Stübbe ETL Series, ETL 20-100, ETL 65-200, ETL 80-200 Operating Manual

Plastic Sump Pump
Original Operating Manual Series ETL
Version BA-2015.09.17 Print-No. 300 106
TR MA DE Rev002
Distributed in the UK by.....
ASV Stübbe GmbH & Co. KG
Pump Engineering Limited. Unit B1, Riverside Industrial Estate,
Hollwieser Strasse 5
Littlehampton, West Sussex, BN17 5DF, United Kingdom
Tel: 01903 730900 Fax: 01903 730234
Phone: +49 (0)5733-799-0
email: sales@pumpeng.co.uk Web: www.pumpeng.co.uk
Fax: +49 (0)5733-799-5000 Email: contact@asv-stuebbe.de Internet: www.asv-stuebbe.com
We reserve the right to make technical changes. Read carefully before use. Save for future use.
Table of contents
Table of contents
1 About this document ............................... 4
1.1 Target groups ................................. 4
1.2 Other applicable documents ................ 4
1.3 Warnings and symbols ..... .................. 5
2 Safety ............................... .................. 6
2.1 Intended use .................................. 6
2.2 General safety instructions .................. 6
2.2.1 Product safety ... ............................. 6
2.2.2 Operator's obligations ......... ............... 7
2.2.3 Obligations of personnel ..................... 7
2.3 Specic hazards .............................. 7
2.3.1 Hazardous pumped liquids .................. 7
3 Layout and function ...................... .......... 8
3.1 Labels ....................................... .. 8
3.1.1 Type plate ..................................... 8
3.2 Description ....... ............................. 8
3.3 Layout .... ..................................... 8
4 Transport, storage and disposal .................. 9
4.1 Transport ...................................... 9
4.1.1 Unpacking and inspection upon
delivery ................. ....................... 9
4.1.2 Lifting ............................ ............. 9
4.2 Storage ............................. .......... 10
4.3 Disposal ................................... .... 10
5 Setup and connection .............................. 11
5.1 Preparing the setup .......................... 11
5.1.1 Check operating conditions ................. 11
5.1.2 Preparing the installation site ............. .. 11
5.1.3 Surface preparation .......................... 11
5.2 Setting up ..................................... 11
5.3 Planning the pipes .................... ....... 12
5.3.1 Specifying supports and ange
connections .............. ..................... 12
5.3.2 Specifying nominal widths ............... .... 12
5.3.3 Optimizing chang es of cross section and
direction ....... ................................ 12
5.3.4 Providing safety and control devices
(recommended) .............................. 12
5.4 Connecting the pipes ........................ 12
5.4.1 Keeping the piping clean .................... 12
5.4.2 Installing the pressure pipe ................ .. 12
5.4.3 Inspection for stress-free pipe
connections .............. ..................... 12
5.5 Electrical con nec
5.5.1 Connecting the mo
5.5.2 Check direction
5.6 Performing the hydrostatic test .............. 13
6Operation............................... ............. 14
6.1 Preparin
g for commissioning . ...............
tion .........................
tor ... .....................
of rotation ...... .............
13 13 13
14
6.1.1 Checking downtimes ......................... 14
6.1.2 Filling and bleeding ................... ....... 14
6.2 Commissioning ............................... 14
6.2.1 Switching on .................................. 14
6.2.2 Switching off ................ .................. 14
6.3 Shutting down the pump ..................... 15
6.4 Restoring the pump to service .......... .... 16
6.5 Operating the stand-by pump ..... .......... 16
7 Maintenance ............................... .......... 17
7.1 Inspections ......... .......................... 17
7.2 Maintenance .................................. 17
7.2.1 Maintenance in accordance with maintenance
schedule .................................. .... 17
7.2.2 Cleaning the pump ........................... 18
7.3 Dismounting ..................... ............. 18
7.3.1 Preparations for dismounting ................ 18
7.3.2 Dismounting hydraulic system . .. . . . . . .. . . . . 18
7.3.3 Dismounting coupling and intermediate
ring . ........................................... 18
7.3.4 Dismounting V-rings ..................... .... 19
7.3.5 Dismounting shaft bearing ................... 19
7.4 Replacement parts and return . ............. 19
7.5 Installing ...... ................................ 20
8 Troubleshooting ............... ..................... 21
9 Appendix ........................................... .. 23
9.1 Replacement parts ........................... 23
9.1.1 Part numbers and designations . .. .. . . . . . . . . 23
9.1.2 Drawing ETL 20-100 to 65-200 ............. 24
9.1.3 Drawing ETL 80-200 ....................... .. 25
9.2 Technical specications ...................... 26
9.2.1 Ambient conditions ........................... 26
9.2.2 Sound pressure level ........................ 26
9.2.3 Flange tightening torques ......... .......... 26
9.2.4 Sole plate tightening torques .. . . . . . . . . . . . .. . 26
9.2.5 Tightening torques of casing scre ws . . . . . . . . 26
9.2.6 Installation di mensions and lling
heights ...................... .................. 27
9.3 Maintenance plan ............................ 27
9.4 Lubrication .................. .................. 28
9.4.1 Lubricating points .......... .................. 28
9.4.2 Lubricant ...................................... 28
9.5 Declaration of conformity in accordance with
EC machinery directive ...................... 29
2 ETL BA-2015.09.17 300 106
Table of contents
List of gures
Fig. 1 Type plate (example) ........ ................ 8
Fig. 2 Layout ................. ........................ 8
Fig. 3 Replacement parts ETL 20-100 to
65-200 .......... .............................. 24
Fig. 4 Replacement parts ETL 80-200 ............. 25
Fig. 5 Installation dimensions and lling
heights ..................... ................... 27
Fig. 6 Lubricating points ............................ 28
List of tables
Tab. 1 Other application documents, purpose and
where found ............................. ..... 4
Tab. 2 Warnings and symbols ....................... 5
Tab.3 Measurestobetakenifthepumpisshut
down .......................... ................ 15
Tab. 4 Measures depending on the behavior of the
pumped liquid ............. ................... 15
Tab. 5 Measures to be taken after prolonged
shutdown periods ......................... ... 16
Tab. 6 Fault/number assignment ...... ............. 21
Tab. 7 Troubleshooting list .......................... 22
Tab. 8 Designation of componen ts according to part
numbers ..... ................................. 23
Tab. 9 Ambient conditions ... ........................ 26
Tab. 10 Flange tightening torques ................... 26
Tab. 11 Sole plate tightening torques ................ 26
Tab. 12 Tightening torques of casing screws . .. . . . . . 26
Tab. 13 Installation dimensions (minimum
dimensions) ................................... 27
Tab. 14 Maintenance plan ............................ 27
Tab. 15 Lubricant ...................................... 28
Tab. 16 Lubricant quantities .......................... 28
300 106 BA-2015.09.17 ETL 3
About this document

1 About this document

This manual
Is part of the equipment
Applies to the aforementioned pump series
Describes safe and appropriate operation during all oper­ating phases

1.1 Target groups

Operating company
Responsibilities: – A lways keep this manual accessible where the device
is used on the system.
– Ensure that employees read and observe this docu-
ment, particularly the safe ty instructions and warnings, and the docume nts which also apply.
– Observe any additional country-spe ci c rules and reg-
ulations that relate to the system.
Qualied personnel, tter
Mechanics qualication: –Qualified employees with additional training for fitting
the respective pipework.
Electrical qualication: –Qualified electrician
Transport qualication: –Qualified transport speciali st
Responsibility: – Read, observe and follow this manual and the other
applicable documents, especially all safety instructions and warnings.

1.2 Other applicable documents

Document/purpose/ where found
Installation drawing
Dimensions when installed, tting dimensions, etc.
Resistance lists
Resistance of materials used to chemicals
www.asv-stuebbe.de/ pdf_resistance/300051.pdf
CE decl aration of conformity
Conformity with standards
Data sheet (340 056)
Technical specications, operating conditions, dimensions
www.asv-stuebbe.de/ pdf_datasheets/340056.pdf
Spare parts list
Ordering spare parts
Sectional drawing
Sectional drawing, part numbers, component designations
Supplier documentation
Technical documentation for parts supplied by subcontractors
Tab. 1 Other application documents, purpose
and where found
Documentation included
(9.5 Declarat­ion of conformity in accordance with EC machin­ery directive, Page 29).
Documentation included
Documentation included
Documentation included
4 ETL BA-2015.09.17 300 106

1.3 Warnings and symb ols

About this document
Symbol
1. , 2. , … Multiple-step instructions
Tab. 2 Warnings and symbols
Meaning
Immediate a cute risk
Death, serious bodily harm
Potentially acute risk
Death, serious bodily harm
Potentially hazardous situation
Minor injury
Potentially hazardous situation
Material damage Safety warning sign
Take note of all information highlighted by the safety warning sign and follow the instructions to avoid injury or death.
Instruction
Precondition Cross-reference Information, advice
300 106 BA-2015.09.17 ETL 5
Safety

2 Safety

The manufacturer does not accept any liability for any dam­age caused by disregarding any sections of the entire doc­umentation.

2.1 Intended use

Only use the pump with suitable media (resistance lists).
Do not use pump with solid particles or abrasive uids.
Do not use pump with combustible or explosive uids.
Adhere to the operating limits and size-dependent mini­mum ow rates.
Avoid dry running: Initial damage, such as destruction of bearings, seals and plastic parts, will occur within a few seconds. – Make sure the pump is only operated with, and never
without, pumped liquid.
Avoid cavitation: – Open suction-side tting fully and do not use to regulate
ow.
– D o not open the pressure-side tting beyond the
agreed operating point.
Avoid overheating: – Do not operate the pump while the pressure-side tting
is closed.
–Noteminimumflow (→ Data sheet).
Avoid damage to the motor: – D o not open the pressure-side tting beyond the
agreed operating point.
– Note the maximum permissible number of times the
motor can be switched on per hour (manufacturer's specications).
Consult the man ufacturer about any other use of the pu mp.
If pumps are delivered without m otors, then nal assembly as a pump assembly must take place in accordance with the provisions of machinery directive 2006/42/EC.
Prevention of obvious misuse (examples)
Observe pump limits of use regarding temperat sure, ow and speed (Data sheet).
The power consumption of the pump increases as the the specic gravity of the pumped uid increases. Adhere to the permissible specic gravity in order to eliminate the possibility that the pump, coupling and mo tor are over­loaded (Data sheet). A lower specic gravity is perm issible. Adapt the auxiliary systems accordingly.
When conveying uids containing solids, observe the limit values for proportions of solid particles and particle size (Data sheet, technical description).
•Whenusinga – Ensure com
product m
– Ensure
mediu
uxiliary plant systems:
patibility of the operating medium with the
edium.
constant supply of the relevant operating
m.
ure, pres-
Pumps used with water as the pumped liquid must not be used for foo dstuffs or drinking water. Use with food or drinking water must be specied in the data sheet.
Type o f installation should only be selected in accordance with these operating instructions. For example, the follow­ing are not allowed: – Hanging base plate pumps in the pipe – Overhead installation – Installation in the immediate vicinity of extreme heat or
cold sources
Installation too close to the wall

2.2 General safety instructions

Observe of the followin g regulations before carrying out any work.

2.2.1 Product safety

The pump has been built according to state-of-the-art technol­ogy and the recognized technical safety regulations. Never­theless, operation of the pump can still put the life and health of the user or third parties at risk or damage the pump or other property.
Only operate the pump if it is in perfect technical condition and on ly use it as intended, staying aware of safety and risks, and in adherence to the instructions in this manual.
Keep this manual and all oth er applicable documents com­plete, legible and accessible to personnel at all t imes.
Refrain from any procedures and actions that would pose a risk t o p ersonnel or third parties.
In the event of any safety-relevant faults, shut down the pump immediately and have the fault corrected by appro­priate personnel.
In add ition to the entire documentation for the product, comply with statutory or other safety and accident-preven­tion regulations and the applicable standards and guide­lines in the country where the pump is operated.
6 ETL BA-2015.09.17 300 106
Safety

2.2.2 Operator's obligations Safety-conscious operation

Only operate the pump if it is in perfect technical condition and o nly use it as intended, staying aware of safety and risks, and in adherence to the instructions in this manual.
Ensure that the following safety aspects are observed and monitored: – Adherence to intended use – Statutory or other safety and accident-prevention reg-
ulations
Safety regulations governing the handling of haz-
ardous substances
Applicable standards and guidelines in the country
where the pump is operated
Applicable guidelines of the operator
Make personal protective equipment available.
Qualied personnel
Make sure all personnel tasked with work on the pump have read and understood this man ual and all other appli­cable documents, especially the safety, maintenance and repair informatio n, before they start any work.
Organize r esponsibilities, areas of competence and the supervision of personnel.
Ensure that all work is carried out by specialist t echnicians only: – Fitting, repair and maintenance work – Transportation – Work on the electrical system
Make sure that trainee personnel only work on the pump under s upervision of specialist technicians.
Safety equipment
Provide the following safety equipment and verify its fu nc­tionality: – For hot, cold and moving parts: pump safety guarding
provided by the customer
For pumps without capability to run dry: Dry run pro-
tection
For potential electrostatic chargi ng: provide suitable
grounding

2.2.3 Obligations of personnel

All directions given on the pump must be followed (and kept legible), e.g. the arrow indicating the sense of rotation and the markings for uid connections.
Pump, coupling guard and components: – Do not step on them or use as a climbing aid – Do not use them to support boards, ramps or beams – Donotusethemasaxing point for winches or sup-
ports – Do not use them for storing paper or similar materials – Do not use hot pump or motor components as a heating
point – Do not de-ice using gas burners or similar tools
Do not remove the safety guarding for hot, cold or moving parts during operation.
Use p ersonal protective equipment if necessary.
Only carry out work on the pump while it is not running.
Before all installation and maintenance work, discon­nect the mo tor from the mains and secure against being switched back on again.
Never reach into the suction or discharge ange.
Following all work on the pump, ret safety devices in accordance with the instructions and bring into service.
2.3 Specichazards

2.3.1 Hazardous pumped liquids

When handling hazardous uids, observe the safety regu­lations for the handling of hazardous substances.
Use personal protective equipment when carrying out any work on the pump.
Collect leaking pumped liquid and residues in a safe man­ner and dispose of i n accordance with en vironmental reg­ulations.
Warranty
Obtain the manufacturer's approval prior to carrying out any modications, repairs or alterations during the warranty period.
Only use genuine parts or parts that have been approved by the manufacturer.
300 106 BA-2015.09.17 ETL 7
Layout and function

3 Layout and function

3.1 Labels

3.1.1 Type plate

ASV Stübbe GmbH & Co. KG
Tel.: +49 (0) 57 33 / 79 9-0
Typ
Fabr. Nr.
8
Werkst.
L ø
7
Q
m
3
/h
H
m
1
2
3
4
5
6
GLRD
Fig. 1 Type plate (example)
1Pumptype 2 Serial number 3 Housing / sealing material 4– 5 Differential head 6 Shaft seal information 7Flow 8 Impeller diameter [mm]

3.2 Description

Non self-priming, vertical centrifugal pump Useinopenorclosedpressureless containers or pits/trenches.
Thepumpisdry-runningsafe.

3.3 Layout

13
12
11
10
9
8
7
6
5
Fig. 2 Layout
1 V-ring seal 2 Discharge ange 3 Volute casing 4 Strainer (optional) 5Suctioncup 6Impeller 7Protectiontube 8Shaft 9 Immersion tube 10 Sole plate 11 Shaft bearing 12 Coupling 13 Motor
1
2
3
4
8 ETL BA-2015.09.17 300 106

4 Transport, storage and disposal

Transport, storage and disposal

4.1 Transport

Weight specications (documents for the particular order).

4.1.1 Unpacking and inspection upon delivery

1. Unpack the pump/pump assembly upon delivery and inspect it for transport damage.
2. Check completeness and accuracy of delivery.
3. Report any transport damage to the ma nufacturer immedi­ately.
4. Dispose of packaging material according to local regula­tions.
Retain transport frame for horizontal storage (recom­mended)

4.1.2 Lifting

DANGER
Death or limbs crushed as a result transported items falling over.
Use lifting gear appropriate for the total weight to be trans­ported.
Attach lifting gear in accordance with the following dia­grams.
Never attach the liftin g gear t o the lifting eye of the motor (other than for securing against knocking over for pump assemblies with a high center of gravity).
Do not s tand un der suspended loads.
1. Attach lifting gear in accordance with the following diagram.
2. Lift pump/pump assembly appropriately.
300 106 BA-2015.09.17 ETL 9
Transport, storage and disposal

4.2 Storage

DANGER
Death or limbs crushed as a result of the pump overturn­ing.
For vertical storage: – Place pump on a horizontal undergroun d and secure
against overturning.
NOTE
Material damage due to inappropriate storage!
Store the pump properly.
1. Seal all open ings with blind anges, blind plugs or plastic covers.
2. Make sure the storage room meets the following condi­tions: –Dry – F rost-free – Vibration-free –UVprotected
3. For horizontal storage – Protect pump against sagging by means of proper sup-
port.
4. Turn the pump twice a month.
5. Make sure the shaft and bearing change their rotational position in the process.

4.3 Disposal

Plastic parts can be contaminated by poisonou s or radioac­tive pumped liquids to such an extent that clean ing will be insufcient.
WARNING
Risk of poisoning and environmental damage by the pumped liquid or oil!
Use personal protective equipment when carrying out any work on the pump.
Prior to the disposal of the pump: – Collect and dispose of any e scaping pumped liquid or
oil in accordance with local regulations.
– Neutralize residues of pumped liquid in the pump. Remove the plastic parts and dispose of them in accor-
dance with local regulations.
Dispose of the p um
p in accordance with local regulations.
10 ETL BA-2015.09.17 300 106

5 Setup and connection

Setup and connection
NOTE
Material damage due to distortion or passage of electrical current in the bearing!
Do not make any structural modications to the pump assembly or pump casing.
Do not carry out any welding work on the pump assembly or pump casing.
NOTE
Material damage caused by dirt!
Do not remove the transport seals until immediately before setting up the pump.
Do not remove any covers or transport and sealing covers until immediately before connecting the pipes to the pump.

5.1 Preparing the setup

5.1.1 Check operating conditions

1. Ensure the required operating conditions are met: – Resistance of body and seal material to the medium
(resistance lists).
Required ambient conditions
(9.2.1 Ambien t conditions, Page 26).
2. Ensure necessary dimensions for tank cut-out (Data sheet).
3. Ensure safe aeration and venting of the contai ner in all operating phases.
4. Ensure required installation dimensions and lling lev­els (9.2.6 Installation dimensions and fillin g heights, Page 27). – Minimum distances –Maximumfilling height –Minimumfilling height

5.1.3 Surface preparation

Aids, tools, materials: – Spirit level
1. Make sure the surface meets the following conditions: – Level and horizontal – Clean (no oil, dust or other impurities) – Capable of bearing the weig ht of the pump assembly
and all operating forces – Stability of the pump ensured – Resonance-free
2. Clean containers, basins or pits carefully and protect from further contamination, e.g. by installing overow wall in front of the container or pit inlet.

5.2 Setting up

1. Remove the suction-side cover if present.
2. Lift pump/pump assembly (4.1 Transport, Page 9 ).
3. Place pump/pump assembly on the contact surface of the container/pit.
4. Attach sole plate to the contact surface. – Pump must not be mechanically under tension as a
result of being attached
5. Screw on the sole plate (9.2.4 Sole plate tightening torques, Page 26).

5.1.2 Preparing the installation site

Ensure the installation site meets the following conditions: – Pump is freely accessible from all sides –Sufficient space for the installation/removal of the pip es
and for maintenance and repair work, especially for the removal and installation of the pump and the motor
Pump not exposed to external vibrations (damage to
bearings)
Frost protection
300 106 BA-2015.09.17 ETL 11
Setup and connection

5.3 Planning the pipes

Water hammers may damage the pump or the system. Plan the pipes and ttings as far as possible to prevent water hammers occurring.
5.3.1 Specifying supports and ange connections
NOTE
Material damage due to excessive forces and torq ues on the pump.
Ensure pipes are connecte d not under tension.
1. Support pipes in front of the pump.
2. Ensure the pipe s upports have permanent low-friction properties and do not seize up due to corrosion.

5.3.2 Specifying nominal widths

Keep the ow resistance in the pipes as low as possible.
1. Make sure the suction extension is not smaller than the nominal width of the suctio n branch.
2. Make sure the nominal pressure line width is not smaller than the nominal discharge ange width. – Ensure ow velocity is less than 3 m/s.

5.4 Connecting the pipes

NOTE
Material damage due to excessive forces and torq ues on the pump.
Ensure pipe connection without tension.

5.4.1 Keeping the piping clean

NOTE
Material damage due to impurities in the pump!
Make sure no impurities can enter the pump.
1. Clean all piping parts and ttings prior to assembly.
2. Flush all pipes carefully with neutral medium.
3. Ensure no ange seals protrude inwards.
4. Remove any blind anges, plugs, protective foils and/or protective paint from the anges.

5.4.2 Installing the pressure pipe

1. Remove the transport an d sealing covers from the pump.
2. Fit pressure line stress-free an d sealed. (9.2.3 Flange tightening torques, Page 26).
3. Ensure no seals protrud e inward s .

5.3.3 Optimizing changes of cross section and direction

1. Avoid radii of curvature of less than 1.5 times the nominal
pipe diameter.
2. Avoid abrupt changes of cross-section along the piping.

5.3.4 Providing safety and control devices (recommended)

Avoid reverse running
1. Ensure that the medium does not ow back after switch-
ing off the pump by using a non-return valve between dis­charge ange and stop valve.
2. In order to enable venting, inclu de vent connection
between discharg e anges and non-return valve.
Make provisions for isolating and shutting off the pipes
For maintenance and repair work.
Provide shut-off devices in the pressure pipe.
Allow m easurements of the operating conditions
1. Provide pressure gauge in pressure line for pressure mea-
surement.
2. Provide pressure measurement on the pump side.

5.4.3 Inspection for stress-free pipe connections

Piping installed and cooled down
1. Disconnect the pipe connecting anges from the pump.
2. Chec k whether the pipes can be moved freely in all direc­tions within the expected range of expansion: – Nominal width < 150 mm: by hand – Nominal width > 150 mm: with a small lever
3. Make sure the ange surfaces are parallel.
4. Reconnect the pipe connecting anges to the pump.
12 ETL BA-2015.09.17 300 106

5.5 Electrical connection

DANGER
Risk of death due to electric shock!
All electrical work must be carried out by qualied electri­cians only.
Before all work on the electrical system, disconnect the motor from the mains and secure against being switched back on again.

5.5.1 Connecting the motor

Follow the instructions of the motor manufacturer.
1. Connect the motor according to the connection diagram.
2. Make sure no danger arises due to electric p ower.
3. Install an EMERGENCY STOP switch.

5.5.2 Check direction of rotation

Setup and connection
DANGER
Danger to life from rotating parts
Use personal protective equipment when carrying out any work on the pump.
Maintain an adequate distance from rotating parts.
1. Switch on motor for max. of 2 seconds and switch off again immediately.
2. Check whether the sense of rotation of the motor matches the d irection of rotation on the fan.
3. If the sense of rotation is different: Change over the two phases.

5.6 Performing the hydrostatic test

Only necessary if the entire system needs to be tested under pressure.
NOTE
Material damage due to bursting of pump casing.
Testing pressure must not exceed the permissible pum p pressure (order data sheet).
Make sure the testing pressure does not exceed the per­missible pump pressure. – If necessary, do not perform pressure test on the pump.
300 106 BA-2015.09.17 ETL 13
Operation

6Operation

6.1 Preparing for commissioning

6.1.1 Checking downtimes

Check downtimes (Table 5 Measures to be taken after prolonged shutdown periods, Page 16).

6.1.2 Filling and bleeding

WARNING
Risk of injury and poisoning due to hazardous uid!
Use protective equipment for any work on the pump. Collect leaking liquid safely an d dispose of in accordance
with local regulations.
1. Close pressure-side tting.
2. Fill pump and, if present, suction pipe with uid. Ensure minimum lling height when doing so (Ta b le 13 Installation dimensions (minimum dimensions), Page 27).
3. Verify that no pipe connections are leaking.

6.2 Commissioning

6.2.1 Switching on

Pump set up and connected properl y Motor set up and connected properly All connections stress-free and se aled All safety equipment installed and tested for functionality Pump prepare d, lled and vented correctly Container is lled sufciently up to minimum height
“Z” (9.2.6 Installation dimensions and lling heights, Page 27).
NOTE
Risk of cavitation if suction ow is restricted.
Open the suction-side tting and do not use to regulate theow.
Do not open the pressure-side tting beyond the operating point.
NOTE
Material damage due to overheating.
Do not operate the pump for long periods w ith the pressure­side tting closed.
Observe minimum ow ( order data sheet).
1. Open the suction-side tting.
2. Close pressure-side tting
3. Switch on the motor and check it for smooth running.
4. Once the motor has reached its nominal speed, open the pressure-side tting slowly until the operating point is reached.
5. Make sure temperatu r e change i s smaller than 5 K/min for pumps with hot uids.
6. After the initial stress due to the pressure and operating temperature, check that the pump is not leaking.

6.2.2 Switching off

Pressure-side tting closed (recommended)
WARNING
Risk of inju ry du e to hot pump parts!
Use personal protective equipment when carrying out any work on the pump.
DANGER
Risk of injury from running pump.
Do not touch the running pump. Ensure that the coupling gua rd is attached. Do not carry out any work on the running pump. Allow the pump to cool down completely before starting any
work.
1. Switch off motor.
2. Check all connecting bolts and tighten if necessary (only after initial commissioning).
DANGER
Risk of injury a ing out!
Use personal protective equipment when carrying out any work on the pump.
14 ETL BA-2015.09.17 300 106
nd poisoning due to pumped liquid spray-
Operation

6.3 Shutting down the pump

DANGER
Risk of injury from running pump
Do not touch the running pump. Do not carry out any work on the running pump. Before all installation and maintenance work, discon-
nect the mo tor from the mains and secure against being switched back on again.
DANGER
Risk of electrocution!
All electrical work must be carried out by qualied electri­cians only.
Before all work on the electrical system, disconnect the motor from the mains and secure against being switched back on again.
WARNING
Risk of injury and poisoning due to hazardous uid!
Use protective equipment for any work on the pump. Collect leaking liquid safely and dispose of tting in accor-
dance with local regulations.
Take the following measures whenever the pump is shut down:
Pump is Action
shut down
…emptied
…dismounted
…put into storage
Tab. 3 Measures to be taken if the pump is shut down
Behavior of the pumped liquid
Crystallized or polymerized, solids sedimenting
Solidifying/ freezing, non-corrosive
Solidifying/ freezing, corrosive
Remains liquid, non-corrosive
Remains liquid, corrosive
Tab. 4 Measures depending on the behavior
of the pumped liquid
Take measures appropriate for the uid (Table 4 Measures depending on the behavior of the pumped liquid, Page 15).
Close suction and pressure-side tting.
Isolate the motor from its power supply and secure it against unauthorized switch-on.
Note measures for storage.
Duration of shutdown (depending on process)
Short
Flush the pump.
Heat up or empty the pump and containers.
Heat up or empty the pump and containers.
––
Long
Flush the pump.
Empty the pump and containers.
Empty the pump and containers.
Empty the pump and containers.
300 106 BA-2015.09.17 ETL 15
Operation

6.4 Restoring the pump to service

1. If the pump is shut down for over 1 year, take the following measures before restoring it to service:
Shutdown period
>2years Replace elastomer seals
Tab. 5 Measures to be taken after prolonged
shutdown periods
2. Complete all steps as for commissioning (6.2 Commissioning, Page 14).
Action
(O-rings, shaft sealing rings).

6.5 Operating the stand-by pump

Stand-by pump lled and bled
Operate the stand-by pump at least once a week.
Open pressure-side tting far enough so that the stand-by pump operating temp erature is achieved and heating is even ( 6.2.1 Switching on, Page 14).
16 ETL BA-2015.09.17 300 106

7 Maintenance

Maintenance
Trained service technicians are available for tting and repair work. Submit evidence of conveyed medium on request (DIN safety data sheet or safety certicate).

7.1 Inspections

The inspection intervals depend on the operational strain on the pump.
DANGER
Risk of injury due to running pump!
Do not touch the running pump. Do not carry out any work on the running pump.
WARNING
Risk of injury and poisoning due to hazardous pumped liquids!
Use protective equipment for any work on the pump.
1. Check at appropriate intervals: – Adherence to the min imum ow rate – Normal operating conditions unchanged – Filling level of the container
2. Fo r trouble-free operation, always ensure the fo llowing: –Noleaks – No cavitation – Free and clean lters – No unusual running n oises or vibrations – No inadmissible leaks on the shaft seal

7.2 Maintenance

Operating life of an tifrictio n bearings in operation are within permissible range: >2 years.
Intermittent operation, high temperatures, low viscosities and aggressive ambient and process conditions reduce the service life of antifriction bearings.
Plain bearings are subject to natural wear and tear which is heavily dependent on the respective operating condi­tions. It is therefore not possible to make general state­ments about the operating life.
DANGER
Risk of injury from running pump
Do not touch the running pump. Do not carry out any work on the running pump. Before all installation and maintenance work, discon-
nect the mo tor from the mains and secure against being switched back on again.
DANGER
Risk of electrocution!
All electrical work must be carried out by qualied electri­cians only.
Before all work on the electrical system, disconnect the motor from the mains and secure against being switched back on again.
DANGER
Danger to life from rotating parts
Ensure coupling guard is tted after work on the pump.
WARNING
Risk of injury and poisoning due to hazardous or hot uid.
Use protective equipment for any work on the pump. Allow the pump to co ol down completely before commenc-
ing any work. Make sure the pump is unpressurized. Empty the pump, s afely collect the pumped liquid and
dispose of it in accordance with environmental rules and requirements.
7.2.1 Maintenance in accordance with main­tenance schedule
Perform maintenance work in accordance with the mainte­nance schedule (9.3 Maintenance plan, Page 27).
300 106 BA-2015.09.17 ETL 17
Maintenance

7.2.2 Cleaning the pump

NOTE
High water pressure or spray water can damage bearings!
Do not clean bearing areas with a water or steam jet.
Clean l arge-scale grime from the pump.

7.3 Dismounting

DANGER
Risk of injury due to running pump!
Do not touch the running pump. Do not carry out any work on the running pump. Before all installation and maintenance work, discon-
nect the motor from the mains and secure against being switched back on again.
DANGER
Risk of electrocution!
All electrical work mus t be carried out by qual i ed electri­cians only.
Before all work on the electrical system, disconnect the motor from the mains and secure against being switched back on again.
DANGER
Death or limbs crushed as a result of the pump overturn­ing.
Place pump on a horizontal underground and secure against overturning.
WARNING
Risk of injury and poisoning due to hazardous or hot uid.
Use protective equipment for any work on the pump. Allow the pump to cool down completely bef
ing any work. Make sure the pump is unpressurized. Empty the pump, s afely collect the pumped liquid and
dispose of it in accordance with environmental rules and requirements.
ore commenc-
WARNING
Risk of injury during disassembly!
Secure the pressure-side gate valve against accidental opening.
Depressurize the blocking pressure system, if available. Wear protective gloves, components can be very sharp-
edged due to wear or damage. Remove spring-lo ad ed components carefully (e.g.
mechanical seal, tensioned bearing, valves etc.), as com­ponents can be ejected by the spring tension.
Observe the manufacturer's specications (e.g. for the motor, coupling, mechanical seal, blocking pressure sys­tem, cardan sh aft, drive s , belt drive etc.).
NOTE
Material damage due to incorrect dismounting/installation of the pump.
Only specialist mechanics should complete dismounting/ installation work.

7.3.1 Preparations for dismounting

Pump is depressurised Pump completely empty, ushed and decontaminated Electrical connections disconnected and motor secured
against switch-on Pump cooled down Manometer lines, manometer and xtures dismounted When dismounting, observe the following:
– Mark the precise orientation and position of all compo-
nents before dismounting them. – Dismount components concentrically without canting. – Dismount pump (sectional drawing).

7.3.2 Dismounting hydrau lic system

1. Undo the pressure pipe screw connection between spiral casing and sole plate.
2. Screw out the hexagon screws or stud bolts (901.2 or
902.1) from the spiral casing (102).
3. Pull the spiral casing (102) to the bottom. – Donottiltthespiralcasing – Do not damage the centering and impeller
4. Remove the impeller cap (260) including O-ring (412.4).
5. Screw out the hexagon nut (920.1), r (934.0) and disc (550).
6. Screw out the impeller (230) from the shaft (211).
7. Remove the key (940.2) and O-ring (412.3).
emove spring ring
WARNING
Risk of injur y due to heavy components!
Pay atte heavy c
Set down components safely and secure them against overturning or rolling away.
18 ETL BA-2015.09.17 300 106
ntion to the component weight. Lift and transport
omponents using suitable lifting gear.
7.3.3 Dismounting coupling
1. Screw out screws on the motor ange, re move motor (801) and motor-side coupling half (840.1).
2. Screw out screws ( (341).
3. Remove intermediate ring.
4. Undo stud bolt (840.2) and remove pump - side coupling half.
901.3) and remove motor bell housing
and intermediate ring
Maintenance

7.3.4 Dismounting V-rings

1. Screw out nuts (920.4) and screws (554.3) and remove motor (801).
2. Dismounting hydraulic system (7.3.2 Dismounting hydraulic system, Page 18).
3. Remove the housing cover (161).
4. Remove shaft protection tube (714).
5. Screw out fastenin g screws (901.7).
6. Remove the suspension pipe (713) including reinforcement plate (893.2) from the drive assembly group.
7. Remove intermediate ring (509) and V-ring.
8. Remove sealing washer (444).
9. Pull off the sealing ange (490) from the bearing bracket mounting (330).
10. Remove V-ring in the bearing cover (360.2).

7.3.5 Dismounting shaft bearing

1. Remove V-rings step 1 to 9 (7.3.4 Dismounting V-rings, Page 19).
2. Press out the spring dowel sleeves (531) in the shaft sleeve area (523.1).
3. Remove the shaft sleeve (523.1) from the shaft.
4. Screw out socket head cap screws (914.4).
5. Remove bearing cover (360.2).
6. Bend the stem of the securing plate (931.1) to one side and undo the shaft nut (921.1).
7. Press the shaft assembly group (211) including distance sleeve (525) and the shaft bearing (321.1) out of the bear­ing s upport towards the hydra ul ics side.
8. Screw out headless setscrews (904.1).
9. Remove the sleeve (525) from the shaft.
10. Press out shaft bearing (321.1) and labyrinth disc (555).
11. Remove the circlip (932.2) from the bearing sup port.
12. Press the bearing (321.1) including the top labyrinth disk (555) out of the bearing support (330).

7.4 Replacement parts and return

1. Have the following information ready to hand when order­ing spare parts
–Devicetype – ID number – Nominal pressure and diameter – Connection and gasket material
2. Please complete and enclose the document of compliance for returns (www.asv-stuebbe.de/pdf_DOC/300359.pdf).
300 106 BA-2015.09.17 ETL 19
Maintenance

7.5 Installing

Install components concentrically and without tilting in accordance with the markings applied.
WARNING
Risk of injury due to heavy components
Pay attention to the component we ight. Lift and transport heavy components using suitable lifting gear.
Set down components safely and secure them against overturning or rolling away.
WARNING
Risk of injury during assembly!
Install spring-loaded components carefully (e.g. mechan­ical seal, tensioned bearing, valves etc.), as components can be ejected b y the spring tension.
Observe the manufacturer's specications (e.g. for the motor, coupling, mechanical seal, blocking pressure sys­tem, cardan sh aft, drive s , belt drive etc.).
NOTE
Material damage due to incorrect dismounting/installation of the pump.
Only specialist mechanics should complete dismounting/ installation work.
NOTE
Material damage due to unsuitable components!
Always replace lost or damaged screws with screws of the same strength where required.
Only replace seals with seals of the same material.
NOTE
Material damage, fragile components
Install ceramic parts of the plain bearing and magnets of the magnetic coupling with care, do not hit or knock.
1. When installing please observe: – Replace wo rn parts with genuine spare parts. – Replace seals, inserting them in such a w ay that they
are unable to rotate.
– Do not apply synthetic or mineral oil, grease or cleaning
agents to elastomer components.
Adhere to the prescribed tightening torques
(9.2.5 Tightening torques of ca sing screws, Page 26).
2. Installing –in reverse
sectio
3. Installing the pump in the system (5 Setup and connec­tion, Page 11).
the pump:
(7.3 Dis
order to the dismounting
mounting, Page 18).
nal drawing
20 ETL BA-2015.09.17 300 106

8 Troubleshooting

If faults occur which are not specied in the following table or cannot be traced back to t he specied causes, please consult the manufacturer.
Possible faults are identied by a fa ult number in the tabl e below. This number identies the respective cause and rem­edy in the troubleshooting list.
Fault Number
Pump not pumping 1
Pumpingrateinsufficient
Pumping rate excessive 3
Pumping pressure insufcient
Pumping pressure excessive
Pump running roughly 6
Pump leaks
Excessive motor power uptake 8
Tab. 6 Fault/number assignment
2
4
5
7
Troubleshooting
Fault number 1234
–––––––
X
XX–X
–––––––
X
X
XX–X
XX–X
XX–X
XX
X
X
––––X––
X
X
––
X
––
5
6
X
X
X
X
X
X
X
X
X
X
–––
––––
XX
XX
7
8
––
——
––
––
––
––
X
––
––
Cause
Pressure pip e closed by tting
Pump or suction s trainer blocked or encrusted
Transport and sealing cover still in place Remove the transport and sealing cover.
Counterpressure of system is too high, pump selected is too small.
Suction head too large: NPSH than NPSH
intake/suction pipe and pump not correctly vented or not completely lled
Air is sucked in
Proportion of gas too high: pump is cavitating
Temperature of uid is too high: pump is cavitating
Viscosity or specic gravity of the pumped liquid outside the range specied for the pump
Geodetic differential head and/or pipe ow resistances too high
Pressure-side tting not opened wide enough
Pressure pipe blocked
system
pump
is larger
Remedy
Open the tting.
Clean intake/suction pipe, pump or suction strainer.
Consult with the manufacturer.
Increase pump inlet pressure. Consult with the manufacturer.
Completely ll and vent pump and/or pipe.
Check lling level of container.
Consult with the manufacturer.
Increase pump inlet pressure. Lower temperature. Contact the manufacturer.
Consult the manufacturer.
Remove sediments from the pump and/or pressure pipe.
Install a larger impeller and consult the manufacturer.
Open the pressure-side tting.
Clean the pressure pipe.
300 106 BA-2015.09.17 ETL 21
Troubleshooting
Fault number 1234
XX–X
XX–X
––
X
XX–X
X
5
––––
6
X
X
7
––
––
––X––X–
––X–
––X–
––X–
XX–X
X
X
–––
X
XX–X Motor speed too high
XX–X Impeller diameter too large
X
X
––
––
–– –– –X–
–– –– –X–
–– –– ––X–
–– –– ––X–
–– –– –
X
X
X X X Pump distorted
X
Tab. 7 Troubleshooting list
Cause
8
Pump running in the wrong direction
Motor speed too low
Pump parts worn
X
Pressure-side tting opened too wide
X
Geodetic differential head, pipe ow resistances and/or other resistances lower than specied
Viscosity lower than expected
Impeller out of balance or blocked
Hydraulic parts of the pump dirty, clotted or encrusted
X
Shaft bearing faulty
X
Defective antifriction bearing in motor
Connecting bolts not correctly tightened
Faulty housing seal
X Motor running on 2 phases
Remedy
Check sense of rotation and correct if necessary (5.5.2 Check direction of rotation, Page 13).
Compare the required motor speed with the specications on the pump type plate. Replace the motor if necessary.
Increase the motor speed if speed control is available.
Replace the worn pump parts.
Throttle down at the pressure-side tting. Machine t he impeller down. Consult the
manufacturer and a djust the impeller diameter.
Throttle down the ow rate at the pressure-side tting. Observe the minimum ow rate.
Machine t he impeller down. Consult the manufacturer and a djust the impeller diameter.
Machine t he impeller down. Consult the manufacturer and a djust the impeller diameter.
Compare the required motor speed with the specications on the pump type plate. Replace the motor if necessary.
Reduce the motor speed if speed control is available.
Throttle down the ow rate at the pressure-side tting. Observe the minimum ow rate.
Machine t he impeller down. Consult the manufacturer and a djust the impeller diameter.
Clean the impeller.
Dismount the pump. Clean the parts.
Replace shaft bearing.
Replace the antifriction bearing (manufacturer 's specications).
Tighten the connecting bolts.
Replace housing seal
Check the pipe connections and pump attachment.
Check the fuse and replace it if necessary.
Check the cable connections and insulation.
22 ETL BA-2015.09.17 300 106

9 Appendix

Appendix

9.1 Replacement parts

9.1.1 Part numbers and designations

Part no. Designation
102 Volute casing
161 Housing cover
211
230 Impeller
260 Impell er cap
321.1 Bearing
321.2 Bearing
330 Bearing bracket
341 Motor bell housing
360.2 Bearing cap
412.x
444
490
507.1 V-ring
509 Intermediate ring
523.1
525 Distance sleeve
531
550 Disc
554.x Disc
555
556 Round head grooved pin
636
681.1
681.2
710
713
714
716 P ressure connection
801 Motor
840.1/2 Coupling
860 Intermediate ring
893.2
901.x Hexagon head bolt
Shaft
O-ring
Sealing washer
Sealing ange
Shaft sleeve
Clamping sleeve
Centrifugal disk
Grease nipple
Coupling g
Contact guard
Suction e xtension
Sole plate with support tube
Shaft protection tube
Reinforcement plate
uard
Part no. Designation
902.1
904.1 Headless setscrew
914.4
920.x Hexagon nut
921.1
931.x Locking plate
932.2
934
940.x Key
970.3 Name plate
Tab. 8 Designation of components according
to part numbers
Stud bolt
Cylinder screw
Shaft nut
Circlip
Spring ring
300 106 BA-2015.09.17 ETL 23
Appendix

9.1.2 Drawing ETL 20-100 to 65-200

A
B
Fig. 3 Replacement parts ETL 20-100 to 65-200
ASize132 B Suction basket (optional)
24 ETL BA-2015.09.17 300 106

9.1.3 Drawing ETL 80-200

Appendix
Fig. 4 Replacement parts ETL 80-200
300 106 BA-2015.09.17 ETL 25
Appendix
9.2 Technical specications
Further technical data (Data sheet).

9.2.1 Ambient conditions

Operation under any other ambient conditi ons should be agreed with the manufacturer.
Tempera­ture [°C]
–20 to +401)≤ 85 ≤ 100 ≤ 1000
Tab. 9 Ambient conditions
1) material-dependent

9.2.2 Sound pressure level

Sound pressure level < 75 dB(A)
Measuring conditions:
Distance to the pump: 1 m
Operation: free of cavitation
Motor: IEC standard motor
Tolerance ±3 dB
Relative humidity [%] Long-term
Short-term
Setup height above sea level [m]

9.2.5 Tightening torques of casing screws

Size
M6 9 6
M8 21
M10421410
M12732425
M16 170 63 30
M20 340 113 32
M24 580 193 34
Tab. 12 Tightening torques of casing screws
Metal con­nections
Plastic con­nections
7
Plastic con­nections with metal inserts
5
6

9.2.3 Flange tightening torques

DN [mm] Md [Nm] DN [mm] Md [Nm]
15 15 80 40
20 15 100 45
25 15 125 50
32 25 150 65
40 35 200
50 40 250 100
65 40 300 110
Tab. 10 Flange tightening torques

9.2.4 Sole plate tightening torques

Screw
M8
M10 14 M20 113
M12 24 M24 193
Tab. 11 Sole plate tightening torques
Md [Nm]
7
Screw
M16 63
75
Md [Nm]
26 ETL BA-2015.09.17 300 106
Appendix
9.2.6 Installation dimensions and lling heights
Z
Size
20-100 80 110 170 100 10
25-125 80 110 170 100 10
32-125 80 140 170 125 15
32-160 80 140 170 125 15
32-200 80 140 170 125 15
40-125 80 140 170 150 10
40-160 80 160 170 150 10
40-200 80 160 170 150 10
50-125 80 160 170 125 35
50-160 80 160 170 125 35
50-200 80 160 170 125 35
65-200 80 160 170 150 35
80-200 80 180 170 170 35
Tab. 13 Installation dimensions (minimum dimensions)
O
VZXY
[mm]

9.3 Maintenance plan

Fig. 5 Installation dimensi
Max: maximum lling height Min: minimal lling height Z: Minimum heigh
t
ons and lling heights
Designation Interval Maintenance
Operating temperatures
Undoable screwed connections
Shaft bearing (only for drive capacity 30 kW)
Impeller
Coupling and intermediate ring
Intermediate ring
14
Tab .
Weekly
Weekly
Monthly
Quarterly
Quarterly Check coupling and
5000 h Replace intermediate ring
tenance plan
Main
Check storage temperature
Check motor temperature.
Check for correct and tight tting.
Re-grease shaft bearing (9.4 Lubri c ation, Page 28).
Check impeller for wear and damage
Clean or replace impeller
intermediate ring for wear. Replace worn
components
The dimensions and minimum dimension s specied in the table must not be less than stated.
300 106 BA-2015.09.17 ETL 27
Appendix

9.4 Lubrication

Only for version with labyrinth seal.

9.4.1 Lubricating p oints

A

9.4.2 Lubricant

Manufacturer Type of lubricant
temperature range –35 °C … +140 °C
Aral Aralub HL3
BP
Glissando Glissando FT3
Esso Beacon 3
Mobilux Mobilux EP3
Shell
Tab. 15 Lubricant
Size Quantity [g]
40-200
Tab. 16 Lubricant quantities
Energrease LS3
Glissando 30
Alvania R3
5.5
A
Fig. 6 Lubricating points
A Lubricating points
28 ETL BA-2015.09.17 300 106
9.5 Declaration of conformity in
accordance with EC machinery directive
CE declaration of conformity
We hereby declare under our sole responsibility that the products listed below Description
Centrifugal pumps with mechanical seal
NM,NMB,SHB
Solenoid pumps
SHM
Eccentric pumps
Type F, Type L
Sump pumps
ET, ETL, ETLB
to which this declaration relates, are in conformity with the following standards:
Machinery Directive 2006/42/EC EMV Directive 2004/108/EC With regard to electrical risks, the protection objectives of the Low Voltage Directive 2006/95/EC have been complied with in accordance with appendix I no. 1.5.1 of the Machinery Directive 2006/42/EC.
Place and date ____________________
Vlotho, 19.08.2013
Name and signature of authorized person ____________________________________ p.p. Achim Kaesberg, Head of Electrical Engineering
Appendix
300 106 BA-2015.09.17 ETL 29
Appendix
30 ETL BA-2015.09.17 300 106
Appendix
300 106 BA-2015.09.17 ETL 31
Appendix
32 ETL BA-2015.09.17 300 106
Loading...