Sterling VERSA-LINE, JVB-2PM, JVB-PM Installation Instructions Manual

INSTALLATION INSTRUCTIONS
VERSA-LINE
COMMERCIAL FINNED-TUBE RADIATION
JVB-PM/2PM
STPM-II-2
Pedestal mounted enclosure is not recommended for use with steam systems.
1. Per the mechanical drawings, layout the pedestal brackets based on the enclosure lengths of the run. For enclosures 2'-0" to 5'-0" lengths, two (2) brackets will be required. These brackets should start and end 6" to 12" in from each end of the enclosure. For enclosures 5'-6" to 8'-0" lengths, three (3) brackets will be required. The third bracket will be centered between the two outer brackets.
2. Once the bracket locations along the run have been
determined, secure them to the oor with the specied
fasteners (by others). The rear vertical bracket leg should
be a minimum of 2" from the wall. Depending on the atness of the nished oor, it has to be determined which (if any) of
the brackets need to be shimmed to allow for a level and straight enclosure installation. An enclosure support bar will be installed between the two vertical legs of the pedestal bracket after the element(s) have been installed.
3. Locate nned tube element where identied on mechanical
drawings. Place element slide cradle supports onto element where brackets are located. The legs of the element cradles are tapered slightly outward so that a friction or
compression t will occur and hold them in place when pressing the cradles into place between the element ns.
Place element and element slide cradles onto the ball bearings in the bracket and make sweat connections. For
steel element, apply specied pipe dope or sealing tape for threaded connections with the required threaded ttings. Check submittal drawings to conrm dimension out from wall to center of element and up from nished oor. Once
the elements are connected into the heating system, a standard pressure leak test should be conducted as
specied by the Mechanical Engineer. For copper tube
elements, ush the loop or series with system water after soldering to neutralize the remaining ux material and prevent corrosive action and resulting pinhole leaks.
4. When the enclosure run is laid out wall to wall with the supply and return tube running through the wall, it is typical
to start and nish the run of enclosure with a “Wall Sleeve".
This over lapping accessory provides for make-up in the run where the wall-to-wall dimension does not coincide with the standard enclosure lengths. The slip-jointed enclosures interlock with each other along the run. Inside or outside corners are universal with the pedestal style enclosure.
5. When enclosure is installed short of wall with supply and
return lines coming out of the oor, end caps will be used to
terminate the enclosure run at each end. For JVB-PM & 2PM enclosures, the end caps provided are either left hand or right hand and interlock with the enclosure slip-joints.
6. If access is needed to air vents or shut off valves, it is recommended that a two (2) foot piece of enclosure is installed in the run where the device is located. This piece of enclosure will act as a valve compartment or access panel.
MAINTENANCE
Before each heating season, remove accessories and
enclosure panel to inspect nned tube elements for
accumulation of dust or other debris that may accumulate and
block airow between ns. Remove dust and debris from coil ns with a vacuum cleaner or compressed air. Inspect for leaks
or areas of corrosion. It should not be required, but if necessary, place a drop of lubricant (machine oil) onto each ball bearing (where applicable) located in the water brackets or bracket
mounted hangers. Replace cover and accessories.
7/18
260 North Elm St., Westeld, MA 01085 Tel: (413) 564-5535 Fax: (413) 562-8437 www.sterlingheat.com
PM
GENERAL LAYOUT
2PM