1. Safety information
2. General product information
3. Installation
4. Commissioning
5. Operation
6. Maintenance
© Copyright 2018
Printed in France
1
2
IM-F05-01-EN-ISS2 CMGT
1. Safety information
Safe operation of these products can only be guaranteed if they are properly installed, commissioned, used and maintained by qualified personnel (see Section 1.11) in compliance with the operating instructions. General installation and safety instructions for pipeline and plant construct ion, as well as t he proper use of tools and safety equipment must also be complied with.
Warning
The inspection plug gasket on the S2, S3, S12 and S13 and the bottom cover gasket on the S5 and S6 contain a thin stainless steel support ring which may cause physical injury if not handled and disposed of carefully.
1.1 Intended use
Referring to the Installation and Maintenance Instructions, name-plate and Technical Information Sheet , check that the product is suitable for the intended use/application. The products li sted below
comply with t he requirements of the Pressure Equipment Direct ive (PED) and carry the mar k
when so required.
The products fall within the following Pressure Equipment Directive categories:
S1
S2
S3
S5
and
S6
Product
16 bar g
16 bar g
16 bar g
50 bar g
Group 1
Gases
DN15 - DN20 SEP SEP SEP SEP
DN25 2 1 SEP SEP
DN32 - DN40 1 SEP SEP SEP
DN50 2 1 SEP SEP
DN40 1 SEP SEP SEP
DN50 - DN80 2 1 SEP SEP
DN100 - DN150 3 2 2 SEP
DN200 2 1 2 SEP
DN15 SEP SEP SEP SEP
DN20 - DN25 2 1 SEP SEP
DN32 - DN5 0 3 2 2 SEP
Group 2
Gases
Group 1
Liquids
Group 2
Liquids
IM-F05-01-EN-ISS2 CMGT
3
Product
DN65 - DN125 3 2 2 SEP
14 bar g
S7
and
20 bar g
and
23 bar g
S8
25 bar g
S12
S13
i) The product has been specifically designed for use on steam and compressed air which are
ii) Check material suitability, pressure and temperature and their maximum and minimum values.
iii) A numbe r of product s are suppl ied for the in tention of t he end user (or a gent there of) modifying
iv) Determine the correct installation situation and direction of fluid flow.
v) Spirax Sarco products are not intended to wi thst and external stresses that may be induced by
vi) Re move protect ion covers from all connect ions and prot ective film f rom all name -plates, w here
25 bar g
25 bar g
in Group 2 of the above mentioned Pressure Equipment Directive.
If the maximum operating limits of the product are lower than those of the system in whic h it is being fitted, or if malfunction of t he product could result in a dange rous overpressure or overtemperature occurrence, ensure a safety device is included in the syst em to prevent such over-limit situations.
the fl ange conf iguratio n from that su pplied. It i s the respo nsibilit y of the organ isation c arrying out the modif ication to do so in accordance with the internationally recognised flange standards and to ensure that the design rating and operation of the product are not compromised. Spirax Sa rco will not be held responsible for any unapproved modification or consequential liability resulting in failure to observe these requirements.
any system to which they are fit ted. It is the responsibility of the installer to consid er these stresses and take adequate precautions to minimise them.
appropriate, before installation on steam or other high temperature applications.
DN150 - DN200 4 3 2 SEP
DN250 - DN350 4 4 2 SEP
DN65 - DN80 3 2 2 SEP
DN100 - DN150 4 3 2 SEP
DN200 - DN300 4 4 2 SEP
DN350 4 4 2 1
DN65 - DN80 3 2 2 SEP
DN100 - DN150 4 3 2 SEP
DN200 - DN250 4 4 2 SEP
DN300 - DN350 4 4 2 1
DN32 - DN40 1 SEP SEP SEP
DN50 2 1 SEP SEP
DN40 1 SEP SEP SEP
DN50 - DN80 2 1 SEP SEP
DN100 - DN125 3 2 2 SEP
DN150 - DN200 3 2 2 SEP
Group 1
Gases
Group 2
Gases
Group 1
Liquids
Group 2
Liquids
4
IM-F05-01-EN-ISS2 CMGT
1.2 Access
Ensure safe access and if necessa ry a safe working platform (suitably guarded) before attempting to work on the product. Arrange suitable lifting gear i f required.
1.3 Lighting
Ensure adequate lighting, particularly where detailed or intricate work is required.
1.4 Hazardous liquids or gases in the pipeline
Consider what is in the pipeline or what may have been in the pipelin e at some previous time. Consider: flammable materials, substances hazardous to health, extremes of temperature.
1.5 Hazardous environment around the product
Consider: explosion risk areas, lack of oxygen (e.g. tanks, pit s), dangerous gases, extremes of temperature, hot surfaces, fire hazard (e.g. during welding), excessive noise, moving machinery.
1.6 The system
Consider the effect on the complete system of the wor k proposed. Will any proposed act ion (e.g. closing isolation valves, electrical isolation) put any ot her part of t he system or any personnel at ri sk? Dange rs might inc lude isola tion of vents o r protect ive devices or t he render ing ineff ective of con trols or alar ms. Ensure isolation valves are turned on and of f in a gradual way to avoid system shocks.
1.7 Pressure systems
Ensure that any pressure is isolated and safely vented to atmospheric pressure. Consider double isolation (double block and bleed) and the locking or labelling of closed valves. Do not assume that the system has depressurised even when the pressure gauge indicates zero.
1.8 Temperature
Allow time for temperature to normalise after isolation to avoid danger of burns.
1.9 Tools and consumables
Before star ting work ensure that you have suitable tools and /or consumables available. Use only genuine Spirax Sarco replacement parts.
1.10 Protective clothing
Consi der whethe r you and/or oth ers in the vic inity req uire any prote ctive clot hing to prote ct against the hazards of, for example, chemicals, high/low temperature, radiation, noise, falling objects, and dangers to eyes and face.
1.11 Permits to work
All work must be carried out or be sup ervised by a suitably competent person. Installation and operating personnel should be t rained in the correct use of the product according to the Installation and Maintenance Instructions. Where a formal 'permit to work' system is in force it must b e complied with. Where there is no such system, it is recommended that a responsible p erson should know what work is going on and, where n ecessar y, arrang e to have an assi stant whos e primar y respons ibility i s safety. Post ' warning notices' if necessary.
IM-F05-01-EN-ISS2 CMGT
5
1.12 Handling
Manual handling of large and/or heavy products may present a risk of injur y. Lift ing, pushing, pulling, car rying or suppor ting a load by bodily force can cause injur y par ticularly to the back. You are advised to assess the risks taking into account the ta sk, th e individual, the load and the working environment and use the appropriate handling method depending on the circumstances of the work being done.
1.13 Residual hazards
In normal use the external surface of t he product may be ver y hot. If used at the maximum permitted operating conditions the surface temperature of some products may reach temperatures of 300 °C (572 °F). Many pro ducts are not self- draining. Take due care when dismantling or removing the produc t from an installation (refer to Section 6 'Maintenance instructions').
1.14 Freezing
Provision must b e made to protect products which are not self- draining against frost damag e in environments where they may be exposed to temperatures below freezing point.
1.15 Disposal
Unles s otherw ise stated in t he Install ation and Ma intenanc e Instruct ions, this p roduct is re cyclable and no ecological ha zard is anticipated with its disposal providing due care is taken.
1.16 Returning products
Custom ers and stockists are reminded that under EC Health, Safety and Environment Law, when returning products to Spirax Sarco they must provide information on any hazards and the precautions to be taken due to contamination residues or mechanical damage which may p resent a health, safety or environmental risk. This information must be provided in writing including Health and Safet y data sheets relating to any substances identif ied as hazardous or potentially hazardous.
1.17 Working safely with cast iron products on steam
Cast iron products are commonly found on steam and condensate systems. If installed correctly using good steam engineering practices, it is per fectly safe. However, because of its mechanical proper ties, it is l ess forgiving compared to oth er materials such a s SG iron or carbon steel. The following are the good engineering practices required to prevent waterhammer and ensure safe working conditions on a steam system.
Safe Handling
Cast Iron is a brittle material. If the product is dropped during installation and there is any risk of damage the product should not be used unless it is fully inspected and pressure tested by the manufacturer.
6
IM-F05-01-EN-ISS2 CMGT
Prevention of water hammer
Steam trapping on steam mains:
Steam
30 - 50 metre inter vals
Gradient 1:100
Tra p set
Condensate
Gradient 1:100
Tra p set
Condensate
Steam Mains - Do's and Don'ts:
Flow
Steam Steam
Steam
Tra p set
Condensate
Flow
IM-F05-01-EN-ISS2 CMGT
7
Prevention of tensile stressing
Pipe misalignment:
Installing products or re-assembling after maintenance:
Do not over tighten.
Use correct torque gures.
Thermal expansion:
Guides
Short distance
Guides
Fixing point
Guides
1
4 2
Flange bolts should be gradually tightened across
diameters to ensure even load and alignment.
Axial movement
3
Axial movement
7
3
6
2
1
8
5
4
Medium distance
8
Limit rods
Fixing point
Limit rods
Guides
Small
lateral
movement
Large
lateral
movement
Small lateral movement
Large lateral movement
IM-F05-01-EN-ISS2 CMGT
2. General product information
2.1 General description
The products detailed are all baffle type separators used for the removal of entrained liquids in steam, compressed air and gas systems. We recommend the fitting of insulating jackets to improve the performance of the separator.
Note: For additional product data see the following Technical Information Sheets.
Typ e Material Pressure rating Sizes Connections TI reference
S1 SG iron PN16 ½", ¾" and 1" Screwed T I-P128 -01- EN -ISS1
S2 Cast iron PN16 1¼", 1½" and 2" Screwed TI-P129-01-EN-ISS1
S3 Cast iron PN16 D N40 - DN200 Flanged TI-P131-01-EN -ISS1
S5 Carbon steel PN50/ASME 300 DN15 - DN50
Austenitic stainless
S6
steel 316 L
S7* Carbon steel PN16 and PN40 DN65 - DN350 Flanged TI-P135- 0 2- EN -ISS1
S8* Austenitic stainless PN16 and PN40 DN65 - DN350 Flanged TI- P13 6 -01- EN -ISS1
S12 SG iron PN25 1¼", 1½" and 2" Screwed TI -P130 - 01-E N-ISS1
S13 SG iron PN25 DN40 - DN200 Flanged TI- P13 2- 01- EN- ISS1
* Note: The S7 and S8 separators are designed and manufactured in accordance with EN 13445:20 02 –
'Unfired Pressure Vessels'.
PN50/ASME 300 DN15 - DN50
Scr ewed and Flanged
Scr ewed and Flanged
TI-P133 - 01- EN- IS S1
TI-P134-01-EN-ISS1
S3
S13
Fig . 1
Fig. 4
IM-F05-01-EN-ISS2 CMGT
S5 S6
Fig. 2
S1
S2
S12
Fig. 3
S7 S8
Fig. 5
9
3. Installation
Note: Before ac tioning any installation observe the 'Safety Infor mation' in Section 1.
Referring to the Installation and Maintenance Instructions, body markings, name-plate (if fitted) and Technical Information Sheet, check that the product is suitable for the intended installation.
Check materials, pressure and temperature and their maximum values. If the maximum operating
3.1
limit of the product is lower than that of the system in which it is being fitted, ensure a safety devic e is included in the system to prevent overpressurisation.
Determine the correct installation situation and the direction of fluid flow.
3.2
Remove protective covers from all connections and the protective film from all name-plates, where
3.3
appropriate, before installation on steam or other high temperature applications.
The separators may be lagged if required.
3.4
Important installation note
for the S1, S2, S3, S12 and S13 separators:
Install in a horizontal pipeline with the drain directly below. To ensure that any separated liquid is drained away quickly, a suitable liquid drainer or steam trap must be connec ted to the drain.
Isolation valve
S13
separator
Strainer
Float trap
Fig. 6 Separator on a steam line
3.5 Installation for the S5 and S6
Install in a horizontal pipeline with the drain directly below. To ensure that any separated liquid is drained quickly, a suitable liquid drainer or steam trap must be connected to the drain connection. A float type trap is recommended. For those steam systems where air can be present, air can collect in the upper portion of the separator. In this situation a suitable air vent should be connected to the air vent c onnection. If an air vent is not being f itted then the connection must have the plastic transit protection plug removed and must have a carbon steel class 3000 lb plug fitted.
10
IM-F05-01-EN-ISS2 CMGT
S5 separator
Fig. 7
Isolation
valve
Strainer
Float trap
3.6 Installation for the S7 and S8
Install in a horizontal pipeline with the drain directly below. All sizes are fitted with suppor t brackets which can be used to minimise piping loads. Each bracket has two drilled holes. To ensure that any separated liquid is drained quickly, a suitable liquid drainer or steam trap must always be connected to the drain connection. A float type trap is recommended. For those steam systems where air can be present, air can collect in the upper portion of the separator. In this situation a suitable air vent should be connected to the air vent connection. If an air vent is not being f itted then the c onnection must have the plastic transit protection plug removed and a carbon steel class 3000 Ib plug fitted.
Air vent
S7 separator
Fig. 8 Separator on a steam line
IM-F05-01-EN-ISS2 CMGT
Isolation valve
Strainer
FT
or
CA trap
11
4. Commissioning
After installation or maintenance, ensure that the system is fully functioning. Carr y out tests on any alarms or protective devices.
Fig. 9 Heat transfer processes and valve protection
Fig. 10 Compressed air distribution
5. Operation
Separators are designed to gather together small droplets of entrained liquids and then separate them from the gas/ vapour f low. The relatively heavy droplets impinge on the internal baffles and are then directed to the separator drain connection and removed from the system using a steam trap, or when used on air or gas distribution system, a liquid drainer.
12
IM-F05-01-EN-ISS2 CMGT
6. Maintenance
Note: Before ac tioning any maintenance progr amme obser ve the 'Safety information' in Section 1.
Fi g. 11
S1
Table 1 Recommended tightening torques
There are no internal components that
require maintenance.
4
*
Warning
Separator Item Size
S1
IM-F05-01-EN-ISS2 CMGT
4½"¾"
1"
7/16"
½"
9/16"
or
mm
¼" UNF x ¾"
5/16" UNF x ¾"
3/8" UNF x ¾"
N m (lbf ft)
12
­28 40
14
-
32
-
50
(9 (21 (30
-
10)
-
24)
-
37)
13
2
*
Fig. 12
S2, S3, S12 and S13
Table 2 Recommended tightening torques
There are no internal components that
Warning
require maintenance.
Separator Item Size
S2
S3
S12
S13
2 2" 60 A/F M72 190 - 210 (140 - 155)
DN40 DN50 DN65 DN80
2
DN100 DN125 DN150 DN200
2 2" 46 A/ F M56 150 - 165 (110 - 121)
DN40 DN50 DN65 DN80
2
DN100 DN125 DN150 DN200
46 A/ F 60 A/F 46 A/ F 60 A/F 60 A/F 60 A/F 60 A/F 60 A/F
46 A/ F 46 A/ F 46 A/ F 60 A/F 60 A/F 60 A/F 60 A/F 60 A/F
or
mm
M56 M72 M56 M72 M72 M72 M72 M72
M56 M56 M56 M72 M72 M72 M72 M72
N m (lbf ft)
150
­190 150 190 190 190 190 190
150 150 150 190 190 190 190 190
165
-
210
-
165
-
210
-
210
-
210
-
210
-
210
-
165
-
165
-
165
-
210
-
210
-
210
-
210
-
210
(110 (140 (110 (140 (140 (140 (140 (140
(110 (110 (110 (140 (140 (140 (140 (140
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
121)
155)
121)
155)
155)
155)
155)
155)
121)
121)
121)
155)
155)
155)
155)
155)
14
IM-F05-01-EN-ISS2 CMGT
Suppor t bracket
5
*
Fig. 13
S5 and S6
Fig. 14
S7 and S8
Table 3 Recommended tightening torques
Separator Item Size N m (lbf ft)
S5
5 DN15 - DN50 46 A/F 180 - 200 (133 - 150)
S6
7. Spare parts
There are no spare parts required or available for these components.