Sun Oracle SPARC T5120, SPARC T5220 Installation Manual

Sun SPARC Enterprise T5120 and
T5220 Servers
Installation Guide
Part No. 820-2178-14 October 2010, Revision A
Copyright ©2009, 2010 Oracle and/or itsaffiliates. Allrights reserved. FUJITSU LIMITEDprovided technical input and review on portions of thismaterial. This softwareand relateddocumentation areprovided undera license agreement containing restrictions on use and disclosure andare protectedby
intellectual propertylaws. Except as expressly permitted in your license agreement orallowed by law, you may not use, copy, reproduce, translate, broadcast, modify, license,transmit, distribute, exhibit, perform, publish, or displayany part, in any form, or byany means. Reverse engineering, disassembly, or decompilationof this software, unless required by law for interoperability,is prohibited.
The informationcontained herein is subject to change withoutnotice and is not warranted to beerror-free. If you findany errors,please reportthem to us in writing.
If thisis software or related software documentation that is delivered to theU.S. Government or anyone licensing it onbehalf of the U.S. Government, the following noticeis applicable:
U.S. GOVERNMENTRIGHTS Programs, software, databases, and related documentation and technical data deliveredto U.S. Government customers are "commercial computersoftware" or"commercial technicaldata" pursuant to the applicable Federal AcquisitionRegulation and agency-specific supplemental regulations.As such, the use, duplication, disclosure, modification, and adaptationshall be subject to therestrictions andlicense terms set forth inthe applicable Government contract, and,to the extent applicable by the termsof the Government contract, the additional rightsset forth in FAR
52.227-19, CommercialComputer SoftwareLicense (December 2007). Oracle America, Inc., 500Oracle Parkway, Redwood City,CA 94065 FUJITSU LIMITED, 1-1,Kamikodanaka 4-chome, Nakahara-ku, Kawasaki-shi, Kanagawa-ken211-8588, Japan.
This software orhardware is developed forgeneral usein a variety of information management applications. It isnot developedor intended for use in any inherently dangerous applications, including applications which may create a risk ofpersonal injury. If you use thissoftware orhardware in dangerous applications, thenyou shall be responsible to take allappropriate fail-safe,backup, redundancy, andother measures to ensure its safe use. Oracle Corporation andits affiliates and FUJITSU LIMITED disclaim anyliability for any damages causedby use of this software or hardware in dangerous applications.
Oracle andJava are registered trademarksof Oracle and/or its affiliates. Other namesmay be trademarks of their respective owners. Fujitsu andthe Fujitsu logo are registered trademarks of Fujitsu Limited. AMD, Opteron,the AMD logo, and the AMD Opteron logo aretrademarks or registered trademarks of Advanced Micro Devices. Intel and IntelXeon are
trademarks orregistered trademarksof Intel Corporation. All SPARC trademarks are used under licenseand aretrademarks or registered trademarks of SPARC International, Inc. UNIX is aregistered trademark licensed through X/Open Company, Ltd.
This software or hardware and documentation may provide access to or information on content, products, and services from third parties. Oracle Corporation and its affiliates and FUJITSU LIMITED are not responsible for and expressly disclaim all warranties of any kind with respect to third-party content, products, and services. Oracle Corporation and its affiliates and FUJITSU LIMITED will not be responsible for any loss, costs, or damages incurred due to your access to or use of third-party content, products, or services.
Copyright ©2009, 2010, Oracle et/ou sesaffiliés. Tous droitsréservés. Entrée etrevue tecnical fournies par FUJITSU LIMITED surdes parties de ce matériel. Ce logicielet la documentation qui l’accompagnesont protégéspar les lois sur la propriété intellectuelle. Ils sontconcédés sous licence et soumisà des
restrictions d’utilisationet de divulgation. Sauf disposition de votre contrat de licence ou dela loi, vous ne pouvez pas copier, reproduire, traduire, diffuser, modifier, breveter,transmettre, distribuer, exposer, exécuter, publier ou afficher le logiciel, même partiellement,sous quelque forme et par quelque procédéque ce soit. Par ailleurs, il estinterdit deprocéder àtoute ingénierie inverse du logiciel,de le désassembler ou de le décompiler, excepté à des finsd’interopérabilité avec des logiciels tiers ou telque prescritpar la loi.
Les informationsfournies dans ce document sontsusceptibles de modification sans préavis. Par ailleurs,Oracle Corporation et FUJITSU LIMITED ne garantit pasqu’elles soient exemptes d’erreurs et vous invite,le cas échéant, à lui en faire part par écrit.
Si celogiciel, ou la documentation quil’accompagne, est concédé sous licence au Gouvernementdes Etats-Unis, ou à toute entité quidélivre la licencede ce logicielou l’utilise pour le comptedu Gouvernement des Etats-Unis, la notice suivantes’applique :
U.S. GOVERNMENTRIGHTS. Programs, software, databases, and related documentation and technical data deliveredto U.S. Government customers are "commercial computer software"or "commercialtechnical data" pursuant to theapplicable Federal Acquisition Regulation and agency-specific supplemental regulations. As such, theuse, duplication, disclosure, modification, and adaptation shall be subjectto the restrictions and license terms set forth inthe applicable Government contract, and,to the extent applicable by the termsof the Government contract, the additional rightsset forth in FAR
52.227-19, CommercialComputer SoftwareLicense (December 2007). Oracle America, Inc., 500 OracleParkway, Redwood City, CA 94065 et FUJITSU LIMITED, 1-1,Kamikodanaka 4-chome, Nakahara-ku, Kawasaki-shi, Kanagawa-ken211-8588, Japan.
Ce logicielou matériel a été développépour un usage général dans le cadre d’applications de gestion des informations.Ce logiciel ou matériel n’est pas conçu nin’est destiné à être utilisé dans desapplications à risque, notamment dans des applicationspouvant causer des dommages corporels. Si vous utilisez celogiciel ou matériel dans lecadre d’applicationsdangereuses, ilest de votre responsabilité de prendretoutes les mesures de secours, de sauvegarde, deredondance etautres mesures nécessaires à son utilisation dans des conditionsoptimales de sécurité. Oracle Corporation et sesaffiliés déclinent touteresponsabilité quant aux dommages causés par l’utilisationde ce logiciel ou matériel pour cetype d’applications.
Oracle etJava sont des marques déposées d’Oracle Corporationet/ou de ses affiliés.Tout autre nom mentionné peut correspondre à des marques appartenant àd’autres propriétaires qu’Oracle.
Fujitsu etle logo Fujitsu sont desmarques déposéesde Fujitsu Limited. AMD, Opteron,le logo AMD et le logo AMDOpteron sontdes marquesou des marques déposées d’Advanced Micro Devices. Intel etIntel Xeon sont des
marques oudes marquesdéposées d’Intel Corporation. Toutes les marques SPARCsont utilisées sous licence et sont desmarques oudes marques déposées deSPARCInternational, Inc. UNIX est une marque déposéeconcédée sous licence par X/Open Company, Ltd.
Ce logicielou matériel et la documentationqui l’accompagne peuvent fournir des informations oudes liens donnant accès à des contenus,des produits et des servicesémanant de tiers. Oracle Corporationet ses affiliés et FUJITSU LIMITED déclinent toute responsabilité ou garantie expresse quant aux contenus, produitsou services émanant de tiers. En aucuncas, Oracle Corporation et ses affiliés et FUJITSU LIMITEDne sauraient être tenus pour responsables despertes subies, des coûts occasionnés ou desdommages causés par l’accès à des contenus,produits ouservices tiers, ou à leurutilisation.
Contents
Using This Documentation ix
Preparing for Installation 1
Server Overview 1
Server Handling Precautions 3
Input Power Information and Precautions 3
Tools and Equipment Needed 4
Optional Component Installation 5
ESD Precautions 6
Installation Overview 6
Preparing for Installation 8
Installing the Hardware 8
Configuring the Service Processor 9
Configuring the Host Software 10
Cabling Notes for Both Servers 10
Port, Connector, and LED Locations for Both Servers 12
Slide Rail Assembly Notes for Both Servers 15
Cable Management Notes for Both Servers 19
Installing the SPARC Enterprise T5120 and T5220 Servers 21
Installing the Servers in a Rack 21
Install the Slide Rail Assemblies 22
Insert and Lock the Server in the Rack 29
v
Installing the Cable Management Arm for Both Servers 30
Install the Cable Management Arm 31
Verify the Operation of the Slide Rails and the CMA 35
Connecting the Server Cables for Both Servers 37
Connect the Service Processor Serial Management Port 38
Connect the Service Processor Network Management Port 40
Connect the Ethernet Network Cables 41
Connect the AC Power Cable to the Server 41
Managing Cables With the CMA 42
Secure the Server Cables in the CMA 42
Dismounting the Servers 43
Powering On the System 45
Powering On the System for the First Time 45
ILOM System Console 46
ILOM Service Processor 46
Power On the System for the First Time 47
Enabling the Service Processor Network Management Port 51
Logging Into the Service Processor 53
Log Into the Service Processor Using the Serial Management Port 53
Configure the Service Processor Network Management Port 55
Log Into the Service Processor Using the Network Management Port
58
Using the Service Processor for Common Operations 58
Power On the System 59
Connect to the System Console 60
Perform a Normal System Initialization 61
Devices in the OpenBoot Device Tree 62
Boot the Solaris Operating System 64
vi SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Avoid Booting the Solaris Operating System at Startup 65
Reset the System 65
Power Cycle the System 66
Verifying System Functionality 67
Updating the Firmware 69
flashupdate command 69
Update the Firmware 70
Selecting a Boot Device 73
Selecting a Boot Device 73
To Select a Boot Device 74
Installing the Servers With the Express Rail Rackmounting Kit 75
Slide Rail Assembly Notes for the Express Rail Rackmounting Kit 76
Installing the Servers in a Rack With Express Rails 78
Install the Slide Rail Assemblies 78
Insert and Lock the Server in the Rack 83
Installing the Cable Management Arm 85
Dismounting the Server 86
Assembling and Installing DC Power Cables for the Sun SPARC Enterprise
T5120 Server 87
Requirements for Servers With DC Input Power 87
DC Supply and Ground Conductor Requirements 88
Overcurrent Protection Requirements 89
Assembling and Installing the DC Input Power Cables 89
Assemble the DC Input Power Cables 90
Install the Strain Relief Housings 95
Connecting the DC Input Power Cords to the Server 98
Contents vii
Assembling and Installing DC Power Cables for the Sun SPARC Enterprise
T5220 Server 101
Requirements for Servers With DC Input Power 101
Input Power Restrictions 102
DC Supply and Ground Conductor Requirements 102
Overcurrent Protection Requirements 103
Assembling and Installing the DC Input Power Cables 103
Assemble the DC Input Power Cables 104
Connect the DC Input Power Cords 107
Index 109
viii SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Using This Documentation
This document provides instructions, backgroud information, and reference material to help you install Oracle’s Sun SPARC Enterprise T5120 and T5220 servers.
“UNIX Commands” on page ix
“Shell Prompts” on page x
“Related Documentation” on page x
“Documentation, Support, and Training” on page xi
“Documentation Feedback” on page xi
UNIX Commands
This document might not contain information on basic UNIX commands and procedures such as shutting down the system, booting the system, and configuring devices. Refer to the following for this information:
Software documentation that you received with your system
Oracle Solaris Operating System documentation, which is at
(http://docs.sun.com)
ix
Shell Prompts
Shell Prompt
C shell machine-name%
C shell superuser machine-name#
Bourne shell and Korn shell $
Bourne shell and Korn shell superuser #
Related Documentation
The documents listed as online are available at:
(http://docs.sun.com/app/docs/prod/sparc.t5120)
(http://docs.sun.com/app/docs/prod/sparc.t5220)
Part
Application Title
Product Notes SPARC Enterprise T5120 and T5220 Servers Product Notes 820-2176 PDF Online
Getting Started SPARC Enterprise T5120 Server Getting Started Guide 820-4417 Printed Ships with
Getting Started SPARC Enterprise T5120 Server Getting Started Guide (DC) 820-5838 Printed Ships with
Getting Started SPARC Enterprise T5220 Server Getting Started Guide 820-4418 Printed Ships with
Getting Started SPARC Enterprise T5220 Server Getting Started Guide (DC) 820-5839 Printed Ships with
Planning SPARC Enterprise T5120 and T5220 Servers Site Planning Guide 820-2177 PDF
Installation SPARC Enterprise T5120 and T5220 Servers Installation Guide 820-2178 PDF
Administration SPARC Enterprise T5120 and T5220 Servers Administration
Guide
Number Format Location
system
system
system
system
Online
HTML
Online
HTML
820-2179 PDF
HTML
Online
x SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Application Title
Part Number Format Location
Service SPARC Enterprise T5120 and T5220 Servers Service Manual 820-2181 PDF
HTML
Safety SPARC Enterprise T5120 and T5220 Servers Safety and
Compliance Manual
Remote Management
Remote Management
Oracle Integrated Lights Out Manager (ILOM) 3.0 Supplement for Sun SPARC Enterprise T5120 and T5220 Servers
Sun Integrated Lights Out Manager (ILOM) 2.0 Supplement for Sun SPARC Enterprise T5120 and T5220 Servers
820-2182 PDF Online
820-6683 PDF
HTML
820-2180 PDF
HTML
Documentation, Support, and Training
These web sites provide additional resources:
Documentation (http://docs.sun.com)
Support (http://www.sun.com/support)
Training (http://www.sun.com/training)
Online
Online
Online
Documentation Feedback
Submit comments about this document by clicking the Feedback[+] link at(http://docs.sun.com). Include the title and part number of your document with your feedback:
SPARC Enterprise T5120 and T5220 Servers Installation Guide, part number 820-2178-14.
Using This Documentation xi
xii SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Preparing for Installation
This chapter provides background information about the installation procedures for the Sun SPARC Enterprise T5120 and T5220 servers srom Oracle. This chapter contains these topics:
“Server Overview” on page 1
“Server Handling Precautions” on page 3
“Input Power Information and Precautions” on page 4
“Tools and Equipment Needed” on page 5
“Optional Component Installation” on page 5
“ESD Precautions” on page 6
“Installation Overview” on page 6
“Preparing for Installation” on page 8
“Installing the Hardware” on page 8
“Configuring the Service Processor” on page 9
“Configuring the Host Software” on page 10
“Cabling Notes for Both Servers” on page 10
“Port, Connector, and LED Locations for Both Servers” on page 12
“Slide Rail Assembly Notes for Both Servers” on page 15
“Cable Management Notes for Both Servers” on page 18
Server Overview
The Sun SPARC Enterprise T5120 server is a 1 rack unit (1U) server. The Sun SPARC Enterprise T5220 server is a 2 rack unit (2U) server.
1
FIGURE: SPARC Enterprise T5120 Server
FIGURE: SPARC Enterprise T5220 Server
Related Information
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
SPARC Enterprise T5120 Server Getting Started Guide
SPARC Enterprise T5220 Server Getting Started Guide
SPARC Enterprise T5120 Server Getting Started Guide (DC)
SPARC Enterprise T5220 Server Getting Started Guide (DC)
2 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Sun SPARC Enterprise T5120 and T5220 Servers Service Manual
Server Handling Precautions
Caution – Deploy the antitilt bar on the equipment rack before beginning an
installation.
Caution – The SPARC Enterprise T5220 server weighs approximately 55 lb (25. kg).
Two people are required to lift and mount this 2U server into a rack enclosure when using the procedures in this document.
Caution – When completing a two-person procedure, always communicate your
intentions clearly before, during, and after each step to minimize confusion.
Related Information
“Input Power Information and Precautions” on page 4
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
SPARC Enterprise T5120 Server Getting Started Guide
SPARC Enterprise T5220 Server Getting Started Guide
SPARC Enterprise T5120 Server Getting Started Guide (DC)
SPARC Enterprise T5220 Server Getting Started Guide (DC)
Preparing for Installation 3
Input Power Information and Precautions
The Sun SPARC Enterprise T5120 and T5220 servers are available in the following input power configurations:
Two redundant, hot-swappable AC power supplies
Two redundant, DC power supplies
Note – Safety agency requirements prohibit manufacturers from changing a product
from AC input to DC input or from DC input to AC input after the product has been removed from the agency approved manufacturing site.
Note – The DC version of the server must be installed in a restricted-access location.
According to the intent of the National Electrical Code, a restricted-access location is an area intended for qualified or trained personnel only and has access controlled by a locking mechanism, such as a key lock or an access card system.
When each power supply is connected to a separate power source, the server continues to operating under the following fault conditions:
A power source failure that removes input power from one of the power supplies.
Failure of one of the power supplies.
Service actions which require removal of one of the power supplies.
Refer to the Sun SPARC Enterprise T5120 and T5220 Servers Site Planning Guide for input power specifications.
Note – Input AC/DC power cables: To avoid missing initialization messages, do not
attach power cables to the power supplies until you have finished connecting the data cables, and have connected the server to a serial terminal or a terminal emulator (PC or workstation). The server goes into Standby mode and the ILOM service processor initializes as soon as the input power cables are connected to the power source.
Related Information
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
Sun SPARC Enterprise T5120 and T5220 Servers Site Planning Guide
4 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Tools and Equipment Needed
To install the system, you must have the following tools:
No. 2 Phillips screwdriver
ESD mat and grounding strap
In addition, you must provide a system console device, such as one of the following:
ASCII terminal
Workstation
Terminal server
Patch panel connected to a terminal server
Related Information
“Optional Component Installation” on page 5
Optional Component Installation
The standard components of the server are installed at the factory. However, if you ordered options such as additional memory or PCI cards, these options will be shipped separately. If possible, install these components prior to installing the server in a rack.
If you ordered any options that are not factory-installed, see the SPARC Enterprise T5120 and T5220 Servers Service Manual for installation instructions.
Note – The list of optional components can be updated without notice. See the
product web pages for the most current list of components supported in the server.
Related Information
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
SPARC Enterprise T5120 Server Getting Started Guide
SPARC Enterprise T5220 Server Getting Started Guide
SPARC Enterprise T5120 Server Getting Started Guide (DC)
Preparing for Installation 5
SPARC Enterprise T5220 Server Getting Started Guide (DC)
Sun SPARC Enterprise T5120 and T5220 Servers Service Manual
ESD Precautions
Electronic equipment is susceptible to damage by static electricity. Use a grounded antistatic wriststrap, footstrap, or equivalent safety equipment to prevent electrostatic damage (ESD) when you install or service the servers.
Caution – To protect electronic components from electrostatic damage, which can
permanently disable the system or require repair by service technicians, place components on an antistatic surface, such as an antistatic discharge mat, an antistatic bag, or a disposable antistatic mat. Wear an antistatic grounding strap connected to a metal surface on the chassis when you work on system components.
Related Information
“Installation Overview” on page 6
Installation Overview
This installation guide provides procedures that are to be performed in the following order.
6 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
FIGURE: Installation Overview
Figure Legend
1 Preparing for installation
2 Installing the hardware
3 Configuring the service processor
4 Configuring the host software
Preparing for Installation 7
Preparing for Installation
1. Verify that you have received all of the components that ship with your server.
2. Gather configuration information for your system. See your system administrator for specific details, including these parameters:
Netmask
IP address for the service processor
Gateway IP address
3. Install any optional components shipped with your system. If you have purchased other optional components such as additional memory, install them prior to mounting the server in a rack.
Related Information
“Optional Component Installation” on page 5
Installing the Hardware
1. Mount the server into a rack or cabinet. See “Installing the Servers in a Rack” on
page 21 for both the 1U and 2U servers. Or, if you ordered the express rail
rackmounting kit, which has the same rack rail assemblies for both servers, see
“Installing the Servers in a Rack With Express Rails” on page 78.
Note – In the rest of this manual, the term rack means either an open rack or a closed
cabinet.
2. Connect the server to a serial terminal or a terminal emulator (PC or workstation) to display system messages. See “Powering On the System for the First Time” on
page 45.
8 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Tip – The serial terminal or a terminal emulator should be connected before you
connect the power cables. As soon as AC power is connected to the system, the service processor immediately powers on and runs diagnostics. Diagnostic test failures will be printed on the serial terminal. For more information, refer to the
Oracle Integrated Lights Out Manager 3.x Supplement for SPARC Enterprise T5120 and T5220 Servers.
1. Connect the data cables to the server, but do not connect the AC power cable yet. See “Connecting the Server Cables for Both Servers” on page 37.
2. Connect the AC power cable to the server and examine the display for any error messages. See “Powering On the System for the First Time” on page 45.
Caution – There is a potential for electric shock if the server and related equipment
are not properly grounded.
Note – The service processor runs on the 3.3V standby voltage. As soon as AC
power is connected to the system, the service processor immediately powers on, runs diagnostics, and initializes the ILOM firmware.
Related Information
“Configuring the Service Processor” on page 9
Configuring the Service Processor
1. After the service processor boots, access the ILOM command-line interface (CLI) through the serial management port. See “Log Into the Service Processor Using the
Network Management Port” on page 58.
2. Configure the service processor network addresses. See “Configure the Service
Processor Network Management Port” on page 55.
Note – The service processor network management port is not operational until you
configure network settings for the service processor (through the service processor serial management port).
Preparing for Installation 9
3. Commit the changes to the service processor network parameters. See Step 3 in
“Power On the System for the First Time” on page 47.
4. Power on the server from a keyboard using the ILOM software.
Related Information
“Power On the System” on page 59
Configuring the Host Software
1. Configure the Solaris OS. See “Boot the Solaris Operating System” on page 64.
The Solaris OS is preinstalled on the servers. When you power on, you are automatically guided through the Solaris OS configuration procedure.
2. Install any required patches to the server.
Refer to the SPARC Enterprise T5120 and T5220 Server Product Notes for a list of required patches.
3. Load additional software from the Solaris media kit (optional).
The Solaris media kit (sold separately) includes several CDs containing software to help you operate, configure, and administer your server. Refer to the documentation provided with the media kit for a complete listing of included software and detailed installation instructions.
Related Information
“Cabling Notes for Both Servers” on page 10
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
Sun SPARC Enterprise T5120 and T5220 Servers Product Notes
Cabling Notes for Both Servers
Minimum cable connections for the servers:
At least one system on-board Ethernet network connection (NET port)
The service processor serial management port (SER MGT port)
10 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
The service processor network management port (NET MGT port)
Power cables for the two system power supplies
Service processor management ports: There are two service processor
management ports for use with the ILOM service processor.
The service processor serial management port (labeled SER MGT) uses an
RJ-45 cable and is always available. This port is the default connection to the ILOM service processor.
The service processor network management port (labeled NET MGT) is the
optional connection to the ILOM service processor. This port is not available until you configure network settings for the service processor (through the service processor serial management port). See “Enabling the Service Processor
Network Management Port” on page 51. The service processor network
management port uses an RJ-45 cable for a 10/100 BASE-T connection. This port does not support connections to Gigabit networks.
Ethernet ports are labeled NET0, NET1, NET2, and NET3. The Ethernet interfaces
operate at 10 Mbps, 100 Mbps, and 1000 Mbps.
TABLE: Ethernet Connection Transfer Rates
Connection Type IEEE Terminology Transfer Rate
Ethernet 10BASE-T 10 Mbit/sec
Fast Ethernet 100BASE-TX 100 Mbits/sec
Gigabit Ethernet 1000BASE-T 1000 Mbit/sec
TTY serial port: Use the DB-9 connector with a null modem cable for serial
devices. This port appears as ttya in Solaris OS and OpenBoot messages. This port is not connected to the service processor serial management port.
USB Ports: USB ports support hot-plugging. You can connect and disconnect USB
cables and peripheral devices while the system is running, without affecting system operations.
You can only perform USB hot-plug operations while the OS is running. USB
hot-plug operations are not supported when the system ok prompt is displayed or before the system has completed booting.
You can connect up to 126 devices to each of the four USB controllers, for a total
of 504 USB devices per system.
AC power cables: Do not attach power cables to the power supplies until you
have finished connecting the data cables, and have connected the server to a serial terminal or a terminal emulator (PC or workstation). The server goes into Standby mode and the ILOM service processor initializes as soon as the AC power cables are connected to the power source. System messages might be lost after 60 seconds if the server is not connected to a terminal, PC, or workstation.
Preparing for Installation 11
Related Information
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
SPARC Enterprise T5120 Server Getting Started Guide
SPARC Enterprise T5220 Server Getting Started Guide
SPARC Enterprise T5120 Server Getting Started Guide (DC)
SPARC Enterprise T5220 Server Getting Started Guide (DC)
Port, Connector, and LED Locations for Both Servers
The ports on the servers are shown in the figures below.
FIGURE: Rear Panel Cable Connectors and LEDs on the SPARC Enterprise T5120 Server
Figure Legend
1 Power supply 0 10 Gbit Enet port NET2
2 Power supply 1 11 Gbit Enet port NET3
3 Locator LED button 12 USB port 0
4 Service Required LED 13 USB port 1
5 PowerOKLED 14 TTYA serial port
6 Service processor serial management port 15 PCIe/XAUI slot 0
7 Service processor network management port 16 PCIe/XAUI slot 1
8 Gbit Enet port NET0 17 PCIe slot 2
9 Gbit Enet port NET1
USB ports 2 and 3 are located on the front panel.
12 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
FIGURE: Front Panel USB Ports on the SPARC Enterprise T5120 Server
Figure Legend
1 System status indicators: Top to bottom:
5 Hard drive HDD3
Locator LED button, Service Required LED, Power OK LED, Power button
2 Hard drive HDD0 6 USB port 2
3 Hard drive HDD1 7 USB port 3
4 Hard drive HDD2
FIGURE: Rear Panel Cable Connectors and LEDs on the SPARC Enterprise T5220 Server
Figure Legend
1 Power supply 0 11 Gbit Enet port NET3
2 Power supply 1 12 USB port 0
3 Locator LED button 13 USB port 1
4 Service Required LED 14 TTYA serial port
5 PowerOKLED 15 PCIe slot 3
6 Service processor serial management port 16 PCIe or XAUI slot 0
7 Service processor network management port 17 PCIe slot 4
Preparing for Installation 13
Figure Legend (Continued)
8 Gbit Enet port NET0 18 PCIe or XAUI slot 1
9 Gbit Enet port NET1 19 PCIe slot 5
10 Gbit Enet port NET2 20 PCIe slot 2
USB ports 2 and 3 are located on the front panel.
FIGURE: Front Panel USB Ports on the SPARC Enterprise T5220 Server
Figure Legend
1 System status indicators: Top to bottom: Locator LED button,
7 Hard drive HDD5
Service Required LED, Power OK LED, Power button
2 Hard drive HDD0 8 Hard drive HDD6
3 Hard drive HDD1 9 Hard drive HDD7
4 Hard drive HDD2 10 USB port 2
5 Hard drive HDD3 11 USB port 3
6 Hard drive HDD4
Related Information
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
SPARC Enterprise T5120 Server Getting Started Guide
SPARC Enterprise T5220 Server Getting Started Guide
SPARC Enterprise T5120 Server Getting Started Guide (DC)
SPARC Enterprise T5220 Server Getting Started Guide (DC)
SPARC Enterprise T5120 and T5220 Servers Service Manual
14 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Slide Rail Assembly Notes for Both Servers
The rackmounting kit has two slide rail assemblies. A slide rail assembly can be installed on either the right or left side of the rack.
Note – The slide rail assemblies are different for the T5120 and T5220 servers. The
removable mounting bracket of the SPARC Enterprise T5120 rails slides 13 in. (33 cm) out of the slide rail, then locks in place. The removable mounting bracket of the SPARC Enterprise T5220 rails slide 14 in. (35.5 cm) before locking.
Each slide rail assembly consists of a three-section slide rail and a removable mounting bracket.
FIGURE: Sections of the Slide Rail Assembly on the SPARC Enterprise T5220 Server
Figure Legend
1 Mounting bracket
2 Front section
3 Middle section
4 Rear section
Preparing for Installation 15
The front, middle, and rear sections form the slide rail. The middle and rear sections
have holes for mounting screws, and adjust to fit rack depths from 24 in. (61 cm) to 36.5 in. (93 cm). The front section can be extended to allow movement of the server out of the rack.
The removable mounting bracket slides 14 in. (35.5 cm) out of the slide rail, then
locks in place. If you unlock the mounting bracket at this point, it slides an additional 12 in. (30 cm) before separating from the slide rail. You can then mount the mounting bracket to the right or left side of the server chassis.
Note that there are five locks in a slide rail assembly. Four are on the mounting
bracket. One lock is on the front section of the slide rail. The locks are described in
“Installing the SPARC Enterprise T5120 and T5220 Servers” on page 21.
16 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
FIGURE: Locating the Locks on the Slide Rail Assembly for the SPARC Enterprise T5220
Server
Preparing for Installation 17
Related Information
“Cable Management Notes for Both Servers” on page 18
“Installing the Servers in a Rack” on page 21
Cable Management Notes for Both Servers
The same cable management arm (CMA) is included with the rackmounting kit for each server. The CMA clips onto the slide rails. Use the velcro straps to secure cabling to the CMA.
FIGURE: Cable Management Arm for Both Servers
18 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Installing the SPARC Enterprise T5120 and T5220 Servers
This chapter provides instructions for installing the servers into an equipment rack.
Note – If your rackmounting kit came with its own instructions, use the instructions
in your rackmounting kit instead of the instructions in this chapter. After performing the server installation, proceed to “Powering On the System” on page 45 for first-time power on.
Note – References to left and right are from your viewpoint as you face either the
front or rear of the equipment.
This chapter contains the following sections:
“Installing the Servers in a Rack” on page 21
“Installing the Cable Management Arm for Both Servers” on page 30
“Connecting the Server Cables for Both Servers” on page 37
“Managing Cables With the CMA” on page 42
“Dismounting the Servers” on page 43
Installing the Servers in a Rack
Note – Ensure that you have all of the parts in the rackmounting kit before you
begin the installation of the server.
21
Note – The procedures in this chapter are the same for both the 1U and 2U servers.
The illustrations show a 2U server only as an example.
The rackmounting kit (same for both 1U and 2U servers) contains two slide rail assemblies, which can be installed on either the right or left side of the rack. A slide rail assembly consists of two parts, a slide rail and a removable mounting bracket. The slide rail attaches to the rack posts. The mounting bracket attaches to the server chassis. See “Slide Rail Assembly Notes for Both Servers” on page 15 for more information about slide rail assemblies.
“Install the Slide Rail Assemblies” on page 22
“Insert and Lock the Server in the Rack” on page 29
Related Information
“Slide Rail Assembly Notes for Both Servers” on page 15
“Install the Slide Rail Assemblies” on page 22
Install the Slide Rail Assemblies
1. Pull both mounting brackets completely out of their respective slide rails.
a. Simultaneously press and hold the upper and lower lock buttons of the slide
rail lock.
22 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
FIGURE: Unlocking the Slide Rail Assembly (Either Server)
b. Pull the mounting bracket out until it locks in the extended position.
c. Slide the mounting bracket release button out in the direction shown, then
slide the mounting bracket out of the slide rail.
Installing the SPARC Enterprise T5120 and T5220 Servers 23
FIGURE: Location of the Mounting Bracket Release Button (Either Server)
d. Press the metal lever (labeled Push) on the middle section of the sliding rail,
then push the middle section back into the rack.
24 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
FIGURE: Unlocking the Slide Rail Middle Section (Either Server)
2. Attach a mounting bracket to the right side of the chassis.
a. Position the mounting bracket against the chassis. Ensure that the slide rail
lock is at the front and the three keyed openings on the mounting bracket are aligned with the three locating pins on the side of the chassis.
Installing the SPARC Enterprise T5120 and T5220 Servers 25
FIGURE: Attaching a Mounting Bracket to the Chassis (Either Server)
b. Ensure that the heads of the locating pins protrude though the keyed
openings in the mounting bracket. Pull the mounting bracket toward the front of the chassis until the bracket locks into place with an audible click.
c. Verify that all locating pins are trapped in the keyed openings and that the
correct locating pin has engaged the mounting bracket lock.
3. Attach the second mounting bracket to the left side of the chassis.
4. Determine which rack hole numbers to use when attaching the slide rails to the rack posts.
If the server is two rack units high (2U), the slide rails occupy the lower half of the 2U space.
5. Determine which screws you will use to mount the slide rails.
If your rack has threaded mounting holes in the rack posts, determine whether the threads are metric or standard. Select the appropriate screws from the package included in the mounting kit.
If your rack does not have threaded mounting holes, the mounting screws are secured with a caged nut.
26 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
6. Attach a slide rail to the right front rack post.
a. Loosely attach the front of a slide rail to the right front rack post using two
screws.
Note – Do not tighten the screws yet.
FIGURE: Mounting a Slide Rail (Either Server)
b. Adjust the length of the slide rail by sliding the rear mounting flange to
reach the outside edge of the rear rack post.
c. Loosely attach the rear of the slide rail to the rear rack post with two screws.
7. Attach the second slide rail to the left rack posts in a similar manner.
Do not tighten the screws.
8. Use the slide rail spacing tool to adjust the distance between the slide rails.
a. At the front of the rack, plug the left side of the tool into slots at the end of
the left rail.
Installing the SPARC Enterprise T5120 and T5220 Servers 27
FIGURE: Using the Slide Rail Spacing Tool to Adjust the Distance Between the Slide Rails
(Either Server)
b. Insert the right side of the tool into the front end of the right rail.
c. Slide the end of the rail to the right or left as needed to allow the ends of the
tool to enter the ends of both rails.
The distance between the rails is now equal to the width of the server with mounting brackets.
d. Tighten the screws to lock the ends of the rails in place.
e. At the rear of the rack, repeat Step a through Step d for the rear ends of the
rails.
Related Information
“Insert and Lock the Server in the Rack” on page 29
28 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Insert and Lock the Server in the Rack
1. Insert the ends of the mounting brackets into the sliding rails.
Caution – The weight of the servers on extended slide rails can be enough to
overturn an equipment rack.
Caution – The 2U server weighs approximately 55 lb (25 kg). Two people are
required to lift and mount the server into a rack enclosure when using the procedures in this chapter.
Caution – Before continuing, verify that the server is securely mounted in the rack,
and that the slide rails are locked to the mounting brackets.
2. Deploy the antitilt bar, if the chassis or rack has an antilt bar.
3. Slide the chassis into the rack.
Installing the SPARC Enterprise T5120 and T5220 Servers 29
FIGURE: Mounting the Chassis on the Slide Rails (Either Server)
Related Information
“Installing the Cable Management Arm for Both Servers” on page 30
Installing the Cable Management Arm for Both Servers
The rackmounting kit for each server comes with the same cable management arm (CMA) assembly. The CMA installation and cable management procedures are the same for both servers. See “Cable Management Notes for Both Servers” on page 18 for more information on the cable management arm.
30 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Note – The CMA includes velcro straps to secure the cables inside the CMA. Do not
install the velcro straps until you install the CMA, connect the cables, and place the cabling inside the CMA as described in the following procedures.
“Install the Cable Management Arm” on page 31
“Verify the Operation of the Slide Rails and the CMA” on page 35
Install the Cable Management Arm
Caution – Support the CMA during this installation. Do not allow the assembly to
hang by its own weight until it is secured by all three attachment points.
1. Remove the tape from the CMA rail extension (on the left of the CMA) and remove the CMA rail extension.
2. Attach the CMA rail extension to rear left slide rail.
At the rear of the rack, plug the CMA rail extension into the end of the left sliding rail assembly. The tab at the front of the rail extension clicks into place.
Installing the SPARC Enterprise T5120 and T5220 Servers 31
FIGURE: Inserting the CMA Rail Extension Into the Rear of the Left Slide Rail (Either Server)
The right sides of the two CMA arms have hinged extensions. On the manufacturer’s instruction sheet, the smaller extension is called the CMA Connector for Inner Member. This extension attaches to the right mounting bracket. The larger extension is called the CMA Connector for Outer Member, and attaches to the right sliding rail.
3. Insert the smaller extension into the clip located at the end of the mounting bracket.
Slide the smaller extension into the square hole on the middle-in-width of the clip that is located at the end of the mounting bracket.
32 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
FIGURE: Mounting the Inner CMA Connector (Either Server)
4. Insert the larger extension into the end of the right sliding rail.
Installing the SPARC Enterprise T5120 and T5220 Servers 33
FIGURE: Attaching the Outer CMA Connector (Either Server)
5. Insert the hinged plastic connector at the left side of the CMA fully into the CMA rail extension.
The plastic tab on the CMA rail extension locks the hinged plastic connector in place.
34 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
FIGURE: Mounting the Left Side of the Slide Rail (Either Server)
Related Information
“Verify the Operation of the Slide Rails and the CMA” on page 35
“Cable Management Notes for Both Servers” on page 18
Verify the Operation of the Slide Rails and the
CMA
Tip – Two people are needed for this procedure, one to move the server in and out
of the rack, and one to observe the cables and CMA.
1. For a free-standing rack, deploy the antitilt bar.
Installing the SPARC Enterprise T5120 and T5220 Servers 35
2. Unlock the slide lock buttons at the right and left sides of the chassis.
3. Slowly pull the server out of the rack until the slide rails reach their stops.
FIGURE: Unlocking the Slide Rail Assembly (Either Server)
4. Inspect any attached cables for binding or kinks.
5. Verify that the CMA extends fully and does not bind in the slide rails.
6. Verify that the server extends fully and locks in the maintenance position.
The server should stop after approximately 15 in. (40 cm) of travel.
7. Pull both slide rail release buttons toward you simultaneously and slide the server back into the rack.
The server should slide smoothly into the rack without binding.
36 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
FIGURE: Rail Mounting Bracket Release Button (Either Server)
8. Verify that the CMA retracted without binding.
9. Adjust the cable straps and CMA as required to secure the cables.
See “Managing Cables With the CMA” on page 42.
Connecting the Server Cables for Both Servers
To boot the server, you must connect and configure the network and serial ports. The procedures are given in the following sections.
“Managing Cables With the CMA” on page 42
“Dismounting the Servers” on page 43
The servers also have serial and USB ports available for connections to optional devices. See “Port, Connector, and LED Locations for Both Servers” on page 12 for more information.
Installing the SPARC Enterprise T5120 and T5220 Servers 37
Note – When you are finished connecting the cables to the server, ensure that the
server can slide smoothly in and out of the rack without binding or damaging the cables. See the section, “Verify the Operation of the Slide Rails and the CMA” on
page 35.
This topic contains the following tasks:
“Connect the Service Processor Serial Management Port” on page 38
“Connect the Service Processor Network Management Port” on page 40
“Connect the Ethernet Network Cables” on page 41
“Connect the AC Power Cable to the Server” on page 41
Related Information
“Verify the Operation of the Slide Rails and the CMA” on page 35
“Secure the Server Cables in the CMA” on page 42
Connect the Service Processor Serial Management Port
The service processor serial management port is marked SER MGT. This port is the farthest left RJ-45 port on the rear panel.
Note – The cable and DB-9 RJ-45 adapters are for the host serial port, and not for the
server SER MGT port.
38 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
FIGURE: Service Processor Serial Management Port – Rear Panel
Use this port for server management. This port is needed to set up the service processor network management port, as detailed in “Enabling the Service Processor
Network Management Port” on page 51.
Note – Use the service processor serial management port only for server
management. This port is the default connection between the service processor and a terminal or a computer.
Connect a Category 5 cable from the SER MGT serial management port to the terminal device.
When connecting either a DB-9 or a DB-25 cable, use an adapter to perform the crossovers given for each connector.
Caution – Do not attach a modem to this port.
Related Information
“Enabling the Service Processor Network Management Port” on page 51
“Connect the Service Processor Network Management Port” on page 40
Installing the SPARC Enterprise T5120 and T5220 Servers 39
Connect the Service Processor Network
Management Port
The service processor network management port is labeled NET MGT. This port is located just to the right of the serial management (SER MGT) port on the rear panel.
Connect a Category 5 cable from the NET MGT network management port to
your network switch or hub.
FIGURE: Service Processor Network Management Port – Rear Panel
Note – This port is not operational until you configure the network settings (through
the serial management port), as detailed in “Configure the Service Processor
Network Management Port” on page 55.
Note – If you have access to a DHCP server on the network, you can see the service
processor get an IP address because the DHCP client is enabled by default.
Note – The service processor network management port is configured by default to
retrieve network settings with Dynamic Host Configuration Protocol (DHCP) and allow connections using Solaris Secure Shell (SSH). You might need to modify these settings for your network. Instructions are given in “Powering On the System” on
page 45.
Related Information
“Connect the Ethernet Network Cables” on page 41
40 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Connect the Ethernet Network Cables
The server has four network connectors, marked NET0, NET1, NET2, and NET3. These connectors are RJ-45 Gigabit Ethernet.
Connect a Category 5 cable from your network switch or hub to Ethernet Port 0
(NET0) on the rear of the chassis.
NET0 is the farthest left port in the 4-port network cluster.
Connect Category 5 cables from your network switch or hub to the remaining Ethernet ports (NET1, NET2, NET3), as needed.
FIGURE: Service Processor Ethernet Network Ports – Rear Panel
Related Information
“Connect the AC Power Cable to the Server” on page 41
Connect the AC Power Cable to the Server
Powering on the system for the first time requires special preparation and procedures. For example, if you have not prepared a display before connecting the AC power cable, system messages might be lost.
Caution – Finish the hardware procedures in this chapter, but do not attach the AC
power cable yet.
Powering on the system for the first time requires special preparation and procedures. For example, if you have not prepared a display before connecting the AC power cable, system messages could be lost.
Installing the SPARC Enterprise T5120 and T5220 Servers 41
Caution – The server goes into Standby mode and the service processor initializes as
soon as the AC power cable is connected to the power source.
Go to “Powering On the System for the First Time” on page 45 for instructions
on connecting the server to AC power.
Related Information
“Powering On the System for the First Time” on page 45
Managing Cables With the CMA
Managing the cables with the CMA is the same for both servers.
“Secure the Server Cables in the CMA” on page 42
Related Information
“Secure the Server Cables in the CMA” on page 42
Secure the Server Cables in the CMA
Once the server cables are connected and placed inside the CMA, open the
velcro cable straps and wrap the straps around the CMA securing the cables inside the CMA.
42 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
FIGURE: Securing the Server Cables With the CMA and Velcro Straps (Either Server)
Caution – Verify the operation of the slide rails and CMA, and cable service loops.
Perform the steps in the following procedure again before continuing: “Verify the
Operation of the Slide Rails and the CMA” on page 35.
Related Information
“Dismounting the Servers” on page 43
Dismounting the Servers
To install or replace internal parts in the server, you must first remove the server from the rack.
Installing the SPARC Enterprise T5120 and T5220 Servers 43
Related Information
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
SPARC Enterprise T5120 and T5220 Servers Service Manual
44 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Powering On the System
This chapter includes instructions for booting the servers and for enabling the service processor network management port.
This chapter contains the following topics:
“Powering On the System for the First Time” on page 45
“Enabling the Service Processor Network Management Port” on page 51
“Logging Into the Service Processor” on page 53
“Using the Service Processor for Common Operations” on page 58
“Power On the System” on page 59
“Connect to the System Console” on page 60
“Perform a Normal System Initialization” on page 61
“Devices in the OpenBoot Device Tree” on page 62
“Boot the Solaris Operating System” on page 64
“Avoid Booting the Solaris Operating System at Startup” on page 65
“Reset the System” on page 65
“Power Cycle the System” on page 66
“Verifying System Functionality” on page 67
Powering On the System for the First Time
This section provides an overview and instructions for powering on your system the first time.
“ILOM System Console” on page 46
“ILOM Service Processor” on page 46
“Power On the System for the First Time” on page 47
45
Related Information
“ILOM System Console” on page 46
“Enabling the Service Processor Network Management Port” on page 51
“Verifying System Functionality” on page 67
ILOM System Console
When you power on the system, the boot process begins under the control of the Integrated Lights Out Manager (ILOM) system console. The system console displays status and error messages generated by firmware-based tests during system startup.
Note – To see these status and error messages, connect a terminal or terminal
emulator to the serial management port (SER MGT). For a basic procedure to connect a terminal or terminal emulator, see “Power On the System for the First Time” on
page 47.
For a more detailed discussion on configuring the system console and connecting terminals, refer to the SPARC Enterprise T5120 and T5220 Server Administration Guide.
Related Information
“ILOM Service Processor” on page 46
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
Sun SPARC Enterprise T5120 and T5220 Servers Administration Guide
ILOM Service Processor
After the system console finishes its low-level system diagnostics, the ILOM service processor initializes and runs a higher level of diagnostics. When you access the ILOM service processor using a device connected to the serial management port, you see the output of the ILOM diagnostics.
By default, the service processor configures the network management port automatically, retrieving network configuration settings using the Dynamic Host Configuration Protocol (DHCP) and allowing connections using Secure Shell (SSH).
Note – If you are unable to use DHCP on your network, you must connect to the
ILOM service processor using the serial management port to configure the network management port for your network.
46 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Related Information
“Power On the System for the First Time” on page 47
“Configure the Service Processor Network Management Port” on page 55
Power On the System for the First Time
1. Confirm that you have completed all of the preparations for installation.
See the instructions in “Preparing for Installation” on page 1.
2. Confirm that you have completed the installation of the server in its rack.
See the instructions in “Installing the SPARC Enterprise T5120 and T5220 Servers”
on page 21.
3. Connect a terminal or a terminal emulator (PC or workstation) to the service processor serial management port.
Configure the terminal or terminal emulator with these settings:
9600 baud
8 bits
No parity
1 Stop bit
No handshake
A null modem configuration is needed, meaning the transmit and receive signals are reversed (crossed over) for DTE to DTE communications. You can use the supplied RJ-45 crossover adapters with a standard RJ-45 cable to achieve the null modem configuration.
Note – When you power on the server for the first time and you do not have a
terminal or terminal emulator (PC or workstation) connected to the service processor serial management port, you will not see system messages.
(Optional) Connect an Ethernet cable between the server ’s NET MGT port and the network to which future connections to the SP and host will be made.
4. After the initial configuration of the system using the SP SER MGT port, communication with the SP and host is usually performed through this Ethernet interface.
Connect an Ethernet cable between one of the server ’s NET ports and the network to which the server will communicate.
Powering On the System 47
FIGURE: Server Connections
Figure Legend
1 Power Cables 5 RJ-45 to DB-25 crossover adapter
2 Ethernet cables 6 RJ-45 to DB-9 crossover adapter
3 Service processor to ethernet 7 Terminal device
4 NET MGT to network (optional)
48 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
5. Plug the power cords into the power supplies and into separate power sources.
To provide redundancy, plug both power supplies into separate power sources.
The system can operate with only one power connection, but there is no redundancy in this case.
The service processor runs on the 3.3V standby voltage. As soon as AC power is connected to the system, the service processor powers on, runs diagnostics, and initializes the ILOM firmware.
After a few minutes, the SP login prompt appears on the terminal device. The host is not initialized or powered on yet.
6. At the terminal device, log in to the SP as root with a password of changeme.
XXXXXXXXXXXXXXXX login: root Password: changeme . . .
->
After a brief delay, the SP prompt is displayed (->). At this point, there are many commands you can perform using the Integrated Lights Out Manager interface.
Additional SP information, such as how to change the password and how to set up the SP network parameters is available in the online documentation set.
7. Power on the server and redirect the host output to display on the serial terminal device:
-> start /SYS Are you sure you want to start /SYS (y/n)? y
-> start /SP/console Are you sure you want to start /SP/CONSOLE (y/n)? y Serial console started. To stop, type #. . . .
After you start the SP console, the server initialization takes approximately 20 minutes to complete.
Powering On the System 49
8. When prompted, follow the onscreen instructions for configuring the Solaris Operating System on your host and enter the following configuration information.
You will be prompted to confirm the configuration several times, enabling confirmation and changes. If you are not sure how to respond to a particular value, you can accept the default, and make future changes when the Solaris OS is running.
Parameter Description
Language Select a number from the displayed language list.
Locale Select a number from the displayed locale list.
Terminal Type Select a terminal type that corresponds with your terminal device.
Network? Select Yes.
Multiple Network Interfaces
DHCP? Select Yes or No according to your network environment.
Host Name Enter the host name for the server.
IP Address Enter the IP address for this Ethernet interface.
Subnet? Select Yes or No according to your network environment.
Subnet Netmask (If subnet was Yes) Enter the netmask for the subnet for your network
IPv6? Specify whether or not to use IPv6. If you are not sure, select No to configure the
Security Policy Select either standard UNIX security (No) or Kerberos Security (Yes). If you are not
Confirm Review the onscreen information and change it if needed. Otherwise, continue.
Name Service Select the name service according to your network environment.
NFSv4 Domain Name Select the type of domain name configuration according to your environment. If
Select the network interfaces that you plan to configure. If you are not sure, select the first one in the list.
environment.
Ethernet interface for IPv4.
sure, select No.
Note–If you select a name service other than None, you will be prompted for additional name service configuration information.
you are not sure, select Use the NFSv4 domain derived by the system.
Time Zone (Continent) Select your continent.
Time Zone (Country or Region)
50 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Select your country or region.
Time Zone Select the time zone.
Date and Time Accept the default date and time or change the values.
root Password Enter the root password twice. This password is for the superuser account for the
Solaris OS on this server. This password is not the SP password.
9. Log in to the server and explore its capabilities.
There are many commands you can use to verify the functionality of the system. The following list describes a few of them:
showrev – Displays the hostname and system architecture information. Use the
-a option with this command to see the patches that are installed.
psrinfo – Displays information about the number and status of the processors
and cores in the host.
prtdiag – Displays system configuration and diagnostic information.
Review the Solaris OS man pages and documentation for more details.
Related Information
“Enabling the Service Processor Network Management Port” on page 51
Solaris Documentation
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
Sun SPARC Enterprise T5120 and T5220 Servers Administration Guide.
Enabling the Service Processor Network Management Port
The service processor network management port is not operational unless your network employs DHCP, in which case the configuration in automatic. If you network uses DHCP, you can run this command to view your server’s network configuration information:
-> show /SP/network
For example:
-> show /SP/network
/SP/network Targets:
Powering On the System 51
Properties: commitpending = (Cannot show property) dhcp_server_ip = 10.8.31.5 ipaddress = 10.8.31.188 ipdiscovery = dhcp ipgateway = 10.8.31.248 ipnetmask = 255.255.252.0 macaddress = 00:14:4F:7E:83:4F pendingipaddress = 10.8.31.188 pendingipdiscovery = dhcp pendingipgateway = 10.8.31.248 pendingipnetmask = 255.255.252.0 state = enabled
Commands: cd set show
If your network does not use DHCP, the network management port is not operational until you configure network settings for the service processor. Configure the service processor in this order:
1. After the service processor boots, access the ILOM CLI through the serial management port. See “Log Into the Service Processor Using the Serial
Management Port” on page 53.
2. Configure the service processor. See “Configure the Service Processor Network
Management Port” on page 55.
3. Commit the changes to the service processor parameters. See Step 3 in “Configure
the Service Processor Network Management Port” on page 55.
You can now use the network management port at any time to access the service processor.
See “Log Into the Service Processor Using the Network Management Port” on
page 58.
Related Information
“Logging Into the Service Processor” on page 53
52 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Logging Into the Service Processor
If you are powering on the system for the first time after installation, use the service processor serial port to power on the system and run POST. See “Log Into the Service
Processor Using the Serial Management Port” on page 53.
If the network management port has already been configured, you can use it instead of the serial management port.
This topic contains the following tasks:
“Log Into the Service Processor Using the Serial Management Port” on page 53
“Configure the Service Processor Network Management Port” on page 55
“Log Into the Service Processor Using the Network Management Port” on page 58
Related Information
“Log Into the Service Processor Using the Serial Management Port” on page 53
“Log Into the Service Processor Using the Network Management Port” on page 58
Log Into the Service Processor Using the Serial
Management Port
After the service processor boots, access the ILOM CLI to configure and manage the system. The ILOM CLI prompt (->) is displayed at the first time the service processor is booted. The default configuration provides an ILOM CLI root user account. The default root password is changeme. Change the password using the service processor ILOM CLI password command.
1. If this is the first time the system has been powered on, use the password command to change the root password.
... Starting OpenBSD Secure Shell server: sshd. Starting Servicetags listener: stlistener. Starting FRU update program: frutool.
hostname login: root Password: changeme
Copyright 2007 Sun Microsystems, Inc. All rights reserved. Use is subject to license terms.
Powering On the System 53
... Federal Acquisitions: Commercial Software -- Government Users Subject to Standard License Terms and Conditions. ...
Warning: password is set to factory default.
-> set /SP/users/root password Enter new password: ******** Enter new password again: ********
->
Note – After the root password has been set, on subsequent reboots, the ILOM CLI
login prompt is displayed.
2. Enter root for the login name followed by your password.
... hostname login: root Password: password (nothing displayed) Waiting for daemons to initialize...
Daemons ready
Integrated Lights Out Manager
Version 2.0.0.0
Copyright 2007 Sun Microsystems, Inc. All rights reserved. Use is subject to license terms.
->
Related Information
“Configure the Service Processor Network Management Port” on page 55
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
Sun SPARC Enterprise T5120 and T5220 Servers Administration Guide
54 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Configure the Service Processor Network
Management Port
Note – If your network allows the use of DHCP, this configuration is performed
automatically the first time you boot the system.
Use this procedure only when:
You are unable to use DHCP on your network.
You need to modify the ILOM service processor network management port
settings.
In this procedure, you connect to the ILOM service processor using the serial management port to manually reconfigure the network management port.
Note – For more information on configuring ILOM, refer to the Oracle Integrated
Lights Out Manager 3.x Supplement for SPARC Enterprise T5120 and T5220 Servers.
Set these network parameters according to the specific details of your network configuration:
/SP/network state – Specifies whether the service processor is on the network
or not
/SP/network pendingipaddress – IP address of the service processor
/SP/network pendingipgateway – IP address of the gateway for the subnet
/SP/network pendingipnetmask – Netmask for the service processor subnet
/SP/network pendingipdiscovery - Specifies whether the service processor
uses DHCP or static IP address assignment
/SP/network commitpending - Commits the service processor to use the
pending settings
Configure these parameters with the set command. The usage is as follows:
set target property=value where /SP/network is the target and pendingipaddress=xxx.xxx.xxx.xxx, for example, is the property=value.
1. Configure the service processor using information from your network administrator.
Your choices are:
Powering On the System 55
dhcp - Set up the network connection with a dynamically created IP
configuration. If you choose to use a dynamically created IP address (use DHCP to retrieve the network setting), set pendingipdiscovery to dhcp.
-> set /SP/network pendingipdiscovery=dhcp Set 'pendingipdiscovery' to 'dhcp'
static - Set up the network connection with a static IP configuration. If you
choose to configure a static IP configuration. set the parameters
pendingipdiscovery, pendingipaddress, pendingipgateway, and pendingipnetmask as follows.
a. Set the service processor to accept a Static IP Address.
-> set /SP/network pendingipdiscovery=static Set 'pendingipdiscovery' to 'static'
b. Set the IP address for the service processor.
-> set /SP/network pendingipaddress=service-processor-IPaddr Set 'pendingipaddress' to 'service-processor-IPaddr'
c. Set the IP address for the service processor gateway.
-> set /SP/network pendingipgateway=gateway-IPaddr Set 'pendingipgateway' to 'gateway-IPaddr'
d. Set the netmask for the service processor.
-> set /SP/network pendingipnetmask=255.255.255.0 Set 'pendingipnetmask' to '255.255.255.0'
This example uses 255.255.255.0 to set the netmask. Your network environment subnet might require a different netmask. Use a netmask number most appropriate to your environment.
2. Use the show /SP/network command to verify that the parameters were set correctly.
The code example shows parameters that have been set to convert a service processor from a DHCP configuration to a static configuration.
-> show /SP/network /SP/network Targets: Properties: commitpending = (Cannot show property)
56 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
dhcp_server_ip = xxx.xxx.xxx.xxx ipaddress = xxx.xxx.xxx.xxx ipdiscovery = dhcp ipgateway = xxx.xxx.xxx.xxx ipnetmask = 255.255.252.0 macaddress = 00:14:4F:3F:8C:AF pendingipaddress = xxx.xxx.xxx.xxx pendingipdiscovery = static pendingipgateway = xxx.xxx.xxx.xxx pendingipnetmask = 255.255.255.0 state = enabled Commands: cd set show
->
Note – After setting the configuration parameters, you must enter the set
/SP/network commitpending=true command for the new values to take affect.
3. Commit the changes to the service processor network parameters.
-> set /SP/network commitpending=true Set 'commitpending' to 'true'
Note – You can run the show /SP/network command again (after performing the
set /SP/network commitpending=true command) to verify that the
parameters have been updated.
Related Information
“Log Into the Service Processor Using the Network Management Port” on page 58
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
Sun SPARC Enterprise T5120 and T5220 Servers Administration Guide
Powering On the System 57
Log Into the Service Processor Using the
Network Management Port
Note – You must configure the service processor parameters shown in “Configure
the Service Processor Network Management Port” on page 55 before you can use the
network management port.
Open an SSH session and connect to the service processor by specifying its
network address.
% ssh root@xx.xxx.xx.x ... Are you sure you want to continue connecting (yes/no)? yes ... Password: password (nothing displayed) Waiting for daemons to initialize...
Daemons ready
Sun(TM) Integrated Lights Out Manager
Version 2.0.0.0
Copyright 2007 Sun Microsystems, Inc. All rights reserved. Use is subject to license terms.
->
Related Information
“Perform a Normal System Initialization” on page 61
Using the Service Processor for Common Operations
The following topics are described in this section:
“Power On the System” on page 59
“Connect to the System Console” on page 60
“Perform a Normal System Initialization” on page 61
58 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Power On the System
1. Perform the following steps to verify that there are no faults:
a. Set the virtual keyswitch to diag mode so that POST will run in Service
mode.
-> set /SYS keyswitch_state=diag
b. To initiate the power-on sequence, type the start /SYS command.
An ILOM CLI alert message appears on the system console. This message indicates that the system has reset.
-> start /SYS Are you sure you want to start /SYS (y/n)? y Starting /SYS
->
c. Switch to the system console to view POST output.
-> start /SP/console Are you sure you want to start /SP/console (y/n)? y Serial console started. To stop, type #. . . .
Watch the POST output for possible fault messages. The following output is a sign that POST did not detect any faults:
. . . 2007-12-14 16:34:53.385 0:1:0>INFO: 2007-12-14 16:34:53.391 0:1:0> POST Passed all devices. 2007-12-14 16:34:53.399 0:1:0>POST: Return to VBSC. 2007-12-14 16:34:53.406 0:1:0>Master set ACK for vbsc runpost command and spin. ... SPARC Enterprise T5220, No Keyboard Copyright 2007 Sun Microsystems, Inc. All rights reserved. OpenBoot 4.27.x, 3968 MB memory available, Serial #74409918. Ethernet address 0:14:4f:6f:67:be, Host ID: 846f67be.
Powering On the System 59
{8} ok
2. Type the console escape sequence (by default #. (Hash-Period)) to return to the ILOM prompt.
3. Check the POST execution result with the following command:
-> show /SP/faultmgmt -level all
Note – Depending on the configuration of ILOM, POST variables, and whether
POST detected faults or not, the server might boot, or the system might remain at the ok prompt. If the system is at the ok prompt, type boot.
4. Use the set /SYS keyswitch_state=normal command to return the virtual keyswitch to Normal mode (default) so that the system can power on and start the boot process.
-> set /SYS keyswitch_state=normal
Related Information
“Connect to the System Console” on page 60
Connect to the System Console
Output from POST, OpenBoot, and the Solaris OS is displayed in the system console using the network console on the service processor.
Type the start /SP/console command.
Multiple users can be connected to the console, but only one can be attached.
-> start /SP/console Are you sure you want to start /SP/console (y/n)? y Serial console started. To stop, type #.
Note – For more information about POST output, refer to the SPARC Enterprise
T5120 and T5220 Servers Service Manual.
60 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Related Information
“Perform a Normal System Initialization” on page 61
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
Sun SPARC Enterprise T5120 and T5220 Servers Service Manual
Perform a Normal System
Initialization
1. Type the start /SYS command.
-> start /SYS
Are you sure you want to start /SYS (y/n)? y Starting /SYS
2. To initiate the power-on sequence, type the start /SP/console command.
You will see an ILOM CLI alert message on the system console. This message indicates that the system has reset.
-> start /SP/console
Are you sure you want to start /SP/console (y/n)? y Serial console started. To stop, type #.
The CPU and memory controllers initialize, and eventually OpenBoot initializes. After a number of system console messages, the ok prompt appears, or the system will boot into the Solaris OS.
Note – System behavior depends on how the auto-boot variable is set. See the
SPARC Enterprise T5120 and T5220 Servers Administration Guide for more information.
The following example output is a small section of the complete output.
0:1:0> 0:1:0>SPARC-Enterprise[TM] T5120/T5220 POST 4.27.x. 2007/12/11 18:55
...
0:1:0>Network Interface Unit Tests....Done
0:1:0>Functional CPU Tests....Done
Powering On the System 61
0:1:0>Extended Memory Tests....Done
2007-12-14 16:45:28.800 0:1:0>INFO: 2007-12-14 16:45:28.806 0:1:0> POST Passed all devices. 2007-12-14 16:45:28.816 0:1:0>POST: Return to VBSC. 2007-12-14 16:45:28.824 0:1:0>Master set ACK for vbsc runpost command and spin...
SPARC Enterprise T5220, No Keyboard Copyright 2007 Sun Microsystems, Inc. All rights reserved. OpenBoot 4.27.x, 3968 MB memory available, Serial #74409918. Ethernet address 0:14:4f:6f:67:be, Host ID: 846f67be.
{0} ok
Related Information
“Devices in the OpenBoot Device Tree” on page 62
Integrated Lights Out Manager (ILOM) 2.0 Documentation
Integrated Lights Out Manager (ILOM) 2.0 Supplement for SPARC Enterprise T5120
and T5220 Servers
Integrated Lights Out Manager (ILOM) 3.0 Documentation
Integrated Lights Out Manager (ILOM) 3.0 Supplement for SPARC Enterprise T5120
and T5220 Servers
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
Sun SPARC Enterprise T5120 and T5220 Servers Administration Guide
Devices in the OpenBoot Device Tree
Some OpenBoot device tree path names are shown below:
TABLE: Disk Slot Numbers, Logical Device Names, and Physical Device Names
Disk Slot Number Logical Device Name
Slot 0 c1t0d0 /devices/pci@0/pci@0/pci@2/scsi@0/sd@0,0
Slot 1 c1t1d0 /devices/pci@0/pci@0/pci@2/scsi@0/sd@1,0
Slot 2 c1t2d0 /devices/pci@0/pci@0/pci@2/scsi@0/sd@2,0
Slot 3 c1t3d0 /devices/pci@0/pci@0/pci@2/scsi@0/sd@3,0
*
Physical Device Name
62 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
* The logical device names might appear differently on your system, depending on the number and type of add-on disk controllers in-
stalled.
TABLE:
Device Identifiers Devices
Device Identifiers and Devices
/SYS/MB/CMPcpu_number/Pstrand_number CPU strand (Number: 0-63)
/SYS/MB/RISERriser_number/PCIEslot_number PCIe slot (Number: 0-5)
/SYS/MB/RISERriser_number/XAUIcard_number XAUI card (Number: 0-1)
/SYS/MB/GBEcontroller_number GBE controllers (0-1)
GBE0 controls NET0 and NET1
GBE1 controls NET2 and NET3
/SYS/MB/PCIE PCIe root complex
/SYS/MB/USBnumber USB ports (Number: 0-1, located on
rear of chassis)
/SYS/MB/CMP0/L2_BANKnumber (Number: 0-3)
/SYS/DVD DVD
/SYS/USBBD/USBnumber USB ports (Number: 2-3, located on
front of chassis)
/SYS/TTYA DB9 serial port
/SYS/MB/CMP0/BRbranch_number/CHchannel_number/Ddimm_number Branch (0-1) Channel (0-1) DIMM
(0-3)
Related Information
“Boot the Solaris Operating System” on page 64
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
Sun SPARC Enterprise T5120 and T5220 Servers Administration Guide
Powering On the System 63
Boot the Solaris Operating System
The Solaris OS is preinstalled on the servers on the disk in slot 0. The Solaris OS is not configured (that is, the sys-unconfig command was run in the factory). If you boot the system from this disk, you will be prompted to configure the Solaris OS for your environment.
To boot the Solaris OS, complete these steps:
1. At the ok prompt, boot from the disk that contains the Solaris OS.
If you know which disk to boot from, skip this step and perform Step 2.
If you need to determine which disk to boot from, type the show-disks
command at the ok prompt to see the path to the configured disks, similar to the following:
ok show-disks a) /pci@7c0/pci@0/pci@2/pci@0,2/LSILogic,sas@4/disk q) NO SELECTION Enter Selection, q to quit: q ok
2. Type the boot command at the ok prompt.
Use the value from Step 1 to construct the boot command. You must append the target to the disk path.
In the following example, the server is booted from disk 0 (zero) on a SPARC Enterprise T5120 server.
ok boot disk0 Boot device: /pci@7c0/pci@0/pci@8/scsi@2/disk@0,0 File and args: Notice: Unimplemented procedure 'encode-unit' in /pci@7c0/pci@0/pci@2/pci@0/LSILogic,sas@4 Loading ufs-file-system package 1.4 04 Aug 1995 13:02:54. FCode UFS Reader 1.12 00/07/17 15:48:16. Loading: /platform/SUNW,T5120/ufsboot Loading: /platform/sun4v/ufsboot
....................
Hostname: hostname The system is coming up. Please wait. NIS domain name is x.x.x.x starting rpc services: rpcbind keyserv ypbind done. Setting netmask of lo0 to 255.0.0.0 Setting netmask of bge0 to 255.255.255.0
64 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Setting default IPv4 interface for multicast: add net 224.0/4: gateway xxxx syslog service starting. volume management starting. Creating new rsa public/private host key pair Creating new dsa public/private host key pair The system is ready. hostname console login:
Related Information
“Avoid Booting the Solaris Operating System at Startup” on page 65
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
Sun SPARC Enterprise T5120 and T5220 Servers Administration Guide
Avoid Booting the Solaris Operating
System at Startup
In hard drive HDD0, the Solaris OS is preinstalled.
If you do not want to start the preinstalled OS, set the Open Boot PROM
parameter auto-boot? to false. For example:
-> set /HOST/bootmode script="setenv auto-boot? false"
Related Information
“Reset the System” on page 65
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
Sun SPARC Enterprise T5120 and T5220 Servers Administration Guide
Reset the System
1. If it is necessary to reset the system, use the shutdown -g0 -i6 -y command
# shutdown -g0 -i6 -y
Powering On the System 65
2. It is not necessary to power the system off and on to simply reset the system.
Related Information
“Power Cycle the System” on page 66
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
Sun SPARC Enterprise T5120 and T5220 Servers Administration Guide
Power Cycle the System
If a simple reset does not clear a system problem, you can power the system off and on with this procedure.
1. Shut down the Solaris OS.
At the Solaris OS prompt, type the shutdown -g0 -i0 -y command. Then type o when prompted to halt the Solaris OS and to return to the ok prompt.
# shutdown -g0 -i0 -y # svc.startd: The system is coming down. Please wait. svc.startd: 91 system services are now being stopped. Jun 12 19:46:57 wgs40-58 syslogd: going down on signal 15 svc.startd: The system is down. syncing file systems... done Program terminated r)eboot, o)k prompt, h)alt?
2. Switch from the system console prompt to the service processor console prompt by typing the console escape sequence (by default, #. [Hash-Period]).
ok #.
->
3. Using the ILOM CLI, type the stop /SYS command to perform a graceful shutdown of the system.
-> stop /SYS Are you sure you want to stop /SYS (y/n)? y Stopping /SYS
->
66 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Note – To perform an immediate and ungraceful shutdown, use the stop -force
-script /SYS or stop -script /SYS commands. These commands stop
everything immediately, so ensure that all data is saved before entering these commands.
4. Type the start /SYS command.
-> start /SYS Are you sure you want to start /SYS (y/n)? y Starting /SYS
->
Note – To force a power-on sequence, use the start -script /SYS command.
5. Reconnect to the system console with the start /SP/console command.
-> start /SP/console Are you sure you want to start /SP/console (y/n)? y Serial console started. To stop, type #.
The systems displays various messages, followed by the ok prompt.
Related Information
“Verifying System Functionality” on page 67
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
Sun SPARC Enterprise T5120 and T5220 Servers Administration Guide
Verifying System Functionality
After powering on the system for the first time, you can use the Sun Validation Test Suite (Sun VTS) software to verify the functionality and performance of any installed components, as well as its network connections.
Related Information
SunVTS Documentation
Powering On the System 67
68 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Updating the Firmware
This topic provides instructions for updating SP firmware. It contains the following sections:
flashupdate command” on page 69
“Update the Firmware” on page 70
flashupdate command
The flashupdate command updates both the service processor firmware and the server firmware.
The flash image consists of the following components:
Service processor firmware
OpenBoot PROM
POST
Reset/config
Sequencer
Partition description
Related Information
“Update the Firmware” on page 70
69
Update the Firmware
1. Ensure that the ILOM service processor network management port is configured.
This configuration is required to access the new flash image over the network. See
“Configure the Service Processor Network Management Port” on page 55.
2. Open an SSH session to connect to the service processor.
% ssh root@xx.xxx.xx.x ... Are you sure you want to continue connecting (yes/no)? yes ... Password: password (nothing displayed) Waiting for daemons to initialize...
Daemons ready
Sun(TM) Integrated Lights Out Manager
Version 2.0.0.0
Copyright 2007 Sun Microsystems, Inc. All rights reserved. Use is subject to license terms.
->
3. Verify that the host is powered off.
If the host is not powered off, type the stop /SYS command.
-> stop /SYS
4. Verify that the keyswitch_state parameter is set to normal.
-> set /SYS keyswitch_state=normal
5. Type the load command.
The load command updates the service processor flash image and the host firmware. The load command requires the following information:
IP address of a TFTP server on the network that can access the flash image
70 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Full path name to the flash image that the IP address can access
The command usage is as follows:
load [-script] -source tftp://xxx.xxx.xx.xx/pathname
where:
-script – Does not prompt for confirmation and acts as if yes was specified
-source – Specifies the IP address and full path name (URL) to the flash image
-> load -source tftp://xxx.xxx.xx.xx/pathname NOTE: A firmware upgrade will cause the server and ILOM to be reset. It is recommended that a clean shutdown of the server be done prior to the upgrade procedure. An upgrade takes about 6 minutes to complete. ILOM will enter a special mode to load new firmware. No other tasks can be performed in ILOM until the firmware upgrade is complete and ILOM is reset.
Are you sure you want to load the specified file (y/n)? y Do you want to preserve the configuration (y/n)? y
...............................................................
Firmware update is complete. ILOM will now be restarted with the new firmware. Update complete. Reset device to use new image.
->
After the flash image has been updated, the system automatically resets.
The service processor resets, runs diagnostics, and returns to the login prompt (on the serial console), similar to this code example:
U-Boot 1.1.1 (May 23 2007 - 21:30:12) ... POST cpu PASSED POST ethernet PASSED Hit any key to stop autoboot: 0 ## Booting image at fe080000 ...
IP Protocols: ICMP, UDP, TCP, IGMP
Checking all file systems... fsck 1.37 (21-Mar-2005) Setting kernel variables ... ... done. Mounting local filesystems... Cleaning /tmp /var/run /var/lock.
Updating the Firmware 71
Identifying DOC Device Type(G3/G4/H3) ... OK
Configuring network interfaces...Internet Systems Consortium DHCP Client V3.0.1 Copyright 2007 Internet Systems Consortium. All rights reserved. For info, please visit http://www.isc.org/products/DHCP
eth0: config: auto-negotiation on, 100FDX, 100HDX, 10FDX, 10HDX. Listening on LPF/eth0/00:14:4f:3f:8c:af Sending on LPF/eth0/00:14:4f:3f:8c:af Sending on Socket/fallback DHCPDISCOVER on eth0 to 255.255.255.255 port 67 interval 6 eth0: link up, 100 Mbps Full Duplex, auto-negotiation complete. DHCPDISCOVER on eth0 to 255.255.255.255 port 67 interval 15 Hostname: hostname. Starting portmap daemon: portmap. Initializing random number generator...done. INIT: Entering runlevel: 3 Starting system log daemon: syslogd and klogd. Starting periodic command scheduler: cron.
Starting IPMI Stack...... Done.
Starting OpenBSD Secure Shell server: sshd. Starting Servicetags listener: stlistener. Starting FRU update program: frutool.
hostname login:
Related Information
“Configure the Service Processor Network Management Port” on page 55
72 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Selecting a Boot Device
This section provides instructions on selecting a boot device:
“Selecting a Boot Device” on page 73
Related Information
“Selecting a Boot Device” on page 73
“To Select a Boot Device” on page 74
Selecting a Boot Device
You specify the boot device by setting an OpenBoot configuration variable called boot-device. The default setting of this variable is disk net. Because of this setting, the firmware first attempts to boot from the system hard drive, and if that fails, from the on-board NET0 Gigabit Ethernet interface.
This procedure assumes that you are familiar with the OpenBoot firmware and that you know how to enter the OpenBoot environment. For more information, see the SPARC Enterprise T5120 and T5220 Servers Administration Guide.
Note – The serial management port on the ILOM card is preconfigured as the default
system console port. For more information, see the SPARC Enterprise T5120 and T5220 Servers Adminstration Guide.
If you want to boot from a network, you must connect the network interface to the network.
73
To Select a Boot Device
At the ok prompt, type:
ok setenv boot-device device-specifier
where the device-specifier is one of the following:
cdrom – Specifies the DVD drive
disk – Specifies the system boot disk (internal disk 0 by default)
disk0 – Specifies internal drive 0
disk1 – Specifies internal drive 1
disk2 – Specifies internal drive 2
disk3 – Specifies internal drive 3
net, net0, net1, net2, net3 – Specifies the network interfaces
full path name – Specifies the device or network interface by its full path name
Note – The Solaris OS modifies the boot-device variable to its full path name, not
the alias name. If you choose a nondefault boot-device variable, the Solaris OS specifies the full device path of the boot device.
Note – You can specify the name of the program to be booted as well as the way the
boot program operates. For more information, refer to the OpenBoot 4.x Command Reference Manual for your specific Oracle Solaris OS release. This document is
available at: (http://www.sun.com/documentation)
If you want to specify a network interface other than an on-board Ethernet interface as the default boot device, you can determine the full path name of each interface by typing either of the following commands:
ok show-devs ok show-nets
The show-devs command lists the system devices and displays the full path name of each PCI device.
Related Information
OpenBoot Documentation
OpenBoot 4.x Command Reference Manual
74 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Installing the Servers With the Express Rail Rackmounting Kit
This section provides instructions for installing the servers in an equipment rack with express (snap-in) rails. The express rail rackmounting kit installs quickly, and does not require mounting screws or nuts. The kit and the installation procedures are the same for both the SPARC Enterprise T5120 and T5220 servers.
Note – If your rackmounting kit came with its own instructions, use the instructions
in your rackmounting kit instead of the instructions in this section. After performing the server installation, proceed to “Powering On the System” on page 45 for first-time power on.
Note – The procedures in this section are the same for both the 1U and 2U servers.
The illustrations show a 2U server only as an example.
Note – References to left and right are from your viewpoint as you face either the
front or the rear of the system.
This chapter contains the following sections:
“Slide Rail Assembly Notes for the Express Rail Rackmounting Kit” on page 76
“Installing the Servers in a Rack With Express Rails” on page 78
“Installing the Cable Management Arm” on page 86
“Dismounting the Server” on page 86
Related Information
“Installing the Servers in a Rack” on page 21
75
Slide Rail Assembly Notes for the Express Rail Rackmounting Kit
The express rail rackmounting kit has two slide rail assemblies. A slide rail assembly can be installed on either the right or left side of the rack.
Each slide rail assembly consists of a three-section slide rail and a removable mounting bracket.
FIGURE: Sections of the Express Rail Slide Rail Assembly
Figure Legend
1 Mounting bracket
2 Front section
3 Middle section
4 Rear section
The front, middle, and rear sections form the slide rail. The middle and rear sections
have holes for mounting and adjust to fit rack depths from 24 in. (61 cm) to 36.5 in. (93 cm). The front section can be extended to allow movement of the server out of the rack.
76 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
The removable mounting bracket slides 14.5 in. (37 cm) out of the slide rail, then
locks in place. If you unlock the mounting bracket at this point, it slides an additional 14.5 in. (37 cm) before separating from the slide rail. You can then mount the mounting bracket to the right or left side of the server chassis.
Note that there are six locks in a slide rail assembly. Four are on the mounting
bracket. Two locks are on the slide rail.
FIGURE: Locating the Locks on the Slide Rail Assembly for the SPARC Enterprise T5220
Server
Installing the Servers With the Express Rail Rackmounting Kit 77
Related Information
“Installing the Servers in a Rack With Express Rails” on page 78
Installing the Servers in a Rack With Express Rails
Note – Ensure that you have all of the parts in the rackmounting kit before you
begin installation.
The rackmounting kit contains two slide rail assemblies, which can be installed on either the right or left side of the rack.
A slide rail assembly consists of two parts, a slide rail and a removable mounting bracket. The slide rail attaches to the rack posts. The mounting bracket attaches to the server chassis.
This topic contains the following tasks:
“Install the Slide Rail Assemblies” on page 78
“Insert and Lock the Server in the Rack” on page 83
Related Information
“Install the Slide Rail Assemblies” on page 78
Install the Slide Rail Assemblies
1. Pull both mounting brackets completely out of their respective slide rails.
a. Simultaneously press and hold the upper and lower lock buttons of the slide
rail lock.
78 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
FIGURE: Unlocking the Express Rail Slide Rail Assembly
b. Pull the mounting bracket out until it stops.
c. Slide the mounting bracket release button to the left, then slide the mounting
bracket completely out of the slide rail.
Installing the Servers With the Express Rail Rackmounting Kit 79
FIGURE: Express Rail Mounting Bracket Release Button
2. Attach a mounting bracket to the right side of the server chassis.
a. Position the mounting bracket against the chassis. Ensure that the slide rail
lock is at the front and the keyed openings on the mounting bracket are aligned with the locating pins on the side of the chassis.
80 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
FIGURE: Attaching an Express Rail Mounting Bracket to the Chassis
b. Ensure that the heads of the four locating pins protrude through the keyed
openings in the mounting bracket. Slide the mounting bracket toward the front of the chassis until the bracket locks into place with an audible click.
c. Verify that all four locating pins are trapped in the keyed openings and that
the third locating pin from the front has engaged the mounting bracket lock.
3. Attach the second mounting bracket to the left side of the server chassis.
4. Orient slide rails, ensuring that the ball bearing tracks (labeled FRONT) are forward.
Installing the Servers With the Express Rail Rackmounting Kit 81
FIGURE: Express Rail Slide Rails Orientation for Installation
5. Extend the slide rails (outer section) to fit the rack and attach the slide rails to the rack.
You hear an audible click when the rails securely attach to the rack.
82 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
FIGURE: Attaching Express Slide Rails to the Rack
Caution – Deploy the antitilt feature on the rack before continuing the installation.
Related Information
“Insert and Lock the Server in the Rack” on page 83
Insert and Lock the Server in the Rack
1. Deploy the antitilt feature, if the rack is so equipped.
Caution – The weight of the servers on extended slide rails can be enough to
overturn an equipment rack.
Caution – The 2U server weighs approximately 55 lb (25 kg). Two people are
required to lift and mount the server into a rack enclosure when using the procedures in this chapter.
Installing the Servers With the Express Rail Rackmounting Kit 83
2. Insert the ends of the mounting brackets into the sliding rails.
3. Slide the server approximately halfway into the chassis.
FIGURE: Inserting Express Rail Mounting Brackets Into the Slide Rails
4. Slide the green release tab.
5. Push the server all the way into the rack until it locks into place.
84 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
FIGURE: Sliding the Express Rail Release Tab and Securing the Server in the Rack
Caution – Before continuing, verify that the server is securely mounted in the rack
and that the slide rails are locked in the mounting brackets.
Related Information
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
SPARC Enterprise T5120 Server Getting Started Guide
SPARC Enterprise T5220 Server Getting Started Guide
SPARC Enterprise T5120 Server Getting Started Guide (DC)
SPARC Enterprise T5220 Server Getting Started Guide (DC)
Installing the Servers With the Express Rail Rackmounting Kit 85
Installing the Cable Management Arm
The rackmounting kit for each server comes with the same cable management arm (CMA) assembly. The CMA installation procedures are the same for both servers.
See “Installing the Cable Management Arm for Both Servers” on page 30.
Related Information
“Installing the Cable Management Arm for Both Servers” on page 30
“Connecting the Server Cables for Both Servers” on page 37
“Managing Cables With the CMA” on page 42
Dismounting the Server
Caution – To prevent damage to your server, do not move the rack while the server
is mounted.
To install or replace internal parts in the server, you must first remove the server from the rack. For the removal procedure, refer to the SPARC Enterprise T5120 and T5220 Servers Service Manual.
Related Information
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
Sun SPARC Enterprise T5120 and T5220 Servers Service Manual
86 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Assembling and Installing DC Power Cables for the Sun SPARC Enterprise T5120 Server
This section provides the following DC input power information for the Sun SPARC Enterprise T5120 server.
Note – The procedures in this section are only for the Sun SPARC Enterprise T5120
server. Do not use this section for assembling the DC power cables for the Sun SPARC Enterprise T5220 server.
“Requirements for Servers With DC Input Power” on page 87
“DC Supply and Ground Conductor Requirements” on page 88
“Overcurrent Protection Requirements” on page 89
“Assembling and Installing the DC Input Power Cables” on page 89
“Connecting the DC Input Power Cords to the Server” on page 98
Requirements for Servers With DC Input Power
The following restrictions apply to the Sun SPARC Enterprise T5120 server with DC input power:
The DC version of the server must be installed in a restricted-access location.
According to the intent of the National Electrical Code, a restricted-access location is an area intended for qualified or trained personnel only and has access controlled by a locking mechanism, such as a key lock or an access card system.
The server must not be directly connected to centralized DC mains.
87
Related Information
“DC Supply and Ground Conductor Requirements” on page 88
DC Supply and Ground Conductor Requirements
The server must meet the following:
Suitable conductor material: use copper conductors only
Power supply connections through the input connector: 12 AWG (between the
server and the source). There are three conductors:
-48V or -60V (negative terminal)
Chassis ground connection
-48V or -60V Return (positive terminal)
System ground conductor: 12 AWG (to be connected to the chassis)
Cable insulation rating: Minimum of 75˚C (167˚F), low smoke fume (LSF), flame
retardant
Provide a Wago Type 721-103/037-000 mating connector for proper connection to
the DC connectors supplied with the server (Wago Type 721).
Branch circuit cable insulation color: Per applicable National Electrical Codes
Grounding cable insulation color: Green/Yellow
DC power source must meet TNV-2 requirements as defined by UL 60950-1 and
IEC 60950-1
Note – Depending on the DC power source, the -48V or -60V (negative terminal)
might be marked with a minus (-) symbol, and the -48V or -60V Return (positive terminal) might be marked with a positive (+) symbol.
When attaching DC cables, keep the following requirement in mind:
Caution – You must restrict the connection of the server to the DC power source to
minimize the possibility that transient energy will appear on the main input to the equipment. The DC battery power source must be in the same premises as the server. The server cannot be in one building with the power source in another building.
88 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Related Information
“Overcurrent Protection Requirements” on page 89
Overcurrent Protection Requirements
Overcurrent protection devices must be provided as part of each equipment rack.
Circuit breakers must be located between the DC power source and the server. Use
one 20 A fast-trip double-pole DC-rated circuit breaker for each power supply unit.
Note – Overcurrent protection devices must meet applicable national and local
electrical safety codes and be approved for the intended application.
Related Information
“Assembling and Installing the DC Input Power Cables” on page 89
Assembling and Installing the DC Input Power Cables
The following procedure describes how to assemble the DC input power cables for the Sun SPARC Enterprise T5120 server.
Assemble one cable for each DC power supply in your server.
Assembling and Installing DC Power Cables for the Sun SPARC Enterprise T5120 Server 89
Before you begin the installation procedure, verify that the required conditions described in the following table have been satisfied.
TABLE: Prerequisites Not Covered by the DC Cable Installation Procedure
Prerequisite Condition Responsible Party
Install a DC power source that meets the server’s input power specifications.
Secure DC power cables that meet the server’s power cabling specifications.
Attach the DC input plug to the DC input power cables. The input plug is provided in the server’s shipping kit.
Customer
Customer
Customer
This topic contains the following tasks:
“Assemble the DC Input Power Cables” on page 90
“Install the Strain Relief Housings” on page 95
Assemble the DC Input Power Cables
1. Turn off power from the DC power source using the circuit breakers.
Caution – Do not proceed with these instructions until you have turned off the
power from the DC power source through the circuit breakers.
2. Identify the parts that you will use to assemble the DC input power cables
For each cable, you need the three parts shown in the figure below. These items are provided in the shipping kit that came with your server.
90 SPARC Enterprise T5120 and T5220 Servers Installation Guide • October 2010
Loading...