Steamist TSC, TSC-350 Installation Instructions Manual

®
Installation Instructions
®
®
C
LISTED 995C
US
Steambath Control
Control Features
1. Set Point: Indicates steamroom setpoint temperature.
2. Temperature Display: Indicates ambient room temperature.
3. ON/OFF Keypad: Press keypad to start the system as a
guest user. Press the Keypad any time the system is on to turn it off.
4. Navigation Keys: UP/Down Arrows, Menu, and Select.
5. User 1 / User 2: Press to select Pre-Set user settings.
6. Clock: Displays current time.
7. Duration: Remaining time of the system cycle.
IMPORTANT: Control must be installed inside the steam- room
for proper operation of the system. Cleaning Instructions: Use a damp cloth and mild soap. Do
NOT use abrasive cleaners which might scratch the surface or the base of the control.
Total Sense Digital Control
6
03 : 38 : 17 112
STEAM
°
112
5
12
^
4
7
110
^
^
SELECT
MENU
Model: TSC
1
°
°
F
^
^
2
^
3
Installation Instructions
1. Pre-Installation - Control Location
The TSC Control must be installed inside the steam- room. For convenience the recommended height from the floor is four feet. Provide a 1½" hole in the wall at this location (see Figure 1).
IMPORTANT: Multi-conductor cable must be installed so that the end will not be buried inside the wall. The unit will not operate unless the control is installed.
2. Electrical Rough-in
Remove the multi-conductor cable from the control packing box. Carefully route the multi-conductor control cable from the steam generator to the TSC located inside the steam­room (see Figure 1). Route multi-conductor cable through a ¾" conduit to protect the cable from damage and to facilitate replacement if necessary.
WARNING: Elderly persons, pregnant women, or those suffering from heart disease, high blood pressure, diabetes, or who are otherwise not in good health, do not use this device unless directed to do so by a physician. Also, do not use
!
steambath while under the influence of alcohol.
Figure 1
IMPORTANT: Run the Control Cable through a ¾” conduit.
1½“ Hole
located four feet
from the floor
To Steam Generator
Double-Sided Adhesive Pad
Coupler
IMPORTANT: The TSC Control will only function with one of the following Steamist Generator models: TSG-7, TSG-10 or TSG-15 steam generators.
02/09
- 1 -
Pub. No. 202-A
Installation Instructions
Installation Instructions Model: TSC
3. Control and Cable Installation
a) Locate the previously installed cable and black plastic
strain relief clamp which is in the control packing box. Locate the knockout on the steam generator for the control cable (see Figure 1).
b) Place strain relief around cable about seven inches from
the end and insert into the hole. Remove the protective covering labeled “Remove Before Installation” from the modular jack found on the PC board.
c) Remove the protective cap from the multi-conductor
cable plug. Connect the cable to the modular jack. d) Close and secure generator cover. e) Locate Telco Jack at female coupler, on back of the
TSC control. Remove the protective covering labeled
“Remove Before Installation”. Remove protective cap
from cable and plug into jack. Check that the orientation
of the plug properly aligns with the jack. A snap will
indicate the plug is installed correctly (see Figure 2). WARNING: Test the control for operation before
continuing on to the next step. f) Peel adhesive liner from back of the control. Apply the
control to the wall. Press firmly and hold for a few
seconds. g) After the control is in place, apply silicone (supplied)
around the control to form a watertight seal.
Figure 3
Figure 4
N I
. U . S
A .
Coupler
Adhesive Liner
Control Cable
to Generator
M A
I t
D
e
e N
E
t 1 /
o N m
2
L C
.
L F
1 3
A E
O .
R
0 2 5
Z .
E N O C I L I S
Figure 2 - Cable Installation on Steam Generator
¾" Conduit
To Control
Modular Jacks:
All four modular jacks are
identical and will work in
any combination.
Connect into any jack.
IMPORTANT: The adhesive on the back of the TSC control will NOT seal this control. It is the responsibility of the installer to seal this control to the wall with the supplied silicone. Water damage to the control is not covered by the warranty.
Knockouts for
Strain Relief
Clamps
Relay
Board
Power Board
Fuses
Ground
Connection
02/09
- 2 -
Pub. No. 202-A
Installation Instructions
Installation Instructions Model: TSC
Installation Instructions for Steamhead & Center Hub
1. Make sure the 3/4" nipple protrudes beyond the tile
approximately 1/2" (see Figure 5).
2. Wrap the nipple with pipe sealant tape.
3. Put a bead of silicone around the outer edge of the Back
Plate (see Figure 5) and center the Back Plate over the pipe in an upright position. While holding it in place screw the Center Hub onto the nipple, using a " Hex Key to tighten.
4. The Center Hub MUST be aligned with the four walls in the
vertical and horizontal position (see Figure 6). Make sure the steamhead O-ring is fully seated into the Back Plate. If the nipple is sticking out too far the O-ring will not make a proper seal and the nipple must be adjusted.
5. Apply a small amount of silicone at the back center point of
the Cover Plate. This will aid in preventing movement of this plate (see Figure 6).
6. Place the Cover Plate over the Center Hub. This is accom-
plished by first hooking the top and then snapping the bottom into place.
7. Adjust the Back Plate and Cover Plate to line up squarely,
and clean excess silicone with rubbing alcohol.
Figure 6 - Center Hub Installation
Apply a small
amount of silicone to
prevent
movement
IMPORTANT:
Install top first
MUST be vertical
After inserting the top,
snap in the bottom
Figure 5 - Steamhead Installation
3/4" NPT (Brass Pipe) Must use sealant tape
Apply silicone around
the steam pipe to form a
watertight seal
1/2"
Back Plate
Aromatherapy
Reservoir
Center Hub
Apply silicone around
the back edge of Back
Plate to seal and
prevent movement
O-Ring MUST
seal to inside of
the Back Plate
3/8" Hex Key
Hole
Cover Plate
02/09
- 3 -
Pub. No. 202-A
Loading...
+ 7 hidden pages