SunModo TopTile Installation Manual

TopTile System
1 of 8
SunModo Corp | 14800 NE 65th Street | Vancouver, WA 98682 | 360-844-0048
Document Number D10261-V1.2 | ©2023 – SunModo Corp.
TopTile System
2 of 8
SunModo’s innovative TopTile® is the world’s first PV mounting system that
is mounted entirely above the tiles. The patented mount eliminates the need to deconstruct the tile roof, significantly reduces time, and minimizes tile breakage during installation.
The TopTile® product attaches to both curved and flat tiles, and to a wide variety of roof coverings. The TopTile® Mount can be installed on, but not limited to, the following roof coverings: aluminum and steel metal shingles, stone coated metal shingles, terra cotta tile, hollow tile, slate tile, concrete, and clay tiles as well as plastic composites shingles and synthetic Spanish barrel tiles.
TopTile System
3 of 8
Tools Required for Installation
Drill Adjustable Torque Wrench, 0 – 35 Nm
Tape measure
Chalk line or laser
Male hex drive impact socket adapter
13mm (1/2”) 6-point Socket
28mm (1-1/8”) 6-point Socket
SHDIATOOL Diamond Core Drill Bits 1-1/2” or 2for Hard Stone Concrete Marble Granite Brick Laser Welded Dry or Wet Hole Saws 50mm
TopTile System
4 of 8
SHDIATOOL Core Drill Bit Adapter 5/8"-11 Thread Male to SDS Plus Shank
T25 Torx/Star Bit
Dow Great Stuff FireBlock Polyurethane Spray Foam, (or equivalent)
POLYSET® RTA-1 Roof Tile Adhesive and Caulking
Please refer to the Florida Product Approval (FPA) FL41592-R1 for sealant applications in Florida.
TopTile System
5 of 8
TopTile Installation Instructions
Tile Hole
Underlayment Foam Application
Stanchion Installation
Locate the desired location of the TopTile. Using a 1-1/2” or 2” tile hole saw, drill a hole into the tile.
Remove the tile dust from around the hole and the tile dust on the underlayment.
Install the Stanchion using a 38mm Socket. Torque until the stanchion and gasket are fully seated.
After clearing away the tile dust on the underlayment, spray a 4” to 6” circular bead of
polyurethane foam sealant onto the
underlayment.
We recommend POLYSET® RTA-1 Roof Tile Adhesive, or Great Stuff FireBlock, or any polyurethane spray foam approved in your jurisdiction is acceptable.
Please refer to the Florida Product Approval (FPA)
FL41592-R1 for sealant applications in
Florida.
TopTile System
6 of 8
TopTile “Correct” Installation
TopTile “Acceptable” Installation
TopTile “Incorrect” Installation
The 3 wood screw stanchion holes are above the tile and below the collar of the EPDM cover on the Flashing.
Note: Repositioning the stanchion higher or lower along the tile will increase or decrease the position of the 3 wood screw stanchion holes.
The 3 wood screw stanchion holes are above the tile, and also above the collar of the EPDM cover on the Flashing. POLYSET® RTA-1 Roof Tile Adhesive spray foam can be used to prevent water infiltration.
The 3 wood screw stanchion holes are below the tile profile. In this position the wood screws cannot be installed.
In this situation we recommend adding a 1” Spacer to the
stanchion.
If required add a 1” Spacer to the bottom of the stanchion. Remove the EPDM Washer, install the 1” Spacer, and
replace the EPDM Washer with the rubber gasket facing down.
TopTile System
7 of 8
Deck Screw Installation
Stanchion Sealing
Flashing Installation
For curved tiled roofs hand form the flashing to
match the tile contour. Install flashing over
Stanchion and under the edge of the tile located above.
If the leading-edge tile cannot be lifted, flashing can be placed below but a bead of roof sealant must be used to help deflect water around or over the top of the flashing.
Install the 3 wood screws into the stanchion
using a T25 Torx/Star Bit.
Due to the side driving force of installing the screws into the sides of the stanchion, care should be taken to keep the stanchion plumb.
Spray a circular bead of POLYSET® RTA-1 Roof Tile Adhesive around the hole and the Stanchion to create a watertight seal.
TopTile System
8 of 8
L-Foot Attachment
Rail Attachment
Loosely install the L-Foot Adaptor to the L-Foot using the M8 Bolt provided.
Install the Rail onto the L-Foot and L-Foot Adaptor. Confirm that the hooks on the L-Foot Adaptor are fully engaged with the hooks on the side of the Rail.
Adjust the Rail to the desired height and then secure the Rail to the L-Foot Adaptor using the M8 Bolt; use a 13mm (1/2”) hex socket and torque to 13Nm (10 ft-lbs).
Install the L-Foot with its M8 Bolt onto the top of the stanchion; use a 13mm (1/2”) hex socket and torque to 13Nm (10 ft-lbs).
Loading...