Installation and Operating Instructions
WARNING: Elderly persons, pregnant women, or those suffering from heart disease, high blood
!
IMPORTANT: the TC-135 Control will only function with one of the following Steamist Generator models: SM-46,
SM-79, SM-4, SM-5, SM-7, SM-8, SM-11, SM-12, SM-15, System-18, System-24, System-30.
IMPORTANT: This control must be installed inside the
3
5
6
Cleaning Instructions: Use a damp cloth and mild soap.
Do NOT use abrasive cleaners which might scratch the
surface or the base of the control.
pressure, diabetes, or who are otherwise not in good health, do not use this device unless directed
to do so by a physician. Also, do not use steambath while under the influence of alcohol.
Control Features
1.
Temperature Display: Indicates steam room or set
steam room for proper operation of the system.
TEMP CONTROL
SET
TEMP
START
STOP
TC-135
Digital Temperature Control
1
4
2
point temperature.
2.
Start/Stop Key Pad: Press key pad and generator will
begin producing steam in a few minutes. The generator
will remain on for 30 minutes when used with the
models SM-46, SM-79, SM-4, SM-5, SM-7, or SM-8
steam generators and 60 minutes for larger generators.
Pressing the key pad a second time will stop the Steam
Generator.
Heat Icon: Indicates the generator is producing steam
3.
when illuminated. The heater in the generator and the
heat icon will cycle on and off as the temperature is
maintained automatically in the steam room.
Temperature icon: Indicates the set temperature has
4.
been reached and the heater in the generator is off.
This icon will cycle on and off opposite that of the heat
icon.
Set Temperature Key Pad: Press to display the set
5.
point.
Up/Down Key Pads: Press to adjust the temperature
6.
set point.
Installation Instructions
1. Pre-Installation - Control Location
a)
The TC-135 control must be installed inside the
steam room. For convenience the recommended
height from the floor is four feet. Provide a 1½” hole in
the wall at this location (see Figure 1).
IMPORTANT: Multi-conductor cable must be
installed so that the end will not be buried inside the
wall. The unit will not operate unless the control is
2. Electrical Rough-in
a)
Remove the multi-conductor cable from the control
packing box. Carefully route the multi-conductor
control cable from the Steambath Generator to the
TC-135 located inside the steamroom (see Figure 2).
Route multi-conductor cable though a ¾” conduit to
protect the cable from damage and to facilitate
replacement if necessary.
06/07
IMPORTANT: Run the
Control Cable through
a ¾” conduit.
1½“ Hole
located four feet
from the floor
- 1 -
Figure 1
TC-135 Digital
Temperature Control
Coupler
Double-sided
Adhesive Pad
Pub. No. 554- E

3. Control and Cable Installation
a)
Locate the previously installed cable and black plastic
strain relief clamp which is in the control packing box.
Locate the knock-out on the steam generator for the
control cable (see Figure 2).
b)
Place strain relief around cable about seven inches
from the end and insert into the hole. Remove the
protective covering labeled, “Remove before
installation,” from the modular jack found on the PC
c)
board.
If TC-135 is used in conjunction with the optional
TC-110 control or Dual System, plug the splitter into
the modular jack, this will allow two cables to be
plugged into the PC board (see Figure 2).
IMPORTANT: When used with the Optional TC-110
control or Dual System, the Steamist supplied splitter
must be used. Locally purchased telephone splitters
will NOT work and void the warranty.
d)
Remove the protective cap from the multi-conductor
e)
cable plug. Connect the cable to the modular jack.
f)
Close and secure generator cover.
Locate Telco Jack at female coupler, on back of the
TC-135 control. Remove the protective covering
labeled “Remove before Installation”. Remove
protective cap from cable and plug into jack. Check
that the orientation of the plug properly aligns with the
jack. A snap will indicate the plug is installed
correctly (see Figure 2).
Figure 3
Coupler
Adhesive Liner
Control Cable
to Generator
g)
Peel adhesive liner from back of the control. Apply
the control to the wall. Press firmly and hold for a few
seconds.
h)
After the control is in place, apply silicone (supplied)
around the control to form a water tight seal.
M
A
I
t
D
N
e
m
e
E
t
N
I
1
C
N
/
o
2
L
.
U
F
3
E
L
1
.
A
S
.
5
O
2
.
R
A
0
Z
.
.
S
LI
I
C
O
N
E
Figure 4
WARNING: Test the control for operation before
continuing on to the next step.
¾“ Conduit
Multi-conductor
Control Cable
To Control
Steamist splitter
supplied with Optional
TC-110 control or Dual
System.
Protective Covering
“Remove Before
Installation”
Modular Jack
(25 feet)
IMPORTANT: The adhesive on the back of the
TC-135 control will NOT seal this control. It is the
responsibility of the installer to seal this control to the
wall with the supplied silicone. Water damage to the
control is not covered by the warranty.
Knock-outs for
Strain Relief
Clamps
Printed
Circuit Board
06/07
Figure 2
Cable Installation
on Steam Generator
Pub. No. 554-E- 2 -