Sterling JVB-PM, JVB-2PM Installation Instructions Manual

INSTALLATION INSTRUCTIONS
VERSA-LINE
COMMERCIAL FINNED-TUBE RADIATION
JVB-PM/2PM
STPM-II-1
Pedestal mounted enclosure is not recommended for use with steam systems.
1. Per the mechanical drawings, layout the pedestal brackets based on the enclosure lengths of the run. For enclosures 2'-0" to 5'-0" lengths, two (2) brackets will be required. These brackets should start and end 6" to 12" in from each end of the enclosure. For enclosures 5'-6" to 8'-0" lengths, three (3) brackets will be required. The third bracket will be centered between the two outer brackets.
2. Once the bracket locations along the run have been determined, secure them to the fl oor with the specifi ed fasteners (by others). The rear vertical bracket leg should be a minimum of 2" from the wall. Depending on the fl atness of the fi nished fl oor, it has to be determined which (if any) of the brackets need to be shimmed to allow for a level and straight enclosure installation. An enclosure support bar will be installed between the two vertical legs of the pedestal bracket after the element(s) have been installed.
3. Locate fi nned tube element where identifi ed on mechanical drawings. Place element slide cradle supports onto element where brackets are located. The legs of the element cradles are tapered slightly outward so that a friction or compression fi t will occur and hold them in place when pressing the cradles into place between the element fi ns. Place element and element slide cradles onto the ball bearings in the bracket and make sweat connections. For steel element, apply specifi ed pipe dope or sealing tape for threaded connections with the required threaded fi ttings. Check submittal drawings to confi rm dimension out from wall to center of element and up from fi nished fl oor. Once the elements are connected into the heating system, a standard pressure leak test should be conducted as specifi ed by the Mechanical Engineer. For
copper tube elements, fl ush the loop or series with system water after soldering to neutralize the remaining fl ux material and prevent corrosive action and resulting pinhole leaks.
4. When the enclosure run is laid out wall to wall with the supply and return tube running through the wall, it is typical to start and fi nish the run of enclosure with a “Wall Sleeve". This over lapping accessory provides for make-up in the run where the wall-to-wall dimension does not coincide with the standard enclosure lengths. The slip-jointed enclosures interlock with each other along the run. Inside or outside corners are universal with the pedestal style enclosure.
5. When enclosure is installed short of wall with supply and return lines coming out of the fl oor, end caps will be used to terminate the enclosure run at each end. For JVB-PM & 2PM enclosures, the end caps provided are either left hand or right hand and interlock with the enclosure slip-joints.
6. If access is needed to air vents or shut off valves, it is recommended that a two (2) foot piece of enclosure is installed in the run where the device is located. This piece of enclosure will act as a valve compartment or access panel.
MAINTENANCE
Before each heating season, remove accessories and enclosure panel to inspect fi nned tube elements for accumulation of dust or other debris that may accumulate and block airfl ow between fi ns. Remove dust and debris from coil fi ns with a vacuum cleaner or compressed air. Inspect for leaks or areas of corrosion. It should not be required, but if necessary, place a drop of lubricant (machine oil) onto each ball bearing (where applicable) located in the water brackets or bracket mounted hangers. Replace cover and accessories.
260 NORTH ELM ST., WESTFIELD, MA 01085
COMMERCIAL HYDRONIC PRODUCTS
10/09
TEL: (413) 568-9571 FAX: (413) 562-8437
GENERAL LAYOUT