Storage Battery Systems SBS SBS-2415S Manual

SBS-S SERIES DC LOAD BANK
USER MANUAL
Rev. 2.0 12-14
99 Washington Street Melrose, MA 02176
Phone 781-665-1400 Toll Free 1-800-517-8431
Visit us at www.TestEquipmentDepot.com
Contents
OPERATING INSTRUCTIONS
1. Environment Requirement
2. Main Tester Description
3. Main Tester Connection
4. Starting Up and Input Operation
5. Parameter Setting
6. Start Discharge
7. Discharge Stop
8. Test Result
9. Calibration Interface
10. Parallel Operation
PRECAUTIONS
AFTER-SALE SERVICE
Cooling fans
LCD screen
Buttons
External control
socket
External current
measurement
socket
Power switcher
(For 4815S/4830S)
Power switcher &
AC power input
(For other types)
Power cable
sockets
SBS-S series
OPERATING INSTRUCTIONS
1. Environment Requirement
The unit should only be used in environments that are free from dust and flammable or explosive gases. The environment should be properly ventilated to dissipate heat produced.
2. Main Tester Description
3. Main Tester Connection
3.1 Power cable connection
Connect SBS-S to the battery group (or rectifier, DC generator)
1 / 8
Loading...
+ 7 hidden pages