out lines larger than 1/4 in will require a cementitious leveling compound to fill any grout lines,voids,or cracks.
Unacceptable floor coverings include Carpet (any type),foam underlayment, cushionedback vinyl,rubber,cork,laminates free-floating floors and wooden floors over concrete.
JOB SITE CONDITION
Prior to installation, the installer must ensure that at the time of installation,
the job site conditions including subfloor/substrate, ambient temperature and relative humidity,
and all impacting variables will not negatively affect the floor. The manufacturer will decline responsibility for damages associ
ated with improper installation or poor site conditions.
STORAGE AND CONDITIONS
The installation of Spectrum does not require acclimation. However we recommend installation in rooms with temperature be
tween 50°F & 100°F(10°C & 38°C).The HVAC system must be on and functional before, during and after installation. Pro
duct should be stored horizontally in a dry area away from direct sunlight.
Do not leave next to heat or cooling ducts. Ensure that all trades have been completed to eliminate dry wall dust, paints, etc.
Do not store flooring in uncontrolled environmental conditions. For example,
garages and exterior patios are not acceptable areas to store flooring. Flooring stored on a concrete slab should be elevated
at least 4 in. to allow air circulation under cartons.
EXISTING HOME
An existing home should have a consistent room temperature between 50°F & 100°F(10°C & 38°C)and relative humidity(
RH) of 35%-85%. Continual deviation from these conditions will affect the dimensions of flooring.
When using a heater during winter months,
humidity may be much lower than the acceptable range. During the warmer months,
maintain humidity levels using an air conditioner, dehumidifier, or by turning on your heating system periodically.
NEW CONSTRUCTION OR REMODEL
All work involving water, such as pouring basement concrete floors, drywall and plasterwork, plumbing, etc.
must be completed well in advance of the floor delivery. Ensure that the building is enclosed.Where building codes allow,per
manent heating and/or air conditioning systems should be operating at least two weeks preceding installation and should be
maintained during and after installation.If it is not possible for the permanent heating and/or air conditioning system to be ope
rating before,during and after installation,a temporary heating and/or dehumidification system that simulates normal living(oc
cupied)conditions can enable the installation to proceed until the permanent heating and/or air conditioning system is fully op
erational.Your job site should have a consistent temperature between 50°F & 100°F(10°C & 38°C)and relative humidity(R
H) of 35%-85% which should be maintained continuously thereafter.
RECOMMENDED INSTALLATION AREA
Do not install vinyl planks over carpet or any foam underlayment.This product is not suitable for any outside use,sunrooms/s
olariums,saunas,seasonal porches,camping trailers,boats,RV’s or rooms that have a potential of flooding.Do
not install in rooms or homes that are not temperature controlled. Exposure to long term direct sunlight can cause damage t
o your floor. Failure to properly shade or UV tint windows can discolor, fade,
or buckle vinyl planks. Use window treatments or UV tinting on windows.Vinyl planks are not intended for use on stairs or ver
tical surfaces. Do not glue, nail, screw or fasten to substrate. Install cabinetry, island and peninsula counters, vanities, tubs,
and showers first. Then install vinyl planks around them.
BASEMENTS AND CRAWL SPACES
Concrete slab or ground must be dry. Ensure that crawl spaces have open vents year round to ensure proper air circulation
and prevent moisture build up.The ground in the crawl spaces must be completely covered using 6 mil black polyethylene.Cr
awl space clearance between the earth and underside of joists should be no less than 18 in.and the perimeter vent area sho
uld be equal to 1.5% of the total square footage of the crawl space or as mandated by code.
RADIANT HEATED SUBFLOOR
This product can be installed over radiant heat concrete subfloors.The radiant heating system must be cast 1/2 in.below the
surface of the concrete slab and should be operating at least 2 weeks before installation. Set the temperature of the radiant
heating system to 68°F 48 hours before,during and 72 hours after installation.You may gradually raise the temperature starti
ng 72 hours after installation.The finished floor surface must not exceed 85°F(29°C)for the life of the floor. Because radiant
heat creates a dry heat that can lower interior humidity levels,
it may be necessary yo add a humidifier to maintain the humidity level between 3085% to prevent damage to the vinyl floor. Consult with the radiant heat system manufacturer to ensure that the system is co
mpatible with vinyl flooring.