Installation & Operating Instructions
®
®
C
Steambath Control Models: TSC-250 & TSC-250R
Important: Locate Publication No. 199 “Steam Bath Important Safety Instructions”. This publication includes a Warning
label that the contractor must install on the wall near the entrance to the steam room in a highly visible location. This
label and its additional safety information are packaged with the generator in the envelope containing the installation
!
instructions. If it is lost or missing contact Steamist (201-933-0700) for a replacement Publication No. 199. This publication along with all documents must be left with the owner.
Control Features
1. Display: The digital readout displays the ambient temperature,
set point and cycle time, system status, and diagnostic error
codes.
2. Steam Icon: When illuminated the steam cycle is running.
3. Water Icon: When steam shower is not in use the blue water
icon indicates the **InstaMist feature is on. This is also illuminated during a steam bath cycle.
4. Menu button: Used to change cycle time, turn **InstaMist on or
off and switch between ºF and ºC. When steam is off, pressing
this button will toggle between these settings. The settings are
changed with the up/down arrow buttons.
( *New for 2017 )
Cleaning Instructions: Use a damp cloth and mild soap. Do
NOT use abrasive cleaners which might scratch the surface
or the base of the control.
*If your model TSC-250 control does not match the picture
below, please see Pub. No. 271-D.
**InstaMist option is ONLY available when connecting to a
“TSG” model steam generator (InstaMist function is not
available on the “SMP” models). InstaMist is a preheat
function that keeps the water heated for quick starts.
TSC-250R (Round control)
5. Stop button: Pressing this button stops the current steam cycle
and the Menu mode.
6. User 1 button: Starts the user one cycle and is the up function
when changing Menu settings. Pressing this button while in a
cycle will change the temperature and remaining time left on
that cycle.
7. User 2 button: Starts the user two cycle and is the down
function when changing Menu settings. Pressing this button
while in a cycle will change the temperature and remaining time
left on that cycle.
MENU
__
__
__
__
STOP
21
X
US
IMPORTANT: This control must be installed inside the steam room
for proper operation of the system and will ONLY function with TSG
and SMP model steam generators.
TSC-250 Digital Temperature Control ( 2017 Model )
TSC-250 Digital Temperature Control
1
4
6
03/17
MENU
__
__
__
__
21
STOP
X
- 1 -
2
3
5
7
Pub. No. 271-E

Installation Instructions
1.
Pre-Installation - Control Location
a) The TSC-250 Control must be installed inside the
steam room. For convenience the recommended height
from the floor is four feet. Provide a 1½" hole in the wall
at this location (see Figure 1).
IMPORTANT: Multi-conductor cable must be installed
so that the end will not be buried inside the wall. The
unit will not operate unless the control is installed.
2. Electrical Rough-in
a) Locate the multi-conductor cable. Carefully route the
multi-conductor control cable from the steam generator
to the TSC-250 located inside the steamroom (see
Figure 1). Route multi-conductor cable through a ¾"
conduit to protect the cable from damage and to
facilitate replacement if necessary.
3. Control and Cable Installation
a) Locate the previously installed cable and black plastic
strain relief clamp which is in the control packing box.
Locate the knockout on the steam generator for the
control cable (see Figure 3).
b) Place strain relief around cable about seven inches
from the end and insert into the hole. Remove the
protective covering labeled “Remove Before Installation” from the modular jack found on the PC board.
c) Remove the protective cap from the multi-conductor
cable plug. Connect the cable to the modular jack.
d) Close and secure generator cover.
e) Locate Telco Jack at female coupler, on back of the
TSC-250 control. Remove the protective covering
labeled “Remove Before Installation”. Remove protec-
tive cap from cable and plug into jack. Check that the
orientation of the plug properly aligns with the jack. A
snap will indicate the plug is installed correctly (see
Figure 3).
IMPORTANT: Test the control for operation before
continuing on to the next step.
f) Peel adhesive liner from back of the control. Apply the
control to the wall. Press firmly and hold for a few
seconds.
g) After the control is in place, apply silicone (supplied)
around the control to form a watertight seal (see Figure
2).
Installation & Operating Instructions
Figure 1
IMPORTANT: Run the
Control Cable through
a ¾” conduit.
To Steam Generator
Inside Installation:
TSC-250 Control.
Locate away from the
Coupler
direct line of shower
spray and do NOT
1½“ Hole
located four feet
from the floor
Double-Sided
Adhesive Pad
STOP
2
MENU
1
__
X
__
__
__
Figure 2
M
A
D
E
eN
t
1
/
2
NI
LC
E
.U
LF
.S
O .
RA
A
02513 .oN metI
.
.Z
ENOCILIS
Coupler
Control Cable
to Generator
Adhesive Liner
IMPORTANT: The adhesive on the back of the TSC-250 control
will NOT seal this control. It is the responsibility of the installer to
seal this control to the wall with the supplied silicone. Water
damage to the control is not covered by the warranty.
Figure 3 - Cable Installation on Steam Generator
¾" Conduit
To Control
03/17
Modular Jacks:
All modular jacks are
identical and work in
any combination.
Connect to any jack.
- 2-
Pub. No. 271-E