCSI Drive Installation.............................................................................. 6-5
CD-ROM and Floppy Drive Installation ................................................... 6-7
6- 5 Power Supply................................................................................................... 6-8
Power Supply Failure ............................................................................... 6 -8
Removing/Replacing the Power Supply .................................................. 6-8
Table of Contents
ix
Chapter 7: BIOS
7-1 Introduction....................................................................................................... 7- 1
7- 2 Running Setup ................................................................................................. 7-2
7-3 Main BIOS Setup ............................................................................................ 7-2
The Main BIOS Setup Menu.................................................................... 7- 3
7- 4 Advanced Setup............................................................................................... 7 -6
7-5 Security .......................................................................................................... 7-13
7-6 Power .............................................................................................................. 7-15
7-7 Boot................................................................................................................. 7-17
7-8 PIR .................................................................................................................. 7-19
7-9 Exit.................................................................................................................. 7-21
Appendices:
Ap pe n d i x A: B I O S P O S T Me s s a g es ....................................................................... A - 1
Appendix B: BIOS Post Codes ............................................................................... B - 1
Appendix C: System Specifications ....................................................................... C-1
SUPERSERVER 6013P-8 User's Manual
x
Notes
Chapter 1
Introduction to the SuperServer 6013P-8
1-1 Overview
The Supermicro SuperServer 6013P-8 is a high-end dual processor, 1U rackmount server that features some of the most advanced technology currently available. The SuperServer 6013P-8 is comprised of two main subsystems: the SC812S-400 1U rackmount chassis and the X5DPR-8G2+ dual Xeon processor serverboard. Please refer to our web site for information on operating systems that have been certified for use with the SuperServer 6013P-8. (www.supermicro.com)
In addition to the mainboard and chassis, various hardware components may have been included with your SuperServer 6013P-8, as listed below:
! Two (2) 1U CPU heatsinks (SNK-P0003) and two sets of heatsink
retention clips (for 604-and 603-pin processors, two in each set)
! One (1) 3.5" slim floppy drive
! One (1) slim CD-ROM drive
! Two (2) riser cards (CSE-RR1U-X and CSE-RR1U-XLP)
! One (1) SCA SAF-TE compliant SCSI backplane
! Three (3) SCA 1-inch high SCSI drive carriers
! SCSI Accessories
One (1) internal 68-pin Ultra320/160 SCSI cable
One (1) SCSI manual
! Rackmount hardware (with screws):
Two (2) rack rail assemblies
Six (6) brackets for mounting the rack rails to a rack/telco rack
Chapter 1: Introduction
1-1
SUPERSERVER 6013P-8 Manual
1-2
! One (1) CD-ROM containing drivers and utilities:
! SuperServer 6013P-8 User's Manual
1-2 Mainboard Features
At the heart of the SuperServer 6013P-8 lies the X5DPR-8G2+, a dual Intel Xeon processor serverboard designed to provide maximum performance. Below are the main features of the X5DPR-8G2+.
Chipset
The X5DPR-8G2+ is based on Intel's E7501 chipset, which is a high-perfor­mance chipset designed for dual-processor servers (see Figure 1-1).
The E7501 chipset consists of four major components: the Memory Control­ler Hub (MCH), the I/O Controller Hub 3 (ICH3), the PCI-X 64-bit Hub 2.0 (P64H2) and the 82808AA Host Channel Adapter (VxB).
The MCH has four hub interfaces, one to communicate with the ICH3 and three for high-speed I/O communications. The MCH employs a 144-bit wide memory bus for a DDR-266 (PC2100) memory interface, which provides a total bandwidth of up to 4.2 GB/s. The ICH3 interface is a 266 MB/sec point-to-point connection using an 8-bit wide, 66 MHz base clock at a 4x data transfer rate. The P64H2 interface is a 1 GB/s point-to-point connec­tion using a 16-bit wide, 66 MHz base clock at a 8x data transfer rate.
The ICH3 I/O Controller Hub provides various integrated functions, including a two-channel UDMA100 bus master IDE controller, USB host controllers, a System Management Bus controller and an AC'97 compliant interface.
The P64H2 PCI-X Hub provides a 16-bit connection to the MCH for high­performance IO capability and the 64-bit PCI-X interface.
1-3
Chapter 1: Introduction
Processors
The X5DPR-8G2+ supports single or dual Intel 604/603-pin Xeon processors of up to 3.20 GHz at a 533/400 MHz FSB. Please refer to the support section of our web site for a complete listing of supported processors (http:// www.supermicro.com/TechSupport.htm).
Memory
The X5DPR-8G2+ has 6 184-pin, DIMM slots that can support up to 12 GB of low-profile, registered ECC DDR-266/200 (PC2100/1600) SDRAM. Module sizes of 128 MB, 256 MB, 512 MB, 1 GB and 2 GB may be used to populate the DIMM slots. (This serverboard has has been designed to support 2GB DIMM modules for each memory slot, but it has only been validated with 1GB memory modules. Memory modules of different sizes and speeds should not be mixed.)
Onboard SCSI
Onboard SCSI is provided with an Adaptec AIC-7902 SCSI controller chip, which supports dual channel, Ultra320 SCSI at a burst throughput rate of 320 MB/sec. The X5DPR-8G2+ provides two SCSI ports. A QLogic GEM318 controller is used for the SAF-TE compliant SCSI backpanel.
PCI Expansion Slots
The X5DPR-8G2+ has one 64-bit, 133 MHz PCI-X slot and one slim 64-bit, 66 MHz PCI slot. A "butterfly" riser card is included with the server. This riser card fits into the 133 MHz PCI-X slot and was designed specially for the SC812S­400 chassis to support the use of one standard PCI card and one low profile (half­height, half-length) PCI card. Several jumpers on the motherboard are used to change the speeds of these slots if needed (see Chapter 5).
ATI Graphics Controller
The X5DPR-8G2+ features an integrated ATI video controller based on the Rage XL graphics chip. Rage XL fully supports sideband addressing and AGP texturing. This onboard graphics package can provide a bandwidth of up to 512 MB/sec over a 32-bit graphics memory bus.
SUPERSERVER 6013P-8 Manual
1-4
Onboard Controllers/Ports
The X5DPR-8G2+ includes one floppy drive controller and two onboard IDE con­trollers, which support up to four hard drives or ATAPI devices. Backpanel I/O ports include one COM port, two USB ports, PS/2 mouse and keyboard ports, a video (monitor) port and an external SCSI port. An Intel 82546 Ethernet controller is included to support two Gb LAN ports.
Other Features
Other onboard features are included to promote system health. These in­clude various voltage monitors, two CPU temperature sensors, four fan speed sensors, a chassis intrusion header, auto-switching voltage regula­tors, chassis and CPU overheat sensors, virus protection and BIOS rescue.
PCI-X Slot 6, SXB
MCH
533/400 MH z Sy stem B us
266 MHz Memory Bus
ATA 100
Ports
P64H2
Processor 1 Processor 0
2-Channel DDR SDRAM
PCI-X Slot 5, Gb LAN
ICH3 -S
USB 1.1
Ports
SMBus
Super IO
ATI
Graphics
P64H2
PCI-X Slots 1-3 PCI-X Slot 4, SCSI
Figure 1-1. E7501 Chipset Block Diagram
1-5
Chapter 1: Introduction
1-3 Server Chassis Features
The SC812S-400 is Supermicro's second-generation 1U chassis and features three hard drive bays, two front side USB ports and a revolutionary cooling design that can keep today's most powerful processors running well below their tempera­ture thresholds. The following is a general outline of the main features of the SC812S-400 chassis.
System Power
When configured as a SuperServer 6013P-8, the SC812S-400 chassis includes a 400W cold-swap power supply.
SCSI Subsystem
The SCSI subsystem supports three 80-pin SCA Ultra320 SCSI hard drives. (Any standard 1" drives are supported. SCA = Single Connection Attachment.) The SCSI drives are connected to an SCA backplane that provides power, bus termi­nation and configuration settings. The SCSI drives are also hot-swap units.
Control Panel
The SC812S-400 control panel provides important system monitoring and control information. LEDs indicate power on, network activity, hard disk drive ac­tivity and system overheat conditions. Also present are a main power button, a system reset button and an NMI (non-maskable interrupt) button.
I/O Backplane
The SC812S-400 is a 1U rackmount chassis. Its I/O backplane provides one full­height full-length and one half-height half-length PCI slots, one COM port (the other is internal), one VGA port, two USB ports, PS/2 mouse and keyboard ports and two Ethernet (LAN) ports and an external SCSI port. (See Figure 1-2.)
SUPERSERVER 6013P-8 Manual
1-6
Cooling System
The SC812S-400 chassis' revolutionary cooling design has been optimized to provide sufficient cooling for dual Xeon configurations. The SC812S-400 includes two heavy duty 10-cm blower fans located in the middle of the chassis. These fans operate continuously at full rpm. If they break down, the ambient air tem­perature inside the chassis will rise and activate an overheat LED.
Figure 1-2. I/O Backplane
Ethernet PortsUSB Ports
Mouse PortKeyboard Port
COM1 Port
Low Profile PCI Slot Standard PCI Slot
VGA Port Ext. SCSI Port
1-7
Chapter 1: Introduction
1-4 Contacting Supermicro
Headquarters
Address: SuperMicro Computer, Inc.
980 Rock Ave.
San Jose, CA 95131 U.S.A. Tel: +1 (408) 503-8000 Fax: +1 (408) 503-8008 Email: marketing@supermicro.com (General Information)
support@supermicro.com (Technical Support) Web Site: www.supermicro.com
Europe
Address: SuperMicro Computer B.V.
Het Sterrenbeeld 28, 5215 ML
's-Hertogenbosch, The Netherlands Tel: +31 (0) 73-6400390 Fax: +31 (0) 73-6416525 Email: sales@supermicro.nl (General Information)
support@supermicro.nl (Technical Support)
rma@supermicro.nl (Customer Support)
Asia-Pacific
Address: SuperMicro, Taiwan
D5, 4F, No. 16 Chien-Ba Road
Chung-Ho 235, Taipei Hsien, Taiwan, R.O.C. Tel: +886-(2) 8226-3990 Fax: +886-(2) 8226-3991 Web Site: www.supermicro.com.tw Technical Support: Email: support@supermicro.com.tw Tel: 886-2-8228-1366, ext.132 or 139
SUPERSERVER 6013P-8 Manual
1-8
Notes
Chapter 2: Server Installation
2-1
Chapter 2
Server Installation
2-1 Overview
This chapter provides a quick setup checklist to get your SuperServer 6013P-8 up and running. Following these steps in the order given should enable you to have the system operational within a minimum amount of time. This quick setup assumes that your SuperServer 6013P-8 system has come to you with the processors and memory preinstalled. If your system is not already fully integrated with a serverboard, processors, system memory etc., please turn to the chapter or section noted in each step for details on installing specific components.
2-2 Unpacking the SuperServer 6013P-8
You should inspect the box the SuperServer 6013P-8 was shipped in and note if it was damaged in any way. If the server itself shows damage you should file a damage claim with the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold the SuperServer 6013P-8. It should be situated in a clean, dust-free area that is well venti­lated. Avoid areas where heat, electrical noise and electromagnetic fields are generated. You will also need it placed near a grounded power outlet. Read the Rack and Server Precautions in the next section.
2-3 Preparing for Setup
The box the SuperServer 6013P-8 was shipped in should include two sets of rail assemblies, two rail mounting brackets and the mounting screws you will need to install the system into the rack. Follow the steps in the order given to complete the installation process in a minimum amount of time. Please read this section in its entirety before you begin the installation procedure outlined in the sections that follow.
2-2
SUPERSERVER 6013P-8 Manual
Choosing a Setup Location:
- Leave enough clearance in front of the rack to enable you to open
the front door completely (~25 inches).
- Leave approximately 30 inches of clearance in the back of the rack
to allow for sufficient airflow and ease in servicing.
Rack Precautions:
- Ensure that the leveling jacks on the bottom of the rack are fully
extended to the floor with the full weight of the rack resting on them.
- In single rack installation, stabilizers should be attached to the rack.
- In multiple rack installations, the racks should be coupled together.
- Always make sure the rack is stable before extending a component
from the rack.
- You should extend only one component at a time - extending two or
more simultaneously may cause the rack to become unstable.
Server Precautions:
- Review the electrical and general safety precautions in Chapter 4.
- Determine the placement of each component in the rack before you
install the rails.
- Install the heaviest server components on the bottom of the rack
first, and then work up.
- Use a regulating uninterruptible power supply (UPS) to protect the server from power surges, voltage spikes and to keep your system operating in case of a power failure.
- Allow the hot plug SCSI drives and power supply units to cool before
touching them.
- Always keep the rack's front door and all panels and components on
the servers closed when not servicing to maintain proper cooling.
!
!
Warnings and Precautions!
Chapter 2: Server Installation
2-3
Rack Mounting Considerations
Ambient Operating Temperature
If installed in a closed or multi-unit rack assembly, the ambient operating temperature of the rack environment may be greater than the ambient temperature of the room. Therefore, consideration should be given to installing the equipment in an environment compatible with the manufacturer’s maximum rated ambient temperature (Tmra).
Reduced Airflow
Equipment should be mounted into a rack so that the amount of airflow required for safe operation is not compromised.
Mechanical Loading
Equipment should be mounted into a rack so that a hazardous condition does not arise due to uneven mechanical loading.
Circuit Overloading
Consideration should be given to the connection of the equipment to the power supply circuitry and the effect that any possible overloading of circuits might have on overcurrent protection and power supply wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing this concern.
Reliable Ground
A reliable ground must be maintained at all times. To ensure this, the rack itself should be grounded. Particular attention should be given to power supply con­nections other than the direct connections to the branch circuit (i.e. the use of power strips, etc.).
2-4
SUPERSERVER 6013P-8 Manual
2-4 Installing the SuperServer 6013P-8 into a Rack
This section provides information on installing the SuperServer 6013P-8 into a rack unit. If the 6013P-8 has already been mounted into a rack, you can skip ahead to Sections 2-5 and 2-6. There are a variety of rack units on the market, which may mean the assembly procedure will differ slightly. The following is a guideline for installing the 6013P-8 into a rack with the rack rails provided. You should also refer to the installation instructions that came with the rack unit you are using.
Identifying the Sections of the Rack Rails:
You should have received two rack rail assemblies with the SuperServer 6013P-8. Each of these assemblies consist of three sections: an inner fixed chassis rail that secures to the 6013P-8 (A) and an outer fixed rack rail that secures directly to the rack itself (B). A sliding rail guide sand­wiched between the two should remain attached to the fixed rack rail. (See Figure 2-1.) The A and B rails must be detached from each other to install.
To remove the fixed chassis rail (A), pull it out as far as possible - you should hear a "click" sound as a locking tab emerges from inside the rail assembly and locks the inner rail. Then depress the locking tab to pull the inner rail completely out. Do this for both the left and right side rack rail assemblies.
Figure 2-1. Identifying the Sections of the Rack Rails
A
B
Locking Tab
Mounting Holes
Chapter 2: Server Installation
2-5
Installing the Chassis Rails:
Position the fixed chassis rail sections you just removed along the side of the 6013P-8 making sure the screw holes line up. Note that these two rails are left/right specific. Screw the rail securely to the side of the chassis (see Figure 2-2). Repeat this procedure for the other rail on the other side of the chassis. You will also need to attach the rail brackets when installng into a telco rack.
Locking Tabs: As you have seen, both chassis rails have a locking tab, which serves two functions. The first is to lock the server into place when installed and pushed fully into the rack, which is its normal position. Secondly, these tabs also lock the server in place when fully extended from the rack. This prevents the server from coming completely out of the rack when you pull it out for servicing.
Figure 2-2. Installing Chassis Rails
Installing the Rack Rails:
Determine where you want to place the SuperServer 6013P-8 in the rack. (See Rack and Server Precautions in Section 2-3.) Position the fixed rack rail/sliding rail guide assemblies at the desired location in the rack, keeping the sliding rail guide facing the inside of the rack. Screw the assembly securely to the rack using the brackets provided. Attach the other assem-
2-6
SUPERSERVER 6013P-8 Manual
Figure 2-3. Installing the Server into a Rack
Installing the Server into the Rack:
You should now have rails attached to both the chassis and the rack unit. The next step is to install the server into the rack. Do this by lining up the rear of the chassis rails with the front of the rack rails. Slide the chassis rails into the rack rails, keeping the pressure even on both sides (you may have to depress the locking tabs when inserting). See Figure 2-3.
When the server has been pushed completely into the rack, you should hear the locking tabs "click". Finish by inserting and tightening the thumbscrews that hold the front of the server to the rack.
bly to the other side of the rack, making sure both are at the exact same height and with the rail guides facing inward.
Chapter 2: Server Installation
2-7
Figure 2-4. Installing the Server into a Telco Rack
Installing the Server into a Telco Rack:
If you are installing the SuperServer 6013P-8 into a Telco type rack, follow the directions given on the previous pages for rack installation. The only difference in the installation procedure will be the positioning of the rack brackets to the rack. They should be spaced apart just enough to accommodate the width of the telco rack.
2-8
SUPERSERVER 6013P-8 Manual
2-5 Checking the Serverboard Setup
After you install the 6013P-8 in the rack, you will need to open the unit to make sure the serverboard is properly installed and all the connections have been made.
1. Accessing the inside of the 6013P-8 (see Figure 2-5):
First, release the retention screws that secure the unit to the rack. Grasp the two handles on either side and pull the unit straight out until it locks (you will hear a "click"). Next, depress the two buttons on the top of the chassis to release the top cover. There is a large rectangular recess in the middle front of the top cover to help you push the cover away from you until it stops. You can then lift the top cover from the chassis to gain full access to the inside of the server.
2. Check the CPUs (processors):
You should have one or two processors already installed into the serverboard. Each processor needs its own heatsink. See Chapter 5 for instructions on processor and heatsink installation.
3. Verify the proper CPU clock ratio setting:
If the CPU speed is not automatically detected you will need to set the correct speed with the BIOS Setup utility. See the CPU Frequency Ratio settings in BIOS (Chapter 7) for setting the proper CPU speed. (Most processor speeds are automatically detected so this step should be un­necessary.)
4. Check the system memory:
Your 6013P-8 server system may have come with system memory al­ready installed. Make sure all DIMMs are fully seated in their slots. For details on adding system memory, refer to Chapter 5.
5. Installing add-on cards:
If desired, you can install add-on cards to the system. See Chapter 5 for details on installing PCI add-on cards.
Chapter 2: Server Installation
2-9
Figure 2-5. Accessing the Inside of the SuperServer 6013P-8
6. Check all cable connections and airflow:
Make sure all power and data cables are properly connected and not blocking the chassis airflow. See Chapter 5 for details on cable connec­tions. Also, check the air seals for damage. The air seals are located under the blower fan and beneath the frame cross section that sepa­rates the drive bay area from the serverboard area of the chassis.
2-10
SUPERSERVER 6013P-8 Manual
2-6 Checking the Drive Bay Setup
Next, you should check to make sure the peripheral drives and the SCSI drives and SCA backplane have been properly installed and all connections have been made.
1. Accessing the drive bays:
All drives are accessable from the front of the server. For servicing the CD-ROM and floppy drives, you will need to remove the top chassis cover. The SCSI disk drives can be installed and removed from the front of the chassis without removing the top chassis cover.
2. CD-ROM and floppy disk drives:
A slim CD-ROM and a floppy drive should be preinstalled in your server. Refer to Chapter 6 if you need to reinstall a CD-ROM and/or floppy disk drive to the system.
3. Check the SCSI disk drives:
Depending upon your system's configuration, your system may have one or more drives already installed. If you need to install SCSI drives, please refer to Chapter 6.
4. Check the airflow:
Airflow is provided by two heavy duty 10-cm blower fans. The system component layout was carefully designed to direct sufficient cooling air­flow to the components that generate the most heat. Note that all power and data cables have been routed in such a way that they do not block the airflow generated by the fans.
5. Supplying power to the system:
The last thing you must do is to provide input power to the system. Plug the power cord from the power supply unit into a high-quality power strip that offers protection from electrical noise and power surges. It is recommended that you use an uninterruptible power supply (UPS).
Chapter 3: System Interface
3-1
Chapter 3
System Interface
3-1 Overview
There are several LEDs on the control panel as well as others on the SCSI drive carriers to keep you constantly informed of the overall status of the system as well as the activity and health of specific components. There are also two buttons on the chassis control panel and an on/off switch on the power supply.
3-2 Control Panel Buttons
There are three push-button buttons located on the front of the chassis. These are (in order from left to right) a reset button, an MNI (non-maskable interface) button and a power on/off button.
! RESET: Use the reset button to reboot the system.
! NMI: NMI stands for "non-maskable interrupt". Pressing this button
issues a non-maskable interrupt to force the server into a halt state. This is used for diagnostic purposes, and allows you to perform a memory down­load to determine the cause of a problem.
SUPERSERVER 6013P-8 User's Manual
3-2
! POWER: This is the main power button, which is used to apply or turn off the main system power. Turning off system power with this button removes the main power but keeps standby power supplied to the system.
3-3 Control Panel LEDs
The control panel located on the front of the SC812S-400 chassis has five LEDs. These LEDs provide you with critical information related to different parts of the system. This section explains what each LED indicates when illuminated and any corrective action you may need to take.
! Overheat: Indicates an overheat condition in the chassis. This may be caused by cables obstructing the airflow in the system or the ambient room temperature being too warm. You should also check to make sure that the chassis cover is installed and that all fans are present and operating normally. Verify that the heatsinks are installed properly (see Chapter 5). Finally, check the air seals for damage. The air seals are vertical pieces located to the left and right of the fans and against the front side of the chassis frame cross section that separates the drive bay area from the serverboard area of the chassis. There is also a small air seal positioned between the two fans.
! NIC2: Indicates network activity on LAN2 when flashing.
NIC2
Loading...
+ 80 hidden pages