The Steamist “SM” Generator operates with one or two controls
appropriately located inside and/or outside the steamroom. It’s
small enough in size to be tucked away using very little space in
a vanity, closet, basement, or an insulated attic, but large enough
to provide steam for most residential baths.
The Steamist “SM” Steambath Generator comes factory
assembled, carefully wired and tested.
NOTE: The SMC-120, SMC-150, TC-125, TC-150, TC-110,
TC-135, DSC-425, and DSP Controls are designed to work with
all Steamist “SM” Generators.
1. Pre-Installation
a) Proper electrical supply (208 or 240 Volt): See rating label
on Steam Generator and Chart on back page. Determine
proper size of wire, voltage, amperage, and phase for the
Steam Generator. Only UL rated 90°C wire can be used.
b) Dedicated overcurrent protection device, such as an
in-line fuse/circuit breaker required: Fuse/circuit breaker
to be installed must be sized in accordance with chart
on back page. Do NOT install a GFI (Ground Fault
Interrupter) to this equipment (per article 210-8 in the
National Electric Code).
c) Route power supply cable to the location where the
Steam Generator will be installed (before walls are
closed).
2. Electrical Rough-in
a) At this time read through the installation instructions for
the selected control(s).
b) Route appropriate power cable to the location the
Steam Generator will be installed. If receptacle is
desired, mount the box for the receptacle near the
location of the Steam Generator (see Figure 3: Typical
Installation).
NOTE: The plug and receptacle require a rating of no
less than 250V and proper amperage. Refer to chart on
page 4 for amperage rating.
After the walls are complete, the Steam Generator and
Control can be wired.
3.Steam Generator Electrical Installation
WARNING: All power to the Steam Generator must be turned off.
a) Remove the two screws holding the electrical access
cover and remove cover.
b) Locate the supply line knockout. Mount proper
strain relief into knockout hole (see Figure 2:
Internal Electrical Connections).
c) Strip back power cable’s outer insulation jacket
eight inches and insert into Steam Generator.
Strip back insulation ½" from the three (3)
incoming wires (two power and one ground).
d) Connect incoming ground wire to floating green
pigtail labeled “GND.”
CAUTION: Be sure the ground wire does not
come in contact with a live electrical part.
e) Connect incoming power to floating black pigtail
leads labeled “L1” and “L2” (see Figure 2: Internal
Electrical Connections).
f) The Steam Generator is ready for operation once
the installation of the controls is completed (refer to
separate Installation and Operating Instructions).
4. Optional Auto Drain Valve Connection
a) Open knockout for Auto Drain Valve conduit
connection.
b) Route flexible conduit from valve to knockout
and secure.
c) Connect two wires from valve to the two place
terminal strip provided (see figure 2).
Figure 1 - Steam Generator
Knockouts for
Electrical
Panel Cover
Install Upright
and Level
Control Cable
Knockouts for
Electrical
Supply Line
Water Inlet
⅜" Compression
Fitting
¾" Safety
Relief Valve
¾" Steam
Outlet
Optional Auto
Drain Installed
Model SM-900
WARNING:Elderly persons, pregnant women, or those suffering from heart disease, high blood pressure, diabetes, or
who are otherwise not in good health, do not use this device unless directed to do so by a physician. Also, do not use
steambath while under the influence of alcohol. For additional Important Safety Information, please see a separate
!
instruction Pub. No. 199.
IMPORTANT: The warranty of this product is voided if it is used in a commercial application or for anything other than a residential
steambath installation. All electrical connections must be performed by a licensed electrician in accordance with Local and National
Electric Codes. This product is not intended for use with Home Automation systems.
06/10
- 1 -
Pub. No. 323-L
Page 2
Electrical Installation Instructions
ChecklistModels: SM-12 and SM-15
Before starting, insure that the conditions of the following checklist have been met:
The proper size Steam Generator has been selected by
using the sizing page in the “Full Line Brochure,” “Pricing
Guide,” or “The Generator Sizing Guide” in the Residential Systems/Steambath Product Information section of
the Steamist website - www.steamist.com.
CAUTION: An improperly sized Steam Generator will
NOT produce the amount of steam necessary to reach
selected temperature.
The proper voltage Steam Generator has been selected
(i.e., 208V or 240V). A 208V Generator operating on
240V will damage the heating element, and a 240V
Generator operating on 208V will result in a 25%
loss of power.
Figure 2 - Internal Electrical Connections
Optional Steamist Splitter
for Two Controls
Protective Covering
Plug
“Remove Before
Installation”
The Steam Generator is installed in an upright position.
The proper sized 90°C wire and circuit breaker have
been used.
The circuit breaker is NOT a GFI (Ground Fault
Interrupter) type.
The Steam Generator is properly grounded.
The circuit breaker or disconnect switch is on.
Water supply is open to the Steam Generator.
Power Supply
L1 and L2
Water
Level
Probe
Printed
Circuit
Board
Modular Jack
Test Switch
Ground
Contactor/Relay
Single Phase
Connections Shown
Water Inlet
⅜" Compression
Fitting
¾" Steam
Outlet
Safety
Relief
Valve
Knockout
for Auto Drain
Terminal Strip
for Auto Drain
Connection
06/10
Optional Auto
Drain Connection
- 2 -
½" Outlet
When not equipped
with Auto Drain leave
drain line capped
and closed
Pub. No. 323-L
Page 3
®
Electrical Installation Instructions
Figure 3 - Typical InstallationModels: SM-12 and SM-15
The Electrical Instructions must be given to the homeowner for future use.
NOTE: Unit must be wired with 90°C wire
in a suitable raceway, or, if local codes
allow, provide twist lock plug on a 90°C
wire cord from generator to a 250V
2-pole, 3-wire grounding receptacle
(amperage rating as required).
Inside Installation
Control should be mounted four
feet from the floor. Select a
location convenient to the
bather but not in a direct line of
SMC-120 or TC-125
Auxilary Outside
Control
Shower or Body Sprays and not
directly above the Steamhead.
START
STOP
Appropriately
fuse protected
208/240V field
wiring to Steam
Generator.
Control Cable
Route from
Control to Steam
Generator in a
¾" conduit.
WARNING
HOLD THIS FITTING SECURELY WITH A PIPE
WRENCH WHILE MAKING A PLUMBING
CONNECTION TO THE WATER INLET IN ORDER
TO PREVENT INTERNAL DAMAGE TO THE WATER
SOLENOID VALVE.
009-1054
STEAMBATH GENERATOR
MODEL NO.
®
US
C
SERIAL NO.
LISTED 995C
HEATER LOAD
VOLTS PH MAX AMPS kW
CONTROL CIRCUIT
50/60 HZ
VOLTS AMPS
SERVICE BY AUTHORIZED PERSONNEL ONLY
A PRODUCT OF STEAMIST CO., RUTHERFORD, NJ
SMC-150 or TC-150
Control MUST be
installed inside the
steam room.
TEMPERATURE
START
STOP
IMPORTANT: Run the Control Cable through a ¾" conduit. Remove protective cap when making the
final connection to Control.
06/10
- 3 -
Pub. No. 323-L
Page 4
®
®
Electrical Installation Instructions
SM-12/15 Single Phase SchematicModels: SM-12 and SM-15
GND
Field
L1
Connections**
L2
TEMPERATURE
START
STOP
Typical Steamist
Control
Water
Level
Probe
(Low Voltage)
Multi-Conductor
Cable*
TANK
LLC-1300-3 Circuit Board
P13
P4
L
P3
P5
YEL
H
XL
P6
P8
RED
WHT
GREY
Elements
P1
P2
RED
Heating
DS1
DS2
P7
YEL
DS3
See
Chart
DS4
Fuse 0.15 AMP
P9
Test
P18
P17
GND
P14
P11
P12
NOTES: *Supplied with Controller.
GRN
P10
GND
BRN
RED
BLU
BLU
GRN
**Field Connections, use 90ºC wire, gauge no. See Chart Copper.
P16
Switch
P15
Fuse Block
ORG
Water
Solenoid
Valve
Terminal
Block
RED
ORG
Auto Drain
Thermostat
Contactor/Relay
L1
L2
COIL
L3
L4
Noise
Filter
BLK
BLK
Optional
Auto Drain
Valve
T1
T2
T3
T4
SM-12/15 Three Phase Schematic
TEMPERATURE
START
STOP
Typical Steamist
Control
Specification Chart
Model
No.
SM-12
Max. Cu. Ft.
For Area Up To KWVoltPhase
(Low Voltage)
Multi-Conductor
Cable*
Water
Level
Probe
TANK
45012
LLC-1300-3 Circuit Board
P13
P4
L
P3
WHT
GREY
H
P5
XL
P6
P8
YEL
Heating
Elements
240
208
240
208
240
208
15550SM-15
240
208
RED
P2
RED
DS1
DS2
P1
1
1
3
3
1
1
3
3
DS3
DS4
Fuse 0.15 AMP
P7
P9
YEL
Amps
50
58
29
33
63
72
36
42
GND
P10
P14
BLU
BLU
GRN
GND
BRN
RED
GRN
Line
Fuse
70
80
40
45
80
90
45
60
Test
P18 P17
Switch
See
Chart
P11
P15
P12
P16
BLK
BLK
BLK
NOTES: *Supplied with Controller.
**Field Connections, use 90ºC wire, gauge no. See Chart Copper.
*Wire Size 90ºC
Copper AWG
6
4
8
8
4
4
8
6
BLK
L1
BLK
L2
BLK
L3
Contactor/Relay
L3
COIL
L2
L1
Terminal
RED
Block
Noise
Filter
Auto Drain
ORG
Sensor
ORG
Water
Solenoid
Valve
BLK
BLK
Optional
Auto Drain
Valve
* NM-B type cable does not
follow the 90ºC wire guideline.
The NEC requires NM-B type
cable max current to be
de-rated. Always follow local
and national electrical codes.
GND
L1
Field
L2
Connections**
L3
T3
T2
T1
LED Color Chart
GRN
DS1
YEL
DS2
AMB
DS3
RED
DS4
TIMER ON
HEAT ON
WATER FILL ON
POWER ON
East Coast Office: 25 E. Union Ave., East Rutherford, NJ 07073 • Tel: 800-577-6478 • Fax: 201-933-0746
West Coast Office: Tel: 800-355-6478 • Fax: 661-940-1617
06/10
- 4 -
Pub. No. 323-L
Page 5
Plumbing Installation Instructions
®
®
C
US
Steambath GeneratorsModels: SM-12 and SM-15
The Steamist “SM” Generator comes factory assembled,
carefully wired and tested.
WARNING: All electrical power should be turned OFF when
working with Steam Generator.
IMPORTANT: The Plumbing Installation must conform to local
and national codes.
1. Pre-Installation
a) Be sure that the proper size Steam Generator has been
selected by using the sizing page in the “Full Line
Brochure,” “Pricing Guide,” “The Generator Sizing
Guide,” “Architectural Guidelines,” or in the Residential
Systems/Steambath Product Information section of the
Steamist website - www.steamist.com.
CAUTION: An improperly sized Steam Generator may
NOT produce the amount of steam necessary to reach
selected temperature.
IMPORTANT: Refer to page 4 for model required for
cubic foot rating.
b) The Steam Generator should be located as close as
possible to the Steamroom/Shower or tub enclosure.
Steam pipe should NOT exceed twenty-five feet in length.
If the steam pipe exceeds ten feet, use an appropriate
pipe insulation rated for a minimum of 212°F. Possible
locations include Vanity, Closets, Attic (insulated), or
Basement near bath area. The serial number plate should
be visible and the Steam Generator should be accessible
for service. Refer to Installation Suggestions on page 4.
Do NOT install Generator outdoors, in a moist, humid
area, or in an area where parts may freeze or corrode.
Also, do NOT install near flammable materials such as
paints, thinners, gasoline, etc.
c) The steam line and safety valve reach a temperature of
212°F during operation and should be appropriately
protected to prevent personal injury by accidental
contact.
2. Plumbing Rough-in
Plumbing rough-in is required for the water supply and
steam line; this should be completed before the walls
are closed. For operation, the “SM” Steam Generator
requires a ⅜" O.D. copper tubing to the fitting on the
generator for water inlet and a ¾" copper or brass pipe
for steam outlet.
NOTE: Safety Valve should be connected to a minimum ¾"
indirect waste or as required by local plumbing codes. In
the unlikely event this valve should open, the discharge
must be directed to prevent damage to the home. Do NOT
connect the Safety Valve output to the steam line.
a) Water Inlet - Rough in a water line to the hot or
cold supply. A shut off valve with a 3/8” connection
to the steam generator is to be provided at the
generator location (see Figure 4 on page 3).
b) Steam Outlet - Rough in the steam line using a
minimum of a ¾" copper or brass pipe; do NOT
use black iron or galvanized pipe, it will rust and
discolor the wall of the steambath. The steamhead
location should be 18" above the shower floor or 6"
above the rim of the bathtub, as far from the
seating area as possible. Also, do NOT use plastic
type water lines as a steam line.
CAUTION: No shutoff valve can be installed in the steam
line. Do NOT create traps or valleys in this line which would
trap condensation and block the flow of steam. The steam
pipe should be pitched toward the Steam Generator
allowing condensation to run back toward the Steam
Generator (preferred), or toward the steamhead. If the
steam generator is equipped with a drain valve, do NOT
connect the drain pipe to the steam line.
Figure 1- Steam Generator
Knockouts for
Electrical
Panel Cover
Install Upright
and Level
Control Cable
Knockouts for
Electrical
Supply Line
Water Inlet
⅜" Compression
Fitting
¾" Safety
Relief Valve
¾" Steam
Outlet
Optional Auto
Drain Installed
Model SM-900
WARNING:Elderly persons, pregnant women, or those suffering from heart disease, high blood pressure, diabetes, or
who are otherwise not in good health, do not use this device unless directed to do so by a physician. Also, do not use
steambath while under the influence of alcohol. For additional Important Safety Information, please see a separate
!
instruction Pub. No. 199.
IMPORTANT: The warranty of this product is voided if it is used in a commercial application or for anything other than a residential
steambath installation. This product is not intended for use with Home Automation systems.
06/10
- 1 -
Pub. No. 324-K
Page 6
Plumbing Installation Instructions
Installation InstructionsModels: SM-12 nad SM-15
3. Steam Generator Installation
The Steam Generator should be mounted in a location convenient
for hook-up and service by the plumber and electrician.
CAUTION: The Steam Generator is designed to be used ONLY
in an upright and level position; to do otherwise would damage
the unit and void the warranty.
a) The Steam Generator can be mounted to a wall or set
on the floor. However, the unit must be secured. To
secure the unit to a vertical wall, loosen the two screws
holding the electrical access cover, remove cover (see
Figure 1). Located inside the cabinet near the top left
and right corners are mounting holes. Place top cover
back and secure.
b) Connect the ⅜" water inlet to a shut off valve as
described in Section 2.a. The valve must be kept in an
open position during normal operation. In an area where
water hammer is a problem install a water hammer
arrestor in the line. Refer to Figure 2.
IMPORTANT: Do NOT use a “saddle valve” or piercing
type valve for water connection.
c) Connect the steam line from rough-in location described
in Section 2 to the ¾" nipple on the Steam Generator
using a union.
Figure 2 - Plumbing Diagram
Steam
Generator
Water
Level
Probe
Tank
Optional Auto Drain Valve
Connect to Indirect Waste
or As Required by Local Codes.
Electric Water
Solenoid Valve
Steam Line
Cold Incoming
Water Supply
(Required)
Connect to Indirect Waste
or As Required by Local Codes.
Shutoff Valve
Union
IMPORTANT: Install
steamhead 18" above
the shower floor or 6"
above the rim of the
bathtub.
Pressure Safety Valve
3199 Series Steamhead Installation Instructions
1. Make sure the ¾" nipple protrudes beyond the tile
approximately ½". (See Figure 3)
2. Wrap the nipple with pipe sealant tape.
3. Put a bead of silicone around the outer edge of the Back
Plate (see Figure 3) and center the Back Plate over the pipe
in an upright position. While holding it in place, screw the
Center Hub onto the nipple, using a ⅜" hex key to tighten.
4. The Center Hub MUST be aligned with the four walls in the
vertical and horizontal position (See Figure 3a). Make sure
the steamhead O-ring is fully seated into the Back Plate.
Figure 3 - Steamhead Installation
¾" NPT
(Brass Pipe)
Must use sealant
tape.
Apply silicone
around the steam
pipe to form a
water-tight seal.
½"
Aromatherapy
Reservoir
Apply silicone around
the back edge of the
Back Plate to seal and
prevent movement.
O-Ring MUST
seal to inside of
the Back Plate.
⅜" Hex Key
Hole
If the nipple is sticking out too far the O-ring will not make
a proper seal and the nipple must be adjusted.
5. Apply a small amount of silicone at the back center point
of the Cover Plate.This will aid in preventing movement
of this plate. (See Figure 3a)
6. Place the Cover Plate over the Center Hub. This is
accomplished by first hooking the top and then snapping
the bottom into place.
7. Adjust the Back Plate and Cover Plate to line up
squarely, and clean excess silicone with rubbing alcohol.
Figure 3a - Center Hub Installation
IMPORTANT:
Install top first
MUST be vertical
Back Plate
Center
Hub
06/10
Cover
Plate
- 2 -
Apply a small
amount of
silicone to
prevent
movement.
After inserting the top,
snap in the bottom.
Pub. No. 324-K
Page 7
®
Plumbing Installation Instructions
Figure 4 - Typical InstallationModels: SM-12 and SM-15
The Plumbing Instructions must be given to the homeowner for future use.
Slope ceiling 2" per foot
SMC-120 or TC-125
Auxilary Outside
Control
Safety Valve
Connect ¾" pipe to an
indirect waste or as
required by local codes.
SMC-150 or TC-150
Control MUST be installed
inside the steam room.
START
STOP
TEMPERATURE
START
STOP
⅜" Shutoff Valve
Keep in open
position during
normal operation.
Connect to Hot or
Cold water supply
Auto Drain Ready
½" Capped Line
Steam Outlet Pipe - Use a minimum of a ¾" Copper or Brass pipe.
NOTE: The SM Series steam generators will also work with the following controls: TC-110, TC-135, DSC-425, and
DSP .
CAUTION: Do NOT install a shutoff valve on the steam outlet pipe. Do NOT create traps or valleys in this line which
would prevent the flow of steam. The steam outlet pipe should be pitched toward the Steam Generator (preferred),
allowing condensation to run back into the Steam Generator or toward the steamhead. If the steam pipe exceeds ten
feet, use an appropriate pipe insulation rated for a minimum of 212°F.
06/10
Union
Required
- 3 -
Steamhead Installation
Steamhead should be mounted
18" above the finished floor or
6" above the rim of the tub as
far from the bather as possible.
Pub. No. 324-K
Page 8
Plumbing Installation Instructions
Access RequirementsModels: SM-12 and SM-15
Select a location for mounting the Steam Generator that is
accessible for installation and service. The access requirement
indicates the minimum space for convenient access to Steam
Generator.
CAUTION: All models must be installed INDOORS, in a DRY,
NON-FREEZING location away from flammable materials such
as: Gasoline, Paints, Thinners, Etc.
NOTE: This steam generator is NOT intended to be used for
space heating purposes.
IMPORTANT: Steam Generator must be installed upright and level.
Specication Chart
Model
SM-12
SM-15
No.
For Area Up To
*Max. Cu. Ft.
450
550
KW VoltPhase
240
208
12
240
208
240
208
15
240
208
1
1
3
3
1
1
3
3
Amps
50
58
29
33
63
72
36
42
Wire Size 90ºC
Copper AWG
6
4
8
8
4
4
8
6
*Refer to the Steamist Sizing Guide for actual Cu. Ft. capacity.
Installation Suggestions
Line
Fuse
70
80
40
45
80
90
45
60
Figure 5
Use 35" with
Optional Auto Drain
35"
28"
22"
18"
Steam
Generator
in Vanity
Alternate Attic Location
(Insulate to Prevent Freezing)
TIME
IM
1
STOP
1
2
2
TEMP
STOP
Alternate
Closet
Location
Alternate Basement Location
(Insulated and Dry)
East Coast Office: 25 E. Union Ave., East Rutherford, NJ 07073 • Tel: 800-577-6478 • Fax: 201-933-0746
®
West Coast Office: Tel: 800-355-6478 • Fax: 661-940-1617
06/10
- 4 -
Pub. No. 324-K
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.