Stübbe PTM C2 Series Original Operating Manual

Sensor pressure
Original operating manual Series
PTM C2
Version BA-2016.11.24 EN Print-No. 300 196
TR MA DE Rev002
We reserve the right to make t
echnical changes.
Read carefully before use. Save for future use.
Table of contents
Table of contents
1 About this document ............................... 3
1.1 Target groups ............................. .... 3
1.2 Other applicable documents ................ 3
1.3 Warnings and symbols ....................... 3
2 General safety instructions ....................... 4
2.1 Intended use ........ .......................... 4
2.2 General safety instructions .................. 4
2.2.1 Obligations of the operating company .. . . .. 4
2.2.2 Obligations of personnel ...... ............... 4
2.3 Specic hazards .......................... .... 4
2.3.1 Hazardous media ............................ 4
3 Layout and Function ............................... 5
3.1 Type plate .............. ....................... 5
3.2 Description .................................... 5
3.3 Layout ............................ ............. 5
3.3.1 Layout ............................ ............. 5
4 Transport, Storage and Disposal ....... .......... 5
4.1 Unpacking and inspection on delivery .. .. . . 5
4.2 Transportation ................................ 5
4.3 Storage ..... .................................. 5
4.4 Disposal .................. ..................... 6
5 Installation and connection ....................... 6
5.1 Check operating conditions ................. 6
5.2 Installing device in the process
pipework .................................... .. 6
5.3 Performing the hydrostatic test .............. 6
5.4 Electrical connection of device .............. 6
6Operation . ........................................... 7
6.1 Initial start-up ............ ..................... 7
7 Maintenance .... ..................................... 7
7.1 Servicing ...................................... 7
7.2 Maintenance ................ .................. 7
7.2.1 Removing the device ........................ 7
7.2.2 Replacement parts and return .............. 7
8 Troubleshooting .................................. .. 8
9 Appendix ................... .......................... 8
9.1 Technical specications .................. .... 8
9.2 Dimensions ................................... 8
9.3 Plug assignment ........... .................. 8
List of gures
Fig. 1 Type plate .............. ....................... 5
Fig. 2 Layout ............................ ............. 5
Fig. 3 Connection diagram ......................... 8
List of tables
Tab. 1 Other application documents, purp ose and
where found ........... ....................... 3
Tab. 2 Warnings and symbols ....................... 3
Tab. 3 Servicing activities ........................... 7
Tab. 4 Troubleshooting .................... .......... 8
2 PTM C2 BA-2016.11.24 EN 300 196
About this document
1 About this document
This manual
is part of the equipment
appli es to all series referred to
describes safe and proper operation duri ng all operating phases
1.1 Target groups
Operating company
Re s ponsibilities: – Always keep this man ual accessible where the device
is used on the system.
– Ensure that employees read and observe this docu-
ment, particularly the safety instructions and warnings, and the documents which also apply.
– Observe any additional country-specic rules and reg-
ulations that relate to the system.
Qualied personnel, tter
Mechanics qualication: – Qualied employees with additional training for tting
the respective pipework.
Electrical qualication: – Qualied electrician
Transport qualication: – Qualied transport specialist
Re s ponsibility: – Read, observe and follow this manual and the other
applicable documents, especially all safety instructions and warnings.
1.2 Other applicable documents
To download:
Resistance Guide
Chemical resistance of the materials used
www.asv-stuebbe.de/pdf_resistance/300051.pdf
To download:
Data sheet
Technical data, operating conditions
www.asv-stuebbe.de/pdf_datasheets/300190.pdf
To download:
CE declaration of conformity
Conformity with standards
www.asv-stuebbe.de/pdf_DOC/300298.pdf
Tab. 1 Other application documents, purpose
and where found
1.3 Warnings and symbols
Symbol
Meaning
Immediate acute risk
De ath, serious bodily harm
Potentially acute risk
De ath, serious bodily harm
Potentially hazardous situation
Minor in jury
Potentially hazardous situation
Material damage Safety warning sign
Take note of all information highlighted by the safety warning sign and follow the instructions to avoid injury or death.
Instruction
1. , 2. , … Multiple-step
instructions
Precondi
tion
Cross reference Information, notes
Tab. 2 Warnings and symbols
300 196 BA-2016.11.24 EN PTM C2 3
General safety instructions
2 General safety instructions
The manufacturer accepts no liability for damages caused by disregarding any of the documentation.
2.1 Intended use
Thedeviceallowspressureinaliquidmediumtobemeasured.
Devic e must only be used for measuring pressure in liquid media.
Only use the device with suitable media (resistance lists).
Adh ere t o t he operating limits (9.1 Technical specica-
tions, Page 8).
2.2 General safety instructions
Observe the foll owi ng regulations b efore carrying out any work.
2.2.1 Obligations of the operating company
Safety-conscious operation
Only operate the device if it is in perfect technical condition and only use it as intended, staying aware of safety and risks, and in adherence to the instructions in this manual.
Ensure that the following safety aspects are observed and monitored: – Intended use – Statutory or other safety and accident-prevention reg-
ulations
– Safety regulations governing the handling of haz-
ardous substances
– Applicable standards and guidelines in the country
where the pump is operated
Make personal protective equipment available.
Qualied personnel
Make sure all personnel tasked with work on the device have read and understood this manual and all other appli­cable documents, especially the safety, maintenance and repair information, before they start any work.
Organize responsibilities, are as of competence and the supervision of personnel.
The following work should be carried out by specialist tech­nicians only: – Installation, repair and maintenance work – Work on the electrical system
Make sure that trainee personnel only work on the device under supervision of s pecialist technicians.
2.2.2 Obligations of personnel
Only complete work on the device if the following requirements are met:
System is empty
System has been ushe d
System is depressurized
System has cooled down
System is secured against being switched back on again
Do not make any modications to the device.
2.3 Specic hazards
2.3.1 Hazardous media
When handling hazardous media, observe the safety reg­ulations for the handling of hazardous substances.
Use personal protective equipment for all work on the device.
Collect leaking pumpe d liquid and residues in a safe man­ner and dispose of in accordance with environmental reg­ulations.
4 PTM C2 BA-2016.11.24 EN 300 1 96
Transport, Storage and Disposal
3 Layout and Function
3.1 Type plate
P T M C2 D r u ck sensor
M ess b e r e i c h 0 - 10 b a r
18 - 30 V D C
I d . N o .
140557
A n sc h l u s s PP DN 2 5 M a t e r i a l P P
EP D M
1304-05371
1
2
3 4
5
6
4-20mA 2-Leiter
Fig. 1 Type plate
1Devicetype
2 Pressure measurement range
3 Output
4 Connection (material and nominal diameter)
5 Gasket material
6 ID number
Device types
PTM C2 – Standard, current output
3.2 Description
The device measures the pressure of a liquid medium. It trans­mits the measured v al ue via a current output.
3.3 Layout
3.3.1 Layout
2
3
1
Fig. 2 Layout
1 Plug connector
2 Sensor housing
3 Process connection
4 Transport, Storage and
Disposal
4.1 Unpacking and inspection on delivery
1. Unpack the device when received and inspect it for trans­port damage and completeness.
2. Check that the information on the type plate agrees with the orde r /design d ata.
3. Report any transport damage to the manufacturer immedi­ately.
4. If tted immediately: D ispo se of packaging material according to local regulations. –Iffitted at a later point: leave device in its original pack-
aging.
4.2 Transportation
Device should preferably be transported in the original packaging.
4.3 Storage
NOTE
Material damage due to inappropriate storage!
Store the device properly.
1. Make sure the storage room meets the following condi­tions: –Dry – Frost-free – Vibration-free – Not in direct sunlight – Storage temperature +10 °C to +60 °C
2. Device should preferably be stored in the original packag­ing.
300 196 BA-2016.11.24 EN PTM C2 5
Installation and connection
4.4 Disposal
Plastic parts can be contaminated by poisonous or radioac­tive media to such an extent th at cleaning will not be suffi- cient.
WARNING
Risk of poisoning and environmental damage from medium.
Use personal protective equipment when carrying out any work on the device.
Prior to t he disposal of the device: Neutralize residues of medium in the device.
1. Remove battery and dispose of in accordance with local regulations.
2. Remove electronic parts and dispose of in accordance with local regulations.
3. Dispose of plastic parts in accordance with local regula­tions.
5 Installation and connection
5.1 Check operating conditions
1. Ensure the required operating conditions are met: – Resistance of body and seal material t o the medium
(resistance lists).
– Media temperature (9.1 Technical specications,
Page 8).
– Working pressure (9.1 Technical specications,
Page 8).
2. Consult with the manufacturer regarding any other use of the device.
5.2 Installing device in the process pipework
Process pipework has been properly prepared.
Process pipework has been secured against unintentional opening w ith shut-off values.
Avoidance of medium buildup.
Select installation location so that no build-up or crystalliza­tion is possible.
WARNING
Risk of injury and poisoning due to medium spraying out.
Use personal protective equipment when carrying out any work on the tting.
1. Unscrew union nut.
2. Insert union nut on to the spool piece of the process
pipework. Check m ounting direction.
3. Weld device insert to the process pipework spool piece.
4. Check O-ring tting.
5. Connect device to the process pipework. Tighten union nut
by hand only.
5.3 Performing the hydrostatic test
Perform hydrostatic test using neutral medium, e.g. water.
1. Pressurize the device, e nsuri ng
– Test pressure < 1.5 x P
N
(Nominal pressure)
– Test pressure < P
N
+5bar
– Test pressure < permissible system pressure
2. Check that the device is not leaking.
5.4 Electrical connection of device
Device is connected to the process pipework.
Power supply switched off and secured against being switched back on again.
Cable without shielding can be used to connect the device. If electromagnetic i nterference is anticipated, then shielded cable must be used.
1. Cut sensor cable supplied to length.
2. Fit plug (9.3 Plug assignment, Page 8).
3. Connect sensor housing with sensor cable.
6 PTM C2 BA-2016.11.24 EN 300 1 96
Maintenance
6 Operation
6.1 Initial start-up
Device is conn ected properly to the process pipework.
Device is connected properly with the power supply and ready for operation.
For this purpose, t he current output for pressure must be displayed in the hi gher-level controller as a m easured value.
After starting the higher-level controller, the device trans­mits the p ressure as current signal (4 … 20 mA).
7 Maintenance
WARNING
Risk of injury and poisoning due to hazardous or hot media.
Use personal protective equipment for all work on the device.
Allowdevicetocool.
Make sure the device is depressurized.
Block the media supply to the device.
Empty the process pipework, safely collect the media and dispose of it in accordance with environmental regulations.
Switch off the power supply to the system.
Secure po wer supply against being switched back on again.
Provide warning of maintenance and repair w ork and set up warning signs.
7.1 Servicing
Interval Action
As necessary
• Cleandevicewithadampcloth.
Six-monthly Visual and function check:
N ormal operating conditions unchanged
•Noleaks
No unusual operating noises or vibrations
Tab. 3 Servicing activities
Perform maintenance tasks according to the table.
7.2 Maintenance
7.2.1 Removing the device
System is e m pty.
System has been ushed.
System is depressurized.
System has cooled down.
System is secured against beingswitchedbackonagain.
1. Unplug connection cable.
2. Disassemble device from the process pipework.
3. Decontaminate device if required.
7.2.2 Replacement parts and return
1. Have the following information ready to hand when order­ing spare parts (3.1Typeplate,Page5). –Devicetype – ID number – Nominal pressure and diameter – Connection and gasket material
2. Please complete and enclose the document of compliance for returns (www.asv-stuebbe.com/service/downloads).
3. Only use spare parts from ASV Stübbe.
300 196 BA-2016.11.24 EN PTM C2 7
Appendix
8 Troubleshooting
WARNING
Risk of injury and poisoning due to hazardous media liq­uids!
Use personal protective equipment when carrying out any work on the device.
Error Possible cause
Corrective action
Medium is leaking out of the ange
Pre-tension of the O-ring too small
Retighten union nut by hand.
Tab. 4 Troubleshooting
9 Appendix
9.1 Technical specications
Technical data (Data sheet).
9.2 Dimensions
Dimensions (Data sheet).
9.3 Plug assignment
2
3
4
1
Fig. 3 Connection diagram
1Signal(+) 2 Signal (-) 3n.c. 4n.c.