Speck pumpen VH 300, VH 400, VH 500, VH 350, VH 110, VH 600, VH 1200, VH 800, VH 140, VU 20, VH 1600, VU 40, VU 80, VU 140, VU 300, VU 220, VU 500, VU 450, VU 600, VU 1200 Operating Instructions Manual
for Explosion Protection for Liquid Ring Compressors
These supplementary operating instructions are an addendum to the operating instructions. The
operating instructions for the product are to be observed without fail.
ATTENTION
Any warranty claims including claims for damages cease in case of non-observance.
The liquid-ring compressors are suitable for the intended use for operation in an environment prone to
explosion as well as for the conveying of explosive gases and vapour mixtures, which can also contain
hydrogen.
According to Directive 94/9/EC, the compressors conform to the equipment group II and to the following
categories depending on the type series and on the measurement and safety technology:
Outside the compressor:
category according to
EN 13463
The media of the environment at the site of installation belong
according to EN 13463-1 to the
Temperature classes Explosion groups further details
For all type series
2G T1, T2, T3 or T4 IIA or IIB or IIC
2D
maximum surface temperature (cf 3)
Inside the compressor:
category according to
EN 13463
The conveyed media belong
according to EN 13463-1 to the
Temperature classes Explosion groups further details
For all type series
2G T1, T2, T3 or T4 IIA or IIB
2D
maximum surface temperature (cf 3)
Inside the compressor:
category according to
EN 13463
Temperature classes Explosion groups further details
1G T1, T2, T3 or T4 IIA or IIB Medium contains hydrogen
1G T1, T2, T3 or T4 IIA or IIB
The authorizations for the corresponding equipment categories and media apply in each case only in
connection with the measurement-, control- and process-technology necessary for them. The
authorization ceases with a restriction of the functionality of the prescribed safety technology, a modified
operational mode or the non-compliance with the required maintenance procedures. Maintenance work
may only be performed by technically trained personnel.
The conveyed media belong
according to EN 13463-1 to the
for VU 20 to VU 1600, VH 20 to VH 1600 and VZ 110 to VZ 180 only
or
1
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
1 Operating thresholds
Operation as vacuum pump and compressor
Suction pressure p
Compression pressure p
Pressure differential pD - p
S
D
S
Inlet temperature
of the medium to be pumped
Temperature tB
of the operating liquid
Supply pressure pB
of the operating liquid
Temperature tS of the flushing liquid
(double-action slide ring gasket)
Ambient temperature -20°C - +40°C
The minimum allowable pressure on the suction side of the compressor as well as the maximum gas-,
vapour- and liquid-temperatures must make possible a safe distance to the vapour pressure of the
operating liquid independent of the operating liquid and ensure an operation free of cavitation.
33…1000 mbar
absolute
The suction pressure must be greater by at least 20
mbar than the vapour pressure of the operating
liquid discharging on the pressure side. The
minimum suction pressure described by the
manufacturer-characteristic may not be exceeded.
800…2600 mbar
absolute
The maximum compression pressure described by
the manufacturer-characteristic may not be
exceeded.
200…1800 mbar The maximum pressure differential described by
the manufacturer-characteristic may not be
exceeded.
Directive 94/9/EC
max. 60 °C
Directive 98/24/EC
max. 120°C
A maximum temperature of 60° applies for
machines to be employed according to Directive
94/9/EC:
Higher temperatures can only be met per Machine
Directive 98/24/EC.
tB = - 20…110 °C The minimum temperature is to be selected so that
a viscosity of 90 mm²/s is not exceeded.
The maximum temperature is to be selected so that
the vapour pressure of the operating liquid
discharging on the pressure side is at least 20 mbar
less than the suction pressure.
pB = pS +300 mbar
pB = pD…pD +200 mbar
The supply pressure of the operating liquid directly
at the compressor should be at least 300 mbar
above the suction pressure after a maximum of
60 s.
But this may also exceed the compression pressure
maximally by 200 mbar.
tS = - 20…110 °C The minimum temperature is to be selected so that
a viscosity of 90 mm²/s is not exceeded.
The maximum temperature must have a minimum
distance of 10 U to the boiling point of the flushing
liquid under process conditions.
Different operating conditions on request.
2
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
VH VH VH VH VH VH VH VH VH VH VH VH VH VH
VU VU VU VU VU VU VU VU VU VU VU VU
VZ VZ VZ VZ VZ VN VN VN
30 50 110 140 180 95 125 180
[Nm]
[Nm]
Supplementary Operating Instructions for Explosion Protection
2 Motor allocation
The following maximum torques and revolution speeds, depending on the operation as vacuum pump or
compressor, may in no case be exceeded.
VI VI VI VI VI V V/VG V/VG V/VG V/VG V/VG V V Type
2 8 15 30 55 6 30 55 95 130 255 330 430
0,5 1,8 2,5 5 10 33 42 60 33 42 60 0,5 1,8
1800 3600 3600 3600 3600
1800 1800 1800
1800 1800 1800 1800 3600
See data sheet for further operating data.
The power input designated in the process-specific data sheet for the motor to be used as well as the adjustment of
the protective motor switch is significant. The motor current is to be limited so that the power input is maximally 15%
above that of the data sheet.
3 Temperature limits
With knowledge of the temperature class, the surface temperature of the compressor may exceed the
maximum allowable temperatures in the following table in no operating condition according to EN 13463-
1.
EN 13463-1 Surface temperatures (EN 13463-1)
Temperature class Limit values maximum allowable
for category 1
T 4 135 °C 108 °C 130 °C
T 3 200 °C 160 °C 195 °C
T 2 300 °C 240 °C 290 °C
T 1 450 °C 360 °C 440 °C
maximum allowable
for category 2
If the reference basis for the identification is a certain material, then the surface temperature for
compressors of
Category 1 may reach maximally 80% of the ignition temperature in °C
Category 2 - with ignition temperatures 200°C may reach values at least 5U
- with ignition temperatures > 200°C may reach values at least 10U
below the ignition temperature
3
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Coolant
Supplementary Operating Instructions for Explosion Protection
For dust explosion protection the surface temperature has to be lower than 2/3 of the ignition temperature
in °C of the dust-air-mixture and 75 K below the glow temperature of a dust coat of 5 mm thickness.
4 Identification
The identification of the compressor with the label and the corresponding classification applies only
to the liquid-ring compressor.
Example: II 1G IIB T4 for explosive gas
Example: II 1D T 120° for explosive dusts with a maximum admissible surface
temperature of 120°C
All external equipment and components (coupling, motor, etc.) must at least satisfy the classifications
specified by the manufacturer of the compressor, be suitable for the respective zone and exhibit an
appropriate authorization and identification of the manufacturer of the respective equipment. This is
ensured with acquisition of the complete compressor with drive and control systems.
5 Permissible operating modes
The inert gas flushing is only necessary for
gases and vapors, which contain hydrogen
Inert gas
The inert gas flushing is only necessary for
gases and vapors, which contain hydrogen
Inert gas
LS-
01
TS+
05
Anti-cavitation
protection
FS-
04
UV
13
PS+
06
GO
11
LS-
02
LS-
03
FS-
14
GO
SO+
00
12
UV
14
Overflow
Fresh liquid
LS-
01
TS+
05
Anti-cavitation
protection
FS-
04
UV
13
PS+
06
GO
11
LS-
02
LS-
03
FS-
14
GO
SO+
00
12
UV
14
Overflow
Fresh liquid
Fig. 5.1. open circuit cooling
Fig. 5.2. closed circuit cooling
4
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
open circuit cooling
The removal of the compression output takes place
via the supply of cold fresh liquid. The minimum
temperature of the fresh liquid is to be selected so
that a viscosity of 90 mm²/s is not exceeded.
The maximum temperature is to be selected so that
after the mixture with the circulating liquid the
vapour pressure of the operating liquid discharging
on the pressure side is at least 20 mbar less than
the suction pressure.
closed circuit cooling
The removal of the compression output takes place
in a heat exchanger. The minimum temperature of
the circulating liquid at the outlet of the heat
exchanger is to be selected so that a viscosity of 90
mm²/s is not exceeded.
The maximum temperature at the outlet of the heat
exchanger is selected so that the vapour pressure
of the operating liquid discharging on the pressure
side is at least 20 mbar less than the suction
pressure.
Despite the pressure losses on the product side of
the heat exchanger the operating liquid pressure
directly at the compressor should be at least 300
mbar above the suction pressure.
For the separation of the gas and liquid phase front- or state-mounted separators are to be used according
to the specifications of the manufacturer.
6 Inertisation in the conveying of gases and vapours which contain hydrogen
Before the beginning of the process the rotating liquid-ring compressor is to be flushed with inert gas (for
example, nitrogen) with closed suction valve. The amount of flushing gas must correspond to at least
quintuple the internal volume of the system.
Also, after the end of the process before turning off the compressor flushing is to be done in the same
manner with closed suction valve.
Table 6.1 contains the volume specifications for the determination of nitrogen flushing times for the
system, consisting of a liquid-ring compressor of the type series VH, VU or VZ, a front-mounted separator
or side-mounted separator and the associated piping. This applies only for the front- or side-mounted
separators explicitly named by the Speck firm and piping for the integration in vacuum systems for the
conveying of mixtures, which contain hydrogen.
5
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
Type
Volume contents
of the compressor [l] 2 2,4 2,8 8 11 14 18 20 24 32 38 72 94 108
of the piping [l] 0,3 0,4 0,4 1,2 1,7 2,1 2,7 3,0 3,6 4,8 5,7 11 14 16
of the front-mounted
separator
of the side-mounted
separator
Supplementary Operating Instructions for Explosion Protection
7 Measuring-, Control- and Regulation Technology (MCR)
All MCR-equipment used must be tested and approved for explosion protection according to Directive
94/9/EC. The requirement profile of each individual invigilator as well as the associated control circuit
must correspond to IPL-1 according to EN 13463-6.
• Measuring instruments, which contact the conveying medium : Category 1
• Measuring instruments for the external environment : Category 2
7.1 Required MCR-equipment
TS+
05
Anti ca vitation
protection
Operating liquid pipe
to the pressure casing
(option al)
PS+
06
LS-
02
LS-
03
LS-
01
Operating liquid pipe
to the suction casing
FS-
04
Operating liquid pipe
to the pressure casing
(option al)
Fig. 7.1. MCR at the liquid-ring compressor
With employment of the compressor for the conveying of gases and vapours which contain hydrogen, in
addition to the MCR at the liquid-ring compressor according to Fig. 1 on the site of the installation, the
MCR technology corresponding to the switching diagrams according to Fig. 5.1 and 5.2 is also to be
installed for flushing with inert gas.
7
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
7.1.1 MCR-equipment for compressors of the equipment category 1G (inside) / 2G/D (outside)
comp. Fig. 7.1 When to install:
Motor protection switch (comp. 2) Always
LS- 01 Liquid level switch for clearance to start in the
compressor
If suction- and pressure-casing do not
ever have an appropriate piping to the
separator tank
LS- 02 upper liquid level switch in the separator tank Always
LS- 03 lower liquid level switch in the separator tank If LS- 01 is not installed or the liquid
level in the separator tank fluctuates
significantly.
FS- 04 Flow rate switch in the operating liquid supply of
Always
the compressor
TS+ 05 Temperature switch on the pressure side of the
Always
compressor
PS+ 06 Pressure switch on the pressure side of the
compressor
If the compression via ambient
pressure is not excluded due to use
•For compressors with double-action slide ring gasket, section 7.1.3 is also to be taken into
consideration
• For compressors with magnet coupling, section 7.1.4 is also to be taken into consideration
• With the conveying of gas-vapour mixtures, which contain hydrogen, an inertisation according to
section 7.2.2 is to be taken into consideration
7.1.2 MCR-equipment for compressors of equipment category 2G/D (inside) / 2G/D (outside)
comp. Fig. 7.1 When to install:
Motor protection switch (comp. 2) Always
LS- 02 upper liquid level switch in the separator tank Always
LS- 03 lower liquid level switch in the separator tank If the liquid level in the separator tank
fluctuates significantly.
TS+ 05 Temperature switch on the pressure side of the
Always
compressor
PS+ 06 Pressure switch on the pressure side of the
compressor
If the compression via ambient
pressure is not excluded due to use
•For compressors with double-action slide ring gasket, section 7.1.3 is also to be taken into
consideration
•For compressors with magnet coupling, section 7.1.4 is also to be taken into consideration
7.1.3 MCR-equipment for compressors of equipment category 2G/D (outside)
comp. Fig. 7.1 When to install:
Motor protection switch (comp. 2) Always
FS- 04 Flow rate switch in the operating liquid supply of
Always
the compressor
TS+ 05 Temperature switch on the pressure side of the
Always
compressor
PS+ 06 Pressure switch on the pressure side of the
compressor
If the compression via ambient
pressure is not excluded due to use
•For compressors with double-action slide ring gasket, section 7.1.3 is also to be taken into
consideration
•For compressors with magnet coupling, section 7.1.4 is also to be taken into consideration
8
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Fig. 7.2. MCR for double
-
action slide ring gasket
Supplementary Operating Instructions for Explosion Protection
7.1.4 Additional required MCR-equipment for compressors with double-action slide ring gasket
LS- 07 Liquid level switch for clearance
LS-
07
LS-
07
to start in each collecting tank of
the slide ring gaskets
FS- 08 Flow rate switch in the flushing
pipes of the slide ring gaskets
TS+ 09 Temperature switch in the
refeeding of the flushing liquid
FS-
After the clearance to start by LS- 07 a
08
suitable time lag for the activation of the flow
rate switch FS- 08 must be determined. The
time lag depends on the gasket size and the
viscosity of the sealing liquid. It is between 5 s
TS+
09
and 90 s. (see data sheet).
Additional required MCR-equipment for compressors with magnet coupling
TS+ 10 Temperature switch at the separating can of the compressor
TS+
10
FS-
08
TS+
09
Fig. 7.3. MCR at the liquid-ring compressor with magnet coupling
The temperature at the separating can must be at least 20 U less than the maximum allowed temperature
of the operating liquid.
Liquid-ring compressors with magnet coupling are always to be operated with a soft start!
9
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
7.2 Starting up / Operation / Shutdown
Compressors for the conveying of potentially explosive gas- and vapour-mixtures may initially be put into
operation, if all assembly components corresponding to the requirements of the manufacturer of the
individual components as well as the overall requirements of the compressor manufacturer were installed
and inspected in regard to their operability in detail as well as in the system and are thus fully capable of
functioning in terms of their provision.
7.2.1 General procedural method
•If an explosion danger already exists during the installation of the compressor or if a magnet-coupled
execution is entailed in the installed liquid-ring machine, the inspection in a rotational direction may
not take place under dry conditions. That concerns both the hydraulic area and the sealing areas of
double-action slide ring gaskets.
•A potential equalization for the total system according to EN 50014:2000 section 15 and further
applicable regulations must be ensured.
• The anti-cavitation protection pipe must be installed and be operational.
• Foreign particles from ferrous material may not get under the coupling protection. Danger of spark
formation.
•The operation with closed shut-off equipment in the suction- and pressure-pipes is not permissible.
7.2.2 Sufficient supply with operating liquid
After inspection for the absence of malfunction, the clearance to start by LS- 01 or LS- 02 (comp. Fig. 7.1)
and the start of the liquid-ring compressor, the appropriate time lag is necessary for the activation of the
flow-rate switch FS- 04. The time lag depends on the size of the compressor, the intake pressure and the
viscosity of the operating liquid. It is between 5 s and 90 s.
The volumetric currents of the operating liquid depend on the size of the compressor, the operating liquid
used and the operating parameters. The switching points of the switch FS- 04 are therefore to be
adjusted (see data sheet). The following table shows the switching ranges for water as the operating
liquid with a differential of at least 600 mbar between suction- and operating liquid-pressure.
Compressor-size
Switching point
FS- 04
[l/min]
VH
VU
VZ
VN 95 VN
V 6 V/V
VI 2 VI
8/15
0,5
1,0
to
to
1,0
2,0
20
20
30
G
30
VI
30
3,5
to
5,0
VH
VH
VH
VH
40
60
110
VU
VU 80 VU
40
VZ
VZ
50
V/V
G
55
VI
55
3,5
to
5,0
110
V/V
V/VG
G95
130
6,5
9,0
to
to
10
13,5
140
140
VZ
140
125
V/VG
155
9,0
to
13,5
VH
180
VU
220
VZ
180
VN
180
V/VG
255
9,0
to
13,5
VH
VH
VH
VH
300
350
400
VU
VU
300
V
330
10
to
18
450
V
430
10
10
to
to
18
18
VH
500
600
VU
VU
500
600
12
12
to
to
22
22
VH
800
VU
800
20
to
60
VH
1200
VU
1200
20 to
60
VH
1600
VU
1600
20 to
60
Tab. 7.1 Amounts of operating liquid in the liquid-ring compressors
10
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
7.2.3 Inertisation with the conveying of gases and vapours, which contain hydrogen
The liquid-ring compressor is run by means of an appropriate start-up and rundown procedure so that no
hydrogen-air mixture exists in the standing machine. Before the beginning of the process and before the
stoppage, the compressor is flushed with inert gas.
With malfunctions the compressor is immediately decoupled from the process, flooded with inert gas and
then switched off.
Start-up procedure:
The valves on the process side GO 11 and/or GO 12 (comp. Fig. 5.1/5.2) are closed.
After inspection for the absence of malfunction and the clearance to start by LS- 01 or LS- 02 (comp. Fig.
6.1), an appropriate time lag is necessary for the activation of the flow rate switch FS- 04. The time lag
depends on the size of the compressor, the intake pressure and the viscosity of the operating liquid. It is
between 5 s und 90 s. (see data sheet).
After a failure-free start-up of the liquid-ring compressor the nitrogen-flushing valves UV 13 and/or UV 14
open for a flushing time according to table 6.1. It must be flushed at least with the 5-fold, internal, free
volume of the vacuum system. The clearance occurs with the closing of the nitrogen-flushing valves
UV 13 and/or UV 14. The valves on the process side GO 11 and/or GO 12 can now be opened. The startup procedure is concluded.
Operation:
With failure-free operation no further activities are required. The liquid-ring compressor is monitored by
the existing monitoring organs.
Rundown procedure:
After the end of the process first the process valves GO 11 and/or GO 12 are closed. While the liquid-ring
compressor continues to run, the nitrogen-flushing valves UV 13 and/or UV 14 open for a preset time.
The flushing time is determined on the basis of the minimum pressure and the minimum quantity of flow.
The flushing time is 5-fold of the free, internal volume of the vacuum system. After the conclusion of the
flushing time the nitrogen valves UV 13 and/or UV 14 close. The liquid-ring compressor is switched off.
Malfunction:
If a malfunction occurs through the activation of one or several monitoring organs, then the process
valves GO 11 and/or GO 12 close immediately. At the same time the nitrogen flushing valves UV 13
and/or UV 14 open for a preset time. For the inertisation, a minimum volume must flow through the
compressor, which corresponds to 5-fold the internal volume of the system. After the flushing procedure
the compressor is to be switched off.
11
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
7.3 MCR flowchart
7.3.1 Category 1G (inside) / 2G/D (outside)
Compressor
operation
ON
Valid for: C
- Compressor with internally flushed
slide ring gasket
- no operating liquid feeding to the
pressure casing (comp. Fig. 7.1)
- Constancy of the
liquid level in the separator
ategorie 1G
(i)(a) 2G
LS- 01
ok
yes
LS- 02
ok
yes
no
no
Check:
- service liquid supply
- service liquid circulatio n
Check:
- service liquid supply
- service liquid circulatio n
Check the counter pres sure
only if there is no free outlet
to the environment
Start
Compressor
no
no
no
Operating time
>5s...90s
yes
FS- 04
ok
yes
TS+ 05
ok
yes
PS+ 06
ok
yes
Compressor
in operation
yes
Stop key
activated
Delay of the
flow-rate testing
after switching on
no
no
no
Check:
- service liquid supply
- service liquid circulatio n
Check:
- service liquid supply
- service liquid circulatio n
- temperature of the extracted gas
Check:
- pipe at the pressure side
! Take note of Fig. 7.13 !
! Take note of Fig. 7.14 !
Fig. 7.4 MCR-diagram for compressors of category 1G (inside) / 2G/D (outside)
yes
Shut down
compressor
Compressor
operation
OFF
Compressor
emergency
cut-off
12
! Take note of Fig. 7.15 !
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
Compressor
operation
ON
Valid for: C
- Compressor with internally flushed
slide ring gasket
- no operating liquid feeding to the
pressure casing (comp. Fig. 7.1)
-
significant fluctuation of the
liquid level in the separator
ategorie 1G
(i)(a) 2G
no
LS- 01
ok
yes
LS- 02
ok
yes
LS- 03
ok.
yes
Operating time
>5s...90s
yes
FS- 04
ok
yes
no
no
no
no
Check:
- service liquid supply
- service liquid circulatio n
Check:
- service liquid supply
- service liquid circulatio n
Check:
- service liquid supply
- service liquid circulatio n
Delay of the
flow-rate testing
after switching on
Check:
- service liquid supply
- service liquid circulatio n
no
no
Compressor
emergency
cut-off
Check the counter pres sure
only if there is no free outlet
to the environment
Start
Compressor
! Take note of Fig. 7.14 !
TS+ 05
ok
yes
PS+ 06
ok
yes
no
Compressor
in operation
yes
Stop key
no
activated
yes
Shut down
compressor
Compressor
operation
OFF
Fig. 7.5 MCR-diagram for compressors of category 1G (inside) / 2G/D (outside)
13
Check:
- service liquid supply
- service liquid circulatio n
- temperature of the extracted gas
Check:
- pipe at the pressure side
! Take note of Fig. 7.13 !
! Take note of Fig. 7.15 !
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
Compressor
operation
ON
Valid for: C
- Compressor with internally flushed
slide ring gasket
- operating liquid feeding to the
intake and pressure casing
(comp. Fig. 7.1)
ategorie 1G
(i)(a) 2G
Check the counter pres sure
only if there is no free outlet
to the environment
Start
Compressor
no
no
LS- 02
ok
yes
LS- 03
ok.
yes
Operating time
>5s...90s
yes
FS- 04
ok
yes
TS+ 05
ok
yes
PS+ 06
ok
yes
Compressor
in operation
yes
no
no
no
no
no
Check:
- service liquid supply
- service liquid circulatio n
Check:
- service liquid supply
- service liquid circulatio n
Delay of the
flow-rate testing
after switching on
Check:
- service liquid supply
- service liquid circulatio n
Check:
- service liquid supply
- service liquid circulatio n
- temperature of the extracted gas
Check:
- pipe at the pressure side
! Take note of Fig. 7.13 !
Fig. 7.6 MCR-diagram for compressors of category 1G (inside) / 2G/D (outside)
! Take note of Fig. 7.14 !
Stop key
no
activated
yes
Shut down
compressor
Compressor
operation
OFF
Compressor
emergency
cut-off
! Take note of Fig. 7.15 !
14
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
Compressor
operation
ON
Valid for: C
- Compressor with double action
slide ring gasket (comp. Fig. 7.2)
- no operating liquid feeding to the
pressure casing (comp. Fig. 7.1)
- Constancy of the
liquid level in the separator
ategorie 1G
(i)(a) 2G
LS- 07
ok
yes
LS- 01
ok
yes
LS- 02
ok
yes
no
no
no
Check:
- sealing liquid supply
- sealing liquid circulatio n
Check:
- service liquid supply
- service liquid circulatio n
Check:
- service liquid supply
- service liquid circulatio n
Check the counter pres sure
only if there is no free outlet
to the environment
Start
Compressor
no
no
no
Operating time
>5s...90s
yes
FS- 04
ok
yes
FS- 08
ok
yes
TS+ 09
ok
yes
TS+ 05
ok
yes
PS+ 06
ok
yes
Compressor
in operation
yes
Stop key
activated
Delay of the
flow-rate testing
after switching on
no
no
no
no
no
Check:
- service liquid supply
- service liquid circulatio n
Check:
- sealing liquid supply
- sealing liquid circulatio n
Check:
- sealing liquid supply
- sealing liquid circulatio n
Check:
- service liquid supply
- service liquid circulatio n
- temperature of the extracted gas
Check:
- pipe at the pressure side
! Take note of Fig. 7.13 !
Fig. 7.7 MCR-diagram for compressors of category 1G (inside) / 2G/D (outside)
! Take note of Fig. 7.14 !
yes
Shut down
compressor
Compressor
operation
OFF
15
Compressor
emergency
cut-off
! Take note of Fig. 7.15 !
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
Compressor
operation
ON
Valid for: C
- Compressor with double action
slide ring gasket (comp. Fig. 7.2)
- no operating liquid feeding to the
pressure casing (comp. Fig. 7.1)
-
significant fluctuation of the
liquid level in the separator
ategorie 1G
(i)(a) 2G
Check the counter pres sure
only if there is no free outlet
to the environment
Start
Compressor
no
no
LS- 07
ok
yes
LS- 01
ok
yes
LS- 02
ok
yes
LS- 03
ok.
yes
Operating time
>5s...90s
yes
FS- 04
ok
yes
FS- 08
ok
yes
TS+ 09
ok
yes
TS+ 05
ok
yes
PS+ 06
ok
yes
Compressor
in operation
yes
no
no
no
no
no
no
no
no
no
Check:
- sealing liquid supply
- sealing liquid circulatio n
Check:
- service liquid supply
- service liquid circulatio n
Check:
- service liquid supply
- service liquid circulatio n
Check:
- service liquid supply
- service liquid circulatio n
Delay of the
flow-rate testing
after switching on
Check:
- service liquid supply
- service liquid circulatio n
Check:
- sealing liquid supply
- sealing liquid circulatio n
Check:
- sealing liquid supply
- sealing liquid circulatio n
Check:
- service liquid supply
- service liquid circulatio n
- temperature of the extracted gas
Check:
- pipe at the pressure side
! Take note of Fig. 7.13 !
Fig. 7.8 MCR-diagram for compressors of category 1G (inside) / 2G/D (outside)
! Take note of Fig. 7.14 !
Stop key
no
activated
yes
Shut down
compressor
Compressor
operation
OFF
Compressor
emergency
cut-off
! Take note of Fig. 7.15 !
16
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
Compressor
operation
ON
Valid for: C
- Compressor with double action
slide ring gasket (comp. Fig. 7.2)
- operating liquid feeding to the
intake and pressure casing
(comp. Fig. 7.1)
ategorie 1G
(i)(a) 2G
LS- 07
ok
yes
no
Check:
- sealing liquid supply
- sealing liquid circulatio n
Check the counter pres sure
only if there is no free outlet
to the environment
Start
Compressor
no
no
LS- 02
ok
yes
LS- 03
ok.
yes
Operating time
>5s...90s
yes
FS- 04
ok
yes
FS- 08
ok
yes
TS+ 09
ok
yes
TS+ 05
ok
yes
PS+ 06
ok
yes
Compressor
in operation
yes
nein
no
no
no
no
no
no
Check:
- service liquid supply
- service liquid circulatio n
Check:
- service liquid supply
- service liquid circulatio n
Delay of the
flow-rate testing
after switching on
Check:
- service liquid supply
- service liquid circulatio n
Check:
- sealing liquid supply
- sealing liquid circulatio n
Check:
- sealing liquid supply
- sealing liquid circulatio n
Check:
- service liquid supply
- service liquid circulatio n
- temperature of the extracted gas
Check:
- pipe at the pressure side
! Take note of Fig. 7.13 !
Fig. 7.9 MCR-diagram for compressors of category 1G (inside) / 2G/D (outside)
! Take note of Fig. 7.14 !
Stop key
no
activated
yes
Shut down
compressor
Compressor
operation
OFF
Compressor
emergency
cut-off
! Take note of Fig. 7.15 !
17
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
Compressor
operation
ON
Valid for: C
- Compressor with magnetic
coupling (comp. Fig. 7.3)
- no operating liquid feeding to the
pressure casing (comp. Fig. 7.1)
- Constancy of the
liquid level in the separator
ategorie 1G
(i)(a) 2G
LS- 01
ok
yes
LS- 02
ok
yes
no
no
Check:
- service liquid supply
- service liquid circulatio n
Check:
- service liquid supply
- service liquid circulatio n
Check the counter pres sure
only if there is no free outlet
to the environment
Start
Compressor
no
no
no
Operating time
>5s...90s
yes
FS- 04
ok
yes
TS+ 10
ok
yes
TS+ 05
ok
yes
PS+ 06
ok
yes
Compressor
in operation
yes
Stop key
activated
Delay of the
flow-rate testing
after switching on
no
no
no
no
Check:
- service liquid supply
- service liquid circulatio n
Check:
- service liquid supply
- Blockade of the compressor
- internal liquid insufficiency
Check:
- service liquid supply
- service liquid circulatio n
- temperature of the extracted gas
Check:
- pipe at the pressure side
! Take note of Fig. 7.13 !
Fig. 7.10 MCR-diagram for compressors of category 1G (inside) / 2G/D (outside)
! Take note of Fig. 7.14 !
yes
Shut down
compressor
Compressor
operation
OFF
18
Compressor
emergency
cut-off
! Take note of Fig. 7.15 !
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
Compressor
operation
ON
Valid for: C
- Compressor with magnetic
coupling (comp. Fig. 7.3)
- no operating liquid feeding to the
pressure casing (comp. Fig. 7.1)
-
significant fluctuation of the
liquid level in the separator
ategorie 1G
(i)(a) 2G
no
LS- 01
ok
yes
LS- 02
ok
yes
LS- 03
ok.
yes
Operating time
>5s...90s
yes
FS- 04
ok
yes
no
no
nein
no
Check:
- service liquid supply
- service liquid circulatio n
Check:
- service liquid supply
- service liquid circulatio n
Check:
- service liquid supply
- service liquid circulatio n
Delay of the
flow-rate testing
after switching on
Check:
- service liquid supply
- service liquid circulatio n
no
no
no
Compressor
emergency
cut-off
Check the counter pres sure
only if there is no free outlet
to the environment
Start
Compressor
! Take note of Fig. 7.14 !
TS+ 10
ok
yes
TS+ 05
ok
yes
PS+ 06
ok
yes
no
Compressor
in operation
yes
Stop key
no
activated
yes
Shut down
compressor
Compressor
operation
OFF
Fig. 7.11 MCR-diagram for compressors of category 1G (inside) / 2G/D (outside)
19
Check:
- service liquid supply
- Blockade of the compressor
- internal liquid insufficiency
Check:
- service liquid supply
- service liquid circulatio n
- temperature of the extracted gas
Check:
- pipe at the pressure side
! Take note of Fig. 7.13 !
! Take note of Fig. 7.15 !
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
Compressor
operation
ON
Valid for: C
- Compressor with magnetic
coupling (comp. Fig. 7.3)
- operating liquid feeding to the
intake and pressure casing
(comp. Fig. 7.1)
ategorie 1G
(i)(a) 2G
Check the counter pres sure
only if there is no free outlet
to the environment
Start
Compressor
no
no
LS- 02
ok
yes
LS- 03
ok.
ja
Operating time
>5s...90s
yes
FS- 04
ok
yes
TS+ 10
ok
yes
TS+ 05
ok
yes
PS+ 06
ok
yes
Compressor
in operation
yes
no
nein
no
no
no
no
Check:
- service liquid supply
- service liquid circulatio n
Check:
- service liquid supply
- service liquid circulatio n
Delay of the
flow-rate testing
after switching on
Check:
- service liquid supply
- service liquid circulatio n
Check:
- service liquid supply
- Blockade of the compressor
- internal liquid insufficiency
Check:
- service liquid supply
- service liquid circulatio n
- temperature of the extracted gas
Check:
- pipe at the pressure side
! Take note of Fig. 7.13 !
Fig. 7.12 MCR-diagram for compressors of category 1G (inside) / 2G/D (outside)
! Take note of Fig. 7.14 !
Stop key
no
activated
yes
Shut down
compressor
Compressor
operation
OFF
Compressor
emergency
cut-off
! Take note of Fig. 7.15 !
20
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
BEGINNING
start
Compressor
Start
compressor
no
yes
yes
Inertisation
necessary
yes
Process valve
GO11 / GO12
is open
no
Start
compressor
FS- 04
ok
no
Operating Time
>5s...90s
yes
Open
Flushing valves
UV13 / UV14
FS- 14
ok
no
Waiting time
>10s
yes
Inertisati on is necessary
with compression of gas
which contain hydrogen
Operating stop with
malfunction message
no
Check:
- service liquid supply
- service liquid circulation
Stop
compressor
no
Operating stop with
malfunction message
yes
no
Stop
compressor
no
FS- 14
ok
yes
Flushing time
ok
yes
Close
Flushing valves
UV13 / UV14
Open
Process valves
GO11 / GO12
END
Start
compressor
Fig. 7.13 Start of compressors of category 1G (inside) / 2G/D (outside)
21
Check:
- flushing gas pressure
- flushing gas supply
Check:
- flushing gas pressure
- flushing gas supply
Operating stop with
malfunction message
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
BEGINNING
shut down
compresssor
no
yes
no
Inertisation
necessary
yes
Close
Process valves
GO11 / GO12
Open
Flushing valves
UV13 / UV14
FS- 14
ok
no
Raising delay
>10s
yes
Flushing time
ok
yes
Close
Flushing valves
UV13 / UV14
no
Compressor
emerg ency shut off
Inertisati on is necessary
with compression of gas
which contain hydrogen
Delay after the opening
of the flus hing valves
! Take note of Fig. 7.15 !
yes
compressor
stopped
no
Stop
compressor
END
shut down
compressor
Fig. 7.14 Shut down of compressors of category 1G (inside) / 2G/D (outside)
22
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
BEGIN
compressor
emergency cut off-
Delay after opening
the flushing valves
no
yes
no
Inertisation
necessary
yes
Close
Process valves
GO11 / GO12
Stop
compressor
Open
Flushing valves
UV13 / UV1 4
FS- 14
ok
no
Raising delay
>10s
yes
Flushing time
ok
ja
Close
Flushing valves
UV13 / UV1 4
no
Connect
the Iner t gas
Close
Flushing valves
UV13 / UV1 4
ALARM
no Inert gas
Inertisation is necessary
with compression of gas
which contain hydrogen
- Eliminate the errors
- Acknowledge the failure
Fig. 7.15 Emergency cut-off of compressors of category 1G (inside) / 2G/D (outside)
Operating stop with
malfunction message
END
compressor
emergency shut-off
23
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
7.3.2 Category 2G (inside) / 2G (outside)
Compressor
operation
ON
Valid for: C
- Compressor with internally flushed
slide ring gasket
- Constancy of the
liquid level in the separator
ategorie 2G(i)(a) 2G
Check the counter pressure
only if there is no free outlet
to the env ironment
Start
Compressor
no
no
LS- 02
ok
yes
Operating time
>5s...90s
yes
FS- 04
ok
yes
TS+ 05
ok
yes
PS+ 06
ok
yes
Compressor
in operation
yes
no
no
no
no
Check:
- service liquid supply
- service liquid circulation
Delay of the
flow-rate testing
after switching on
Check:
- service liquid supply
- service liquid circulation
Check:
- service liquid supply
- service liquid circulation
- temperature of the extracted gas
Check:
- pipe at the pressure side
Starting the compressor
Fig. 7.16 MCR-diagram for compressors of category 2G/D (inside) / 2G/D (outside)
no
Stop key
activated
yes
Compressor
operation
OFF
Stop
Compressor
Operating stop with
malfunction message
Stoping the c ompressor
24
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
Compressor
operation
ON
Valid for: C
- Compressor with internally flushed
slide ring gasket
-
significant fluctuation of the
liquid level in the separator
ategorie 2G
(i)(a) 2G
Check the counter pressure
only if there is no free outlet
to the env ironment
Start
Compressor
no
no
LS- 02
ok
yes
LS- 03
ok.
ja
Operating time
>5s...90s
yes
FS- 04
ok
yes
TS+ 05
ok
yes
PS+ 06
ok
yes
Compressor
in operation
yes
no
nein
no
no
no
Check:
- service liquid supply
- service liquid circulation
Check:
- service liquid supply
- service liquid circulation
Delay of the
flow-rate testing
after switching on
Check:
- service liquid supply
- service liquid circulation
Check:
- service liquid supply
- service liquid circulation
- temperature of the extracted gas
Check:
- pipe at the pressure side
Starting the compressor
Fig. 7.17 MCR-diagram for compressors of category 2G/D (inside) / 2G/D (outside)
no
Stop key
activated
yes
Compressor
operation
OFF
Stop
Compressor
Operating stop with
malfunction message
Stoping the c ompressor
25
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
Compressor
operation
ON
Valid for: C
- Compressor with double action
slide ring gasket (comp. Fig. 7.2)
- Constancy of the
liquid level in the separator
ategorie 2G(i)(a) 2G
LS- 07
ok
yes
no
Check:
- sealing liquid supply
- sealing liquid circulation
Check the counter pressure
only if there is no free outlet
to the env ironment
Start
Compressor
no
no
LS- 02
ok
yes
Operating time
>5s...90s
yes
FS- 04
ok
yes
FS- 08
ok
yes
TS+ 09
ok
yes
TS+ 05
ok
yes
PS+ 06
ok
yes
Compressor
in operation
yes
no
no
no
no
no
no
Check:
- service liquid supply
- service liquid circulation
Delay of the
flow-rate testing
after switching on
Check:
- service liquid supply
- service liquid circulation
Check:
- sealing liquid supply
- sealing liquid circulation
Check:
- sealing liquid supply
- sealing liquid circulation
Check:
- service liquid supply
- service liquid circulation
- temperature of the extracted gas
Check:
- pipe at the pressure side
Starting the compressor
Fig. 7.18 MCR-diagram for compressors of category 2G/D (inside) / 2G/D (outside)
no
Stop key
activated
yes
Compressor
operation
OFF
Stop
Compressor
Operating stop with
malfunction message
Stoping the c ompressor
26
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
Compressor
operation
ON
Valid for: C
- Compressor with double action
slide ring gasket (comp. Fig. 7.2)
-
significant fluctuation of the
liquid level in the separator
ategorie 2G
(i)(a) 2G
LS- 07
ok
yes
no
Check:
- sealing liquid supply
- sealing liquid circulation
Check the counter pressure
only if there is no free outlet
to the env ironment
Start
Compressor
no
no
LS- 02
ok
yes
LS- 03
ok.
ja
Operating time
>5s...90s
yes
FS- 04
ok
yes
FS- 08
ok
yes
TS+ 09
ok
yes
TS+ 05
ok
yes
PS+ 06
ok
yes
Compressor
in operation
yes
no
nein
no
no
no
no
no
Check:
- service liquid supply
- service liquid circulation
Check:
- service liquid supply
- service liquid circulation
Delay of the
flow-rate testing
after switching on
Check:
- service liquid supply
- service liquid circulation
Check:
- sealing liquid supply
- sealing liquid circulation
Check:
- sealing liquid supply
- sealing liquid circulation
Check:
- service liquid supply
- service liquid circulation
- temperature of the extracted gas
Check:
- pipe at the pressure side
Starting the compressor
Fig. 7.19 MCR-diagram for compressors of category 2G/D (inside) / 2G/D (outside)
no
Stop key
activated
yes
Compressor
operation
OFF
Stop
Compressor
Operating stop with
malfunction message
Stoping the c ompressor
27
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
Compressor
operation
ON
Valid for: C
- Compressor with magnetic
coupling (comp. Fig. 7.3)
- Constancy of the
liquid level in the separator
ategorie 2G(i)(a) 2G
Check the counter pressure
only if there is no free outlet
to the env ironment
Start
Compressor
no
no
LS- 02
ok
yes
Operating time
>5s...90s
yes
FS- 04
ok
yes
TS+ 10
ok
yes
TS+ 05
ok
yes
PS+ 06
ok
yes
Compressor
in operation
yes
no
no
no
no
no
Check:
- service liquid supply
- service liquid circulation
Delay of the
flow-rate testing
after switching on
Check:
- service liquid supply
- service liquid circulation
Check:
- service liquid supply
- Blockade of the compressor
- internal liquid insufficiency
Check:
- service liquid supply
- service liquid circulation
- temperature of the extracted gas
Check:
- pipe at the pressure side
Starting the compressor
Fig. 7.20 MCR-diagram for compressors of category 2G/D (inside) / 2G/D (outside)
no
Stop key
activated
yes
Compressor
operation
OFF
Stop
Compressor
Operating stop with
malfunction message
Stoping the c ompressor
28
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
Compressor
operation
ON
Valid for: C
- Compressor with magnetic
coupling (comp. Fig. 7.3)
-
significant fluctuation of the
liquid level in the separator
ategorie 2G
(i)(a) 2G
Check the counter pressure
only if there is no free outlet
to the env ironment
Start
Compressor
no
no
LS- 02
ok
yes
LS- 03
ok.
ja
Operating time
>5s...90s
yes
FS- 04
ok
yes
TS+ 10
ok
yes
TS+ 05
ok
yes
PS+ 06
ok
yes
Compressor
in operation
yes
no
nein
no
no
no
no
Check:
- service liquid supply
- service liquid circulation
Check:
- service liquid supply
- service liquid circulation
Delay of the
flow-rate testing
after switching on
Check:
- service liquid supply
- service liquid circulation
Check:
- service liquid supply
- Blockade of the compressor
- internal liquid insufficiency
Check:
- service liquid supply
- service liquid circulation
- temperature of the extracted gas
Check:
- pipe at the pressure side
Starting the compressor
no
Stop key
activated
yes
Compressor
operation
OFF
Stop
Compressor
Operating stop with
malfunction message
Stoping the c ompressor
29
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
Fig. 7.21 MCR-diagram for compressors of category 2G/D (inside) / 2G/D (outside)
7.3.3 Category 2G (outside)
Valid for: C
- Compressor with internally flushed
slide ring gasket
ategorie
2G (a)
Compressor
operation
ON
no
Operating time
>5s...90s
yes
no
no
no
Compressor
Operating stop with
malfunction message
Check the counter pres sure
only if there is no free outlet
to the env ironment
Start
Compressor
FS- 04
ok
yes
TS+ 05
ok
yes
PS+ 06
ok
yes
no
Compressor
in operation
yes
Stop key
no
activated
yes
Compressor
operation
OFF
Fig. 7.22 MCR-diagram for compressors of category 2G/D (outside)
Stop
Delay of the
flow-rate te sting
after switching on
Check:
- service liquid supply
- service liquid circulation
Check:
- service liquid supply
- service liquid circulation
- temperature of the extracted gas
Check:
- pipe at the pressure side
Starting the compressor
Stoping the compressor
30
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
Valid for: C
- Compressor with double action
slide ring gasket (comp. Fig. 7.2)
ategorie
2G (a)
Compressor
operation
ON
no
Operating time
>5s...90s
yes
no
no
no
no
no
Stop
Compressor
Operating stop with
malfunction message
Check the counter pres sure
only if there is no free outlet
to the env ironment
Start
Compressor
FS- 04
ok
yes
FS- 08
ok
yes
TS+ 09
ok
yes
TS+ 05
ok
yes
PS+ 06
ok
yes
no
Compressor
in operation
yes
no
Stop key
activated
yes
Compressor
operation
OFF
Fig. 7.23 MCR-diagram for compressors of category 2G/D (outside)
Delay of the
flow-rate te sting
after switching on
Check:
- service liquid supply
- service liquid circulation
Check:
- sealing liquid supply
- sealing liquid circulati on
Check:
- sealing liquid supply
- sealing liquid circulati on
Check:
- service liquid supply
- service liquid circulation
- temperature of the extracted gas
Check:
- pipe at the pressure side
Starting the compressor
Stoping the compressor
31
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
Valid for: C
- Compressor with magnetic
coupling (comp. Fig. 7.3)
ategorie
2G (a)
Compressor
operation
ON
no
Operating time
>5s...90s
yes
no
no
no
no
Stop
Compressor
Operating stop with
malfunction message
Check the counter pres sure
only if there is no free outlet
to the env ironment
Start
Compressor
FS- 04
ok
yes
TS+ 10
ok
yes
TS+ 05
ok
yes
PS+ 06
ok
yes
no
Compressor
in operation
yes
no
Stop key
activated
yes
Compressor
operation
OFF
Fig. 7.24 MCR-diagram for compressors of category 2G/D (outside)
Delay of the
flow-rate te sting
after switching on
Check:
- service liquid supply
- service liquid circulation
Check:
- service liquid supply
- Blockade of the compressor
- internal liquid insufficiency
Check:
- service liquid supply
- service liquid circulation
- temperature of the extracted gas
Check:
- pipe at the pressure side
Starting the compressor
Stoping the compressor
32
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
8 Maintenance
Regular maintenance is to be performed with use in an operation prone to explosion. Defective parts and
components are to be replaced. Only replacement parts approved by the pump manufacturers are to be
used.
The operator alone is responsible for the performance of monitoring procedures, maintenance
and inspections. The procedures used are to be documented in written form.
So that with easily inflammable gases no potentially explosive gas-air mixtures can arise, the compressor
must be sufficiently flushed with inert gas before the opening of the compressor as well as before the
reconnection after the opening of the compressor.
Checklist for maintenance work
Maintenance procedures
Acoustic test for absence of cavitation
Acoustic check of the bearings (compressor and motor)
Visual test for absence of leakage
Visual run-out test of the coupling
Relubrication of the anti-friction bearings VU 300/450; VU/VH 500/600 with 8g
grease
Relubrication of the anti-friction bearings VU/VH 800 – 1600 with 15g grease
Replacement of all bearings and gaskets (dynamic and static)
Disassembly of the compressor and test of all parts for mechanical, corrosive and
cavitation damages.
Functional test of the control technology. (Equipment-specific operating instructions
are to be observed.)
every
14 days
X
X
X
X
Intervals
every
2000 h
every
8000 h
X
X
X
X
X
33
Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Corporate Information
Supplementary Operating Instructions for Explosion Protection
Title: Supplementary Operating Instructions
Document No.: 1096.0209 - 1
Modification date: 17.03.08
(Replacement for version 04.09.07)