Star Manufacturing EZ10 Installation Manual

OPERATOR'S MANUAL
HOLMAN CONVEYOR TOASTERS
OVEREASY MODEL EZ10
FOR SERVICE INFORMATION
U.S. AND CANADA CALL: TOLL FREE 1-800-225-3958
24 HOURS/DAY 7 DAYS/WEEK
TABLE OF CONTENTS
ASSEMBLY AND INSTALLATION PAGE 1
FRONT BEARING ASSEMBLY PAGE 1a
COOKING PROCEDURES PAGE 2
CLEANING PROCEDURES PAGE 3
TROUBLESHOOTING GUIDE PAGE 4, 5
MAINTENANCE PROCEDURES PAGE 5, 6
PARTS LIST PAGE 7
DRAWINGS
OPTIONAL FEED TRAY PAGE 3
DRIVE SYSTEM PAGE 4
HEATER TUBE INSTALLATION PAGE 5
COMPONENT ARRANGEMENT PAGE 7
HEAT REFLECTOR/CRUMB TRAY PAGE 7
WIRING DIAGRAM PAGE 8
REINSTALLING TOP COVER PAGE 9
FILE:F\USERS\BOB/MANUALS\VAMUAL\EZ10
HG0126 REVISED 07/25/00 RRD
OPERATOR'S MANUAL
HOLMAN CONVEYOR TOASTERS
UNCRATING AND INSPECTION
OVEREASY MODEL EZ10
Unpack unit and components from container. Remove all visible packing material, inspect unit for damage. If damage is discovered, file a claim immediately with the carrier that handled the shipment
ASSEMBLY AND INSTALLATION
.
The unit has been shipped fully assembled and ready to plug into a standard 15 amp outlet. Removal or replacement of the power supply cord and plug will result in the voiding of the warranty. For assistance, consult with the factory service team at 1-800-225-3958.
FIG. 1 PLUG CONFIGURATION
NEMA 5-15 PLUG 120V / 15 AMPS
G
W
WARNING
: MAKE SURE ALL INPUT POWER IS OFF BEFORE
INSTALLING/REMOVING ANY PARTS.
WARNING
: BE ABSOLUTELY SURE THE GROUND CONNECTION FOR THE
RECEPTACLE IS PROPERLY WIRED. NEVER CONNECT UNIT TO POWER WITHOUT PROPER GROUND CONNECTIONS. IMPROPER GROUND MAY RESULT IN SEVERE INJURY OR FATALITY.
REVISED 4/18/95 MJC
Page 1
OPERATOR'S MANUAL
HOLMAN CONVEYOR TOASTERS
MODEL EZ10
SPRING LOADED FRONT BEARING ASSEMBLY
Your Holman Conveyor Toaster is equipped with a spring-loaded front bearing assembly as shown below in fig. 1. The spring-loaded bearing assembly keeps the conveyor belt at a constant tension as the unit heats up and cools down. The conveyor belt is set to the proper tension when the white teflon bushing is flush with the end of the extension as shown in fig. 2.
Fig. 1
Fig. 2
Page 1a
OPERATOR'S MANUAL
HOLMAN CONVEYOR TOASTERS
REVISED 11/30/99 MJC
EZ10DOC.
COOKING PROCEDURES
A. BREAD TOASTING
LIGHTER
LIGHT TO DARK CONTROL
ON/OFF SWITCH
OVEREASY MODEL EZ10
DARKER
1. Switch On/Off switch control to the ON position; turn light to dark control to the center of the dial.
2. Allow warm up time of 5 to 10 minutes.
3. Test with a slice of bread.
a. If toast is too light, turn light to dark control clockwise to a slower speed.
b. If toast is too dark, turn light to dark control counterclockwise to a faster speed.
OPTIONAL FEED TRAY
1). Optional Feed Tray is Stored Inside Of Crumb Tray.
2). Slide Crumb Tray out To Expose Feed Tray.
3). Flip Feed Tray Into Position.
4). Slide Crumb Tray Back Into Unit Before Operation.
REVISED 8/31/95 MJC
Page 2
OPERATOR'S MANUAL
Loading...
+ 8 hidden pages