Table of contents
Table of contents
1 About this document ............................... 4
1.1 Target groups ............................... .. 4
1.2 Other applicable documents ................ 4
1.3 Warnings and symbols ....................... 5
2 Safety .................... ............................. 6
2.1 Intended use .................................. 6
2.2 General safety instructions .................. 6
2.2.1 Product safety .............. .................. 6
2.2.2 Obligations of the operating company . .. .. . 7
2.2.3 Obligations of personnel ........ ............. 7
2.3 Speci¿c hazards .............................. 7
2.3.1 Hazardous pumped liquids .................. 7
3 Layout and function ......... ....................... 8
3.1 Marking ....................................... 8
3.1.1 Name plate ...................... ............. 8
3.2 Description .................................. .. 8
3.3 Assembly ..... ................................ 8
4 Transport, storage and disposal .................. 9
4.1 Transport . ..................................... 9
4.1.1 Unpacking and inspection on delivery ...... 9
4.1.2 Lifting .... ..................................... 9
4.2 Storage .................. ..................... 10
4.3 Disposal ................ ....................... 10
5 Setup and connection .............................. 11
5.1 Preparing for installation .................... 11
5.1.1 Checking the operating conditions for the
ETLB-S ....................................... 11
5.1.2 Checking the operating conditions for the
ETLB-ST ...................................... 11
5.1.3 Preparing the installation site ............... 12
5.1.4 Surface preparation .......................... 12
5.2 Setting up .............................. ....... 12
5.3 Planning pipelines ............................ 12
5.3.1 Specifying supports and Àange
connections ................................... 12
5.3.2 Specifying nominal widths ................... 12
5.3.3 Optimizing changes of cross section and
direction ..................................... .. 12
5.3.4 Providing sa fety and control devices
(recommended) ............... ............... 12
5.4 Fitting the accessory part ............. ....... 13
5.4.1 Preparing the accessory part ................ 13
5.4.2 Checking the operating conditions for the
accessory part ...... .......................... 13
5.4.3 Fitting the accessory part .................... 13
5.5 Connecting the pipes ......... ............... 14
5.5.1 Keeping the piping clean .................... 14
5.5.2 Installing the pressure pipe ..... ............. 14
5.5.3 Inspection for stress-free pipe
connections ................................... 14
5.6 Electrical connection ....... .................. 15
5.6.1 Connecting the motor ........................ 15
5.6.2 Connecting the thermistor ................... 15
5.6.3 Check direction of rotation ................. .. 15
5.7 Performing the hydrostatic test .............. 15
6Operation ............... ............................. 16
6.1 Preparing for commissioning ................ 16
6.1.1 Check downtimes ............................ 16
6.1.2 Filling and bleeding .......................... 16
6.2 Commissioning ............................... 16
6.2.1 Switching on ........ .......................... 16
6.2.2 Switching off .............................. .... 17
6.3 Shutting down the pump ........ ............. 17
6.4 Restoring the pump to service .... .......... 18
6.5 Operating the stand-by pump ............... 18
7 Maintenance .................. ....................... 19
7.1 Inspections . .................................. 19
7.2 Servicing ...................................... 19
7.2.1 Maintenance in accordance with maintenance
schedule ...................................... 19
7.2.2 Cleaning the pump ......... .................. 19
7.3 Dismounting .................................. 20
7.3.1 Preparations for dismounting ................ 20
7.3.2 Disassembly of spiral casing ................ 21
7.4 Replacement parts and return .............. 21
7.5 Installing ................. ..................... 22
8Troubleshooting ................................ .... 23
9Appendix............................................. 25
9.1 Replacement parts ........................... 25
9.1.1 Part numbers and designations . . . . . . . . . . . . . 25
9.1.2 Sectional drawings ........................... 26
9.2 Technical speci¿cations ...................... 31
9.2.1 Ambient conditions ................. .......... 31
9.2.2 Sole plate tightening torques . . . . . . . . . . . . . . . . 31
9.2.3 Tightening torques of casing screws . . . . . . . . 31
9.2.4 Filling heights and installation
dimensions .................... ............... 31
9.2.5 Flange tightening torques ...... ............. 31
9.2.6 Permissible forces at the pressure
socket ......... ................................ 31
9.2.7 Sound pressure level ...... .................. 32
9.3 Maintenance schedule ....................... 32
9.4 Declaration of conformity in accor
dance with
EC machinery directive ...................... 33
2 ETLB-S, ETLB-ST BA-2018.01.25 EN 301 356