Steamist TC-135 Installation And Operating Instructions Manual

Steambath Control
Model: TC-135
®
LISTED 995C
US
Installation and Operating Instructions
WARNING: Elderly persons, pregnant women, or those suffering from heart disease, high blood
!
IMPORTANT: the TC-135 Control will only function with one of the following Steamist Generator models: SM-46, SM-79, SM-4, SM-5, SM-7, SM-8, SM-11, SM-12, SM-15, System-18, System-24, System-30.
IMPORTANT: This control must be installed inside the
3
5
6
Cleaning Instructions: Use a damp cloth and mild soap. Do NOT use abrasive cleaners which might scratch the surface or the base of the control.
pressure, diabetes, or who are otherwise not in good health, do not use this device unless directed to do so by a physician. Also, do not use steambath while under the influence of alcohol.
Control Features
1.
Temperature Display: Indicates steam room or set
steam room for proper operation of the system.
TEMP CONTROL
SET
TEMP
START
STOP
TC-135
Digital Temperature Control
1
4
2
point temperature.
2.
Start/Stop Key Pad: Press key pad and generator will begin producing steam in a few minutes. The generator will remain on for 30 minutes when used with the models SM-46, SM-79, SM-4, SM-5, SM-7, or SM-8 steam generators and 60 minutes for larger generators. Pressing the key pad a second time will stop the Steam Generator. Heat Icon: Indicates the generator is producing steam
3. when illuminated. The heater in the generator and the heat icon will cycle on and off as the temperature is maintained automatically in the steam room. Temperature icon: Indicates the set temperature has
4. been reached and the heater in the generator is off. This icon will cycle on and off opposite that of the heat icon. Set Temperature Key Pad: Press to display the set
5. point. Up/Down Key Pads: Press to adjust the temperature
6. set point.
Installation Instructions
1. Pre-Installation - Control Location
a)
The TC-135 control must be installed inside the steam room. For convenience the recommended height from the floor is four feet. Provide a 1½” hole in the wall at this location (see Figure 1).
IMPORTANT: Multi-conductor cable must be installed so that the end will not be buried inside the wall. The unit will not operate unless the control is
2. Electrical Rough-in
a)
Remove the multi-conductor cable from the control packing box. Carefully route the multi-conductor control cable from the Steambath Generator to the TC-135 located inside the steamroom (see Figure 2). Route multi-conductor cable though a ¾” conduit to protect the cable from damage and to facilitate replacement if necessary.
06/07
IMPORTANT: Run the Control Cable through a ¾” conduit.
1½“ Hole
located four feet
from the floor
- 1 -
Figure 1
TC-135 Digital
Temperature Control
Coupler
Double-sided
Adhesive Pad
Pub. No. 554- E
3. Control and Cable Installation
a)
Locate the previously installed cable and black plastic strain relief clamp which is in the control packing box. Locate the knock-out on the steam generator for the control cable (see Figure 2).
b)
Place strain relief around cable about seven inches from the end and insert into the hole. Remove the protective covering labeled, “Remove before installation,” from the modular jack found on the PC
c)
board. If TC-135 is used in conjunction with the optional TC-110 control or Dual System, plug the splitter into the modular jack, this will allow two cables to be plugged into the PC board (see Figure 2).
IMPORTANT: When used with the Optional TC-110 control or Dual System, the Steamist supplied splitter must be used. Locally purchased telephone splitters will NOT work and void the warranty.
d)
Remove the protective cap from the multi-conductor
e)
cable plug. Connect the cable to the modular jack.
f)
Close and secure generator cover. Locate Telco Jack at female coupler, on back of the TC-135 control. Remove the protective covering labeled “Remove before Installation”. Remove protective cap from cable and plug into jack. Check that the orientation of the plug properly aligns with the jack. A snap will indicate the plug is installed correctly (see Figure 2).
Figure 3
Coupler
Adhesive Liner
Control Cable
to Generator
g)
Peel adhesive liner from back of the control. Apply the control to the wall. Press firmly and hold for a few seconds.
h)
After the control is in place, apply silicone (supplied) around the control to form a water tight seal.
M
A
I t
D
N
e
m
e
E
t
N
I
1
C
N
/
o
2
L
.
U
F
3
E
L
1
.
A
S
.
5
O
2
.
R
A
0
Z
.
.
S
LI
I
C
O
N
E
Figure 4
WARNING: Test the control for operation before
continuing on to the next step.
¾“ Conduit
Multi-conductor
Control Cable
To Control
Steamist splitter
supplied with Optional
TC-110 control or Dual
System.
Protective Covering
“Remove Before
Installation”
Modular Jack
(25 feet)
IMPORTANT: The adhesive on the back of the TC-135 control will NOT seal this control. It is the responsibility of the installer to seal this control to the wall with the supplied silicone. Water damage to the control is not covered by the warranty.
Knock-outs for
Strain Relief
Clamps
Printed
Circuit Board
06/07
Figure 2
Cable Installation
on Steam Generator
Pub. No. 554-E- 2 -
Loading...
+ 2 hidden pages