Sub Zero 7030447 Installation

Undercounter Dual Installation
subzero.com 800.222.7820
Contents
DUAL INSTALLATION
3 Clip, Trim
7 Screw, #10 x ¾
2 Tape
1 Bracket, Top
1 Bracket, Bottom
1 Trim, Center
1 Heater
1 Wire, Ground
1 Instructions
IMPORTANT NOTE: For outdoor units only. Use a power drill
to remove the 3 rivets that secure the trim to the handle side of each unit then discard trim. Refer to the illustration below.
Installation
1 Remove the paper backing from the tape on the back
of the heater.
3 Clip the ground wire to the bottom of the heater then
attach the ground wire to the unit using the ground screw. Refer to the illustration below.
4 Position the wires from the heater through the opening
in the unit tray then install the plastic bushing. Refer to the illustration below.
5 Attach the male plug from the heater into the female plug
supplied with the unit.
6 Use 4 screws provided to install the top bracket.
GROUND SCREW
BUSHING
2 Place heater panel approximately ¼" from the back of
the unit being installed on the right, then press firmly to secure. See illustration below.
RIVET
TRIM
Remove trim (UC-24RO only.) Install heater.
Install top bracket.Install bushing.
7 Use 2 screws to install the bottom bracket.
8 Install (3) trim clips on center trim, then place the trim
between both units and press to install.
Install bottom bracket.
Install center trim.
7030942 REV-A 03/2014
page 1 of 1
Loading...