Speakman NEO Collection Combination Series, NEO SM-1410 Installation, Operation & Maintenance Instructions Manual

Page 1
SPEAKMAN
SM-1410
Installation, Operation & Maintenance Instructions
NEO™ COLLECTION COMBINATION SERIES
DESCRIPTION
Speakman Neo™ Collection Combination Series, SM-1410 includes: Shower Valve Trim with integral Volume Control Handle (CPT-1401), Shower Arm with Wall Flange (S-2540), and Low Flow Multi Function Shower Head (S-3010-E2). This combination does include the Shower Valve.
This combination comes with the following Speakman
Sentinel Mark II® Pressure Balance Diverter Shower Valve
CPV-PB-DV: Pressure Balance Diverter Shower Valve
Sweat & Thread Connections
SPECIFICATIONS
CPV-PB-DV SENTINEL MARK II® PRESSURE BALANCE DIVERTER SHOWER VALVE:
COMPLIANCE: ASME A112.18.1 / CSA B125.1 Certified / ASSE 1016 Certified
CPT-1401 SENTINEL MARK II® DIVERTER SHOWER VALVE TRIM: COMPLIANCE: ASME A112.18.1 / CSA B125.1 Standard
S-2540 SHOWER ARM WITH WALL FLANGE:
CONNECTIONS: ½” NPT Male Inlet & Outlet
S-3010-E2 LOW FLOW MULTI FUNCTION SHOWER HEAD:
CONNECTIONS: ½” NPT Female Inlet FLOW RATE: 2.0 gpm (7.6 L/min) COMPLIANCE: ASME A112.18.1 / CSA B125.1 Standard & WaterSense Certified
INSTRUCTIONS
See individual products for installation of the components and warranty information.
SPEAKMAN®
Phone: 800-537-2107 Fax: 800-977-2747
01/14/19 www.speakman.com 92C-SM-1410-01
Page 2
ROUGH-IN
SPEAKMAN®
Phone: 800-537-2107 Fax: 800-977-2747
01/14/19 www.speakman.com 92C-SM-1410-01
Page 3
INSTRUCTIONS FOR MODELS
92-CPV-PB-02
For additional assistance or service please contact:
SPEAKMAN
®
Company 400 Anchor Mill Road New Castle, DE 19720
800-537-2107
customerservice@speakman.com
www.speakman.com
CPV-PB CPV-PB-DV
HELPFUL TOOLS & SUPPLIES:
TOOLS AND SUPPLIES
Pencil Keyhole
Saw
Adjustable
Wrench
Thread Seal
Tape
9/16” (14mm) Deep
Well Socket
Socket
Wrench
Pipe
Wrench
Solder Kit
Phillips
Screwdriver
Measuring
Tape
Safety
Glasses
Tubing
Cutter
Level
Slip Joint
Wrench
Warranty information can be found at: www.speakman.com
WARRANTY
Your new Shower/Bath Valve is designed for years of trouble-free performance. Keep it looking new by cleaning it periodically with a soft cloth. The use of harsh chemicals and abrasives on any of the Speakman custom finish products may damage the finish and void the product warranty. Please be sure to only use approved cleaners. Please contact Speakman for any clarification of acceptable cleaners.
MAINTENANCE
Cover your drain to prevent loss of parts. Be sure to wear eye protection while cutting pipe.
SAFETY TIPS
IMPORTANT
• Be sure to read instructions thoroughly before beginning installation.
• Be sure to have properly adjusted the Temperature Limiting Stop (TLS) as outlined in this Installation Manual.
• Inspect all connections after installation of valve.
• This valve has an operating range of 20-80 psi.
• This valve is designed to be used in conjunction with a shower-head rated at 1.75 gpm (6.6 L/min) or higher flow rate.
NOTE: This installation manual covers several models of valves. While the appearance of your valve may differ from those shown, the installation method is the same.
• Maximum water pressure: 125 psi static; minimum water pressure: 20 psi flowing; minimum cold supply temperature: 40 °F; maximum hot supply temperature: 160 °F; minimum hot supply temperature: 5 °F above set point.
This type of valve must be cleaned and maintained on a regular basis. Periodic maintenance should be performed at least every 12 months or after any changes have been made to the building’s plumbing system. This maintenance should include removing and cleaning the spring check stop components. Make sure the stop poppet in each stop moves freely. Valves that are installed outdoors should be winterized by removing all of the internal parts and removing any standing water from the valve. Quarterly the maximum hot temperature setting (TLS) should be checked and adjusted accordingly.
1
Remove the two Screws with a Philips Head Screwdriver then slide the Rough-In Template off the Valve.
2
Referencing the supplied rough-in dimensions (located at the end of this manual), determine the preferred location of Valve. Align the supplied Rough-In Template with this location and trace outline of Template onto wall. Using a Keyhole Saw or similar tool, cut along traced line and remove this section of wall.
3
Shut off the water supply to the Tub and Shower. Verify that the hole sizes and positions in the wall are correct:
A. The shower and tub spout outlet holes should be 1” diameter.
B. To determine the Valve mounting depth, see STEP 4.
C. The recommended Valve depth to the finished wall is 2½” minimum to 3½”
maximum. Position the Valve Body correctly in the wall with the “UP” pointing up. The 1’-9” minimum from the Valve Body to the Tub Spout is required for proper operation.
4’-6” (1.4 meters)
Shower Only
1’-9”
(533mm)
Tub/Shower
6’-6” (1.4 meters)
Tub/Shower
&
Shower Only
Ø1” Hole for Shower Arm
Ø1” Hole for Tub Spout
ØSee Step 4
4”
(102mm)
Tub/Shower
4
Install the Rough-In Template over the Shower Valve being sure the Rough-In Template sits flush against Valve Body. Following the rough-in dimensions for your model of valve (located ot the end of this manual) as well as the markings on the supplied Rough-In Template, install valve at proper depth. The distance from the centerline of the inlet/outlet ports of the Valve Assembly to the finished wall MUST be between 2½” - 3½”. See images below for reference.
SHOWER OUTLET
TUB OUTLET
ROUGH-IN TEMPLATE
THE BACK SURFACE OF THE ROUGH-IN TEMPLATE IS FLUSH WITH OR INSIDE THE VALVE ACCESS HOLE.
FINISHED WALL SURFACE
2½” MINIMUM
MOUNTING DEPTH
MINIMUM MOUNTING DEPTH
SHOWER OUTLET
TUB OUTLET
ROUGH-IN TEMPLATE
THE FRONT EDGE OF THE ROUGH-IN TEMPLATE IS FLUSH WITH OR OUTSIDE THE VALVE ACCESS HOLE.
FINISHED WALL SURFACE
3½” MAXIMUM
MOUNTING DEPTH
MAXIMUM MOUNTING DEPTH
5
If your installation is for a shower only, apply Thread Seal Tape in a clockwise direction to the Tub Outlet Port and install the included Plug Cap. Wrench tighten. If you are performing a pipe fitting installation, apply Thread Seal Tape around the pipe threads in a clockwise direction.
Page 4
6 PIPE FITTING INSTALLATION
Connect the HOT and COLD Water Supply Lines (not included), the Shower Outlet Pipe (not included), and Tub Outlet Pipe (not included), by threading them into the Valve Body in a clockwise direction. Tighten the pipes to the Valve Body with a Pipe Wrench. Connect the Pipe Elbows (not included), to the end of the shower outlet and tub outlet pipes. If performing a shower only installation, install Plug Cap in
place of tub outlet piping, as shown in STEP 5.
NOTE: The HOT water supply lines go into the H inlet, and the COLD water supply lines
go into the C inlet. Do not use PEX or CPVC between the valve and spout.
SHOWER ONLY
TUB + SHOWER
COLD
HOT
7 COPPER SWEAT INSTALLATION
When performing a Copper Sweat installation, it is recommended that you remove the Valve Cartridge , Integral Stops
, and Diverter Cartridge (where applicable) to prevent damage during soldering. Use a Slip Joint Wrench to
unthread and remove the Bonnet . Then remove Valve Cartridge , from Valve Body . Unthread and remove the Integral Stops using a Socket Wrench equipped with a 9/16” (14mm) Deep Well Socket. If your Shower Valve is equipped with an Integral Diverter, remove the Diverter Retaining Nut using an Adjustable Wrench. Remove Diverter Cartridge to prevent damage during soldering.
After soldering (STEP 8) is completed, reinstall the Valve Cartridge , making sure that the mounting posts are aligned and engaged to the corresponding holes in the Valve Body , with the “H” marking to the left side as shown below. Slide Bonnet ❸ over the Valve Cartridge ❹ and thread onto the Valve Body . Tighten securely with Slip Joint Wrench on the machined flats of the Bonnet . Final torque should be 88-106 in*lb. Take care to not over tighten connection or damage may occur. Reinstall the Integral Stops using a Socket Wrench equipped with a 9/16” (14mm) Deep Well Socket. Final torque should be 70-106 in*lb. If your Shower Valve is equipped with an Integral Diverter, reinstall the Diverter Cartridge taking care to align mounting posts of Cartridge with the corresponding holes in the Diverter Valve Body. Install Diverter Retaining Nut and tighten with an Adjustable Wrench. Final torque should be 35-53 in*lb. Take care to not over-tighten connections.
NOTE: Never install the valve body upside down!
Socket
Wrench
9/16” (14mm) Deep
Well Socket
+
Normal Installation
(shown without Bonnet)
H
8 COPPER SWEAT FITTING INSTALLATION
Connect the HOT and COLD Water Supply Lines (not included), the Shower Outlet Pipe (not included), and Tub Outlet Pipe (not included), by soldering them into the Valve Vody . Connect the Pipe Elbows (not included), to the end of the shower outlet and tub outlet pipes. If performing a shower only installation, install Plug Cap in place of tub outlet piping, as shown in STEP 5. Verify that all connections are soldered. Reassemble Valve components as outlined in STEP 7.
NOTE: The HOT water supply lines go into the H inlet, and the COLD water supply lines
go into the C inlet. Do not use PEX or CPVC between the valve and spout.
SHOWER ONLY
TUB + SHOWER
COLD
HOT
9 BACK-TO-BACK INSTALLATION
Your Shower Valve has the ability to be mounted back-to-back with another Valve in a shared space. This means the HOT and COLD inlets may be reversed. Please see the following steps to adapt your valve for back-to-back mounting or reversed inlet supplies. If you are NOT making a reverse or back-to-back installation, skip this step, and continue with STEP 10. If the HOT and COLD water supplies are reversed (HOT on right and COLD on left), disassemble Valve Cartridge as outlined in STEP 7. Rotate Valve Cartridge 180° so “H” appears on the right. Install the Valve Cartridge making sure that the mounting posts are aligned and engaged to the corresponding holes in the Valve Body . Slide Bonnet over the Cartridge and thread onto the body. Tighten securely with Slip Joint Wrench on the machined flats of the Bonnet . Final torque should be 88-106 in*lb. Take care to not over tighten connection or damage may occur.
NOTE: Never install the valve body upside down!
Reverse
Installation
COLD
COLD
COLD
COLD
COLD
COLD
HOT
HOT
HOT
HOT
HOT
HOT
Normal Installation
(shown without Bonnet)
H
Reverse Installation
(shown without Bonnet)
H
Normal Installation
(changes not required)
Page 5
10
FLUSHING THE WATER OUTLETS
AND CHECKING FOR LEAKS
Place the Handle on the Valve Cartridge Spindle and turn the Handle clockwise to the full on mixed position. Turn on the HOT and COLD water supply lines and allow the water to flow from the outlets for one minute, or until all foreign matter has been flushed out. Check for leaks. Shut off the water at the Valve and supply lines. Remove the Handle .
NOTE: A thermometer can be held at the Valve outlet to aid in either checking the existing factory setting
or reaching the desired outlet temperature.
ADJUSTING THE TEMPERATURE LIMITER
For Colder setting, adjust the Temperature Limiting
Collar in a counter-clockwise direction and slide it back to the splined section of the Cartridge until fully seated. Rotate the Valve Spindle clockwise to check if desired outlet temperature is achieved. If not, repeat the procedure.
For Hotter setting, adjust the Temperature Limiting
Collar in a clockwise direction and slide it back to the splined section of the Cartridge until fully seated. Rotate the Valve Spindle clockwise to check if desired outlet temperature is achieved. If not, repeat the procedure.
• Once desired outlet temperature is achieved, rotate the spindle counter-clockwise to the “Off” position.
FOR COLDER WATER
1
2
FOR HOTTER WATER
2
1
The maximum outlet temperature setting adjustment (Temperature Limit Stop (TLS)) of the Valve has been factory set at 110 °F. To adjust the limit of the maximum outlet temperature the Valve delivers, adjust the Valve’s temperature limit stop (TLS) collar by following the steps below.
• With the water supplies "On" and the Valve in the “Off” position, remove the (RED) TLS adjustment collar from the Cartridge .
ADJUSTING THE TEMPERATURE LIMIT STOP (TLS)
11
12
Reinstall Rough-In Template over Valve to protect it during final wall preparation. Secure into position with the included screws.
CPV-PB / CPV-PB-DV REPAIR PARTS
SPEAKMAN
®
ITEM #
PART #
DESCRIPTION
1 RPG50-21029 CHECK STOP REPAIR KIT 2 RPG05-1124 PRESSURE BALANCE CARTRIDGE 3 RPG05-0897 DIVERTER CARTRIDGE
CPV-PB / CPV-PB-DV SERVICE INSTRUCTIONS
Service Instructions
Caution- Any repair or servicing of the Valve may effect the maximum outlet temperature setting of the Valve. After working on the Valve, make sure the maximum outlet temperature is set to the recommended setting of 110 °F.
Pressure Balance Cartridge Removal
1) Remove Trim from Valve. Close the Integral Stops of the Valve by turning the Stop Spindles clockwise.
2) With the Valve in the “OFF” position, remove the Bonnet by unthreading with a Slip Joint Wrench.
3) If necessary, remove the Cartridge from the Valve Body by pulling on the Valve spindle of the Cartridge. Verify that the Lower Cartridge Seal is in place within the Valve Cartridge, and not within the Valve Body.
4) Replace the Pressure Balance Cartridge if necessary. When replacing the Pressure Balance Cartridge, verify that the Lower Cartridge Seal is properly installed in the recess on the bottom of the Cartridge. This Lower Cartridge Seal is positioned over the HOT & COLD inlet waterways of the Valve Body.
5) Reassemble the Bonnet by threading it into the Valve Body with a Slip Joint Wrench. Final torque should be 88-106 in*lb. Important- Adjust the Valve’s maximum outlet temperature to the recommended setting of 110 °F. See Temperature Limit Stop adjustment steps within this document.
6) Open the Integral Stops of the Valve by turning the Stop Spindles counter­clockwise. Check Valve for leaks.
7) Reassemble the Trim parts.
Spring Check Stop Parts Removal
1) Remove Trim from Valve. Shut off HOT and COLD water supply lines to the inlets of the Valve.
2) Unscrew the Stop’s Retaining Nut using a Socket Wrench equipped with a 9/16” (14mm) Deep Well Socket. Carefully remove the Retaining Nut w/Spindle, Spring, and Poppet assembly. Clean and/or replace the necessary parts. Reassemble the parts, reversing the above procedure. Final torque should be 70-106 in*lb. Repeat procedure on the other Stop.
3) Turn on the HOT and COLD water supply lines. Check for leaks.
4) Reassemble the Trim Parts. Diverter Cartridge Removal (if present)
1) Remove Trim from Valve. Close the Integral Stops of the Valve by turning the Stop Spindles clockwise.
2) Remove the Diverter Retaining Nut using an Adjustable Wrench.
3) Remove Diverter Cartridge from Valve Body. Verify that the Lower Cartridge Seal is in place within the Diverter Cartridge, and not within the Valve Body.
4) Replace the Diverter Cartridge if necessary. When replacing the Diverter Cartridge, make sure that the mounting posts are aligned and engaged to the corresponding holes of the Valve Body.
5) Reassemble the Diverter Retaining Nut using an Adjustable Wrench. Final torque should be 35-53 in*lb.
6) Open the Integral Stops of the Valve by turning the Stop Spindles counter­clockwise. Check for leaks.
7) Reassemble the Trim Parts.
I
P
D
Page 6
CPV-PB-DV ROUGH-IN DIAGRAM
SPEAKMAN
®
DIMENSIONS SUBJECT TO CHANGE WITHOUT NOTICE.
NOTES:
COMPLIANCE:
CONNECTIONS:
ASME A112.18.1/CSA B125.1
ASSE1016/ASME A112.1016/CSA B125.16
Hot/Cold Inlets: ½” Female Copper Sweat ½” NPT Male
Shower Outlet: ½” Female Copper Sweat ½” NPT Male
Tub Outlet: ½” Female Copper Sweat ½” NPT Male
(Cap included for Shower Only Connections)
Contractor to supply necessary inlet connections.
NOTES:
This valve is designed to be used in conjunction with a shower-head rated at 1.75 gpm (6.6 L/min) or higher flow rate
CPV-PB ROUGH-IN DIAGRAM
SPEAKMAN
®
DIMENSIONS SUBJECT TO CHANGE WITHOUT NOTICE.
6'-6" [2 METERS]
NOTES:
COMPLIANCE:
CONNECTIONS:
ASME A112.18.1/CSA B125.1
ASSE1016/ASME A112.1016/CSA B125.16
Hot/Cold Inlets: ½” Female Copper Sweat ½” NPT Male
Shower Outlet: ½” Female Copper Sweat ½” NPT Male
Tub Outlet: ½” Female Copper Sweat ½” NPT Male
(Cap included for Shower Only Connections)
Contractor to supply necessary inlet connections.
NOTES:
This valve is designed to be used in conjunction with a shower-head rated at 1.75 gpm (6.6 L/min) or higher flow rate
TO FLOOR
1/2" NPT MALE 1/2" SWEAT CONNECTIONS
A
1/2" NPT MALE 1/2" SWEAT CONNECTIONS
1"
25mm
HOLE FOR
SHOWER ARM
5-1/2" (140MM) DIA. HOLE FOR VALVE ACCESS
1/2" NPT MALE 1/2" SWEAT CONNECTIONS
DIMENSIONS SUBJECT TO CHANGE WITHOUT NOTICE. FOR ADA MOUNTING LOCATIONS, CONSULT ADAAG, ANSI A117.1, AND STATE REGULATIONS.
4’-6" [1.4 METERS]
TO FLOOR (SHOWER
INSTALLATION
ONLY)
1'-9" [533mm]
4" [102mm] TO TOP OF
TUB LEDGE
A
5
"
3
16
84mm
1/2" NPT MALE 1/2" SWEAT CONNECTIONS
1"
25mm
HOLE FOR TUB SPOUT
13
"
4
16
123mm
7
4
16
112mm
2-1/2" MIN
[64mm]
3-1/2" MAX
[89mm]
(ADJUSTMENT)
13
"
2
16
"
72mm
6'-6" [2 METERS]
TO FLOOR
1/2" NPT MALE 1/2" SWEAT CONNECTIONS
4’-6" [1.4 METERS]
TO FLOOR (SHOWER
INSTALLATION
ONLY)
A
1/2" NPT MALE 1/2" SWEAT CONNECTIONS
1'-9" [533mm]
4" [102mm] TO TOP OF
TUB LEDGE
1"
25mm
HOLE FOR
SHOWER ARM
5-1/2" (140MM) DIA. HOLE FOR VALVE ACCESS
1/2" NPT MALE 1/2" SWEAT CONNECTIONS
1/2" NPT MALE 1/2" SWEAT CONNECTIONS
1"
25mm
HOLE FOR TUB SPOUT
2-1/2" MIN
[64mm]
3-1/2" MAX
[89mm]
(ADJUSTMENT)
DIMENSIONS SUBJECT TO CHANGE WITHOUT NOTICE. FOR ADA MOUNTING LOCATIONS, CONSULT ADAAG, ANSI A117.1, AND STATE REGULATIONS.
50mm
A
7
"
4
16
2"
15
4
16
125mm
"
13
"
4
16
123mm
112mm
13
"
2
16
72mm
Page 7
INSTRUCTIONS FOR MODELS
92-CPT-1401-01
For additional assistance or service please contact:
SPEAKMAN
®
800-537-2107
customerservice@speakman.com
www.speakman.com
CPT-1401
TOOLS AND SUPPLIES
Phillips
Screwdriver
Measuring
Tape
Warranty information can be found at: www.speakman.com
WARRANTY
MAINTENANCE
Cover your drain to prevent loss of parts.
SAFETY TIPS
IMPORTANT
• Be sure to read instructions thoroughly before beginning installation.
• Do not over-tighten any connections or damage may occur.
• Be sure to have properly adjusted the Temperature Limiting Stop (TLS) as per the Valve Installation Instructions before installing Valve Trim.
Your new Speakman Product is designed for years of trouble-free performance. Keep it looking new by cleaning it periodically with a soft cloth. The use of harsh chemicals and abrasives on any of the Speakman custom finish products may damage the finish and void the product warranty. Please be sure to only use approved cleaners. Please contact Speakman for any clarification of acceptable cleaners.
1
Clean wall surface. Place Mounting Base (1) onto the valve, align mounting holes, and secure with supplied screws (2).
2
Verify the position of the Spindle within the Mounting Plate, as shown below. If the end of the Spindle extends beyond the Mounting Plate, then use the Shallow Mount Adapter. If the end of the Spindle is flush to, or is within the Mounting Plate, then use the Deep Mount Adapter.
FOR SHALLOW MOUNT APPLICATION
FOR DEEP MOUNT APPLICATION
3
Confirm that Valve is in the “Off” position. Place appropriate Connector (1) on to the Spindle of the Valve, making sure to orient the Connector so that one set of Splines are in a perfectly vertical position. Secure Connector with 8-32 screw provided (2).
Splines in Vertical Position
4
Place Wall Plate (1) on Mounting Base. Take care to orient the Wall Plate as shown below. Verify the
Diverter Valve Stem is in the OFF (vertical) position. Align the Diverter Drive Tube (2) on the Wall Plate to the Stem (3) of the Diverter Valve.
* VIEW FROM BACK OF WALL PLATE
5
Align Handle Assembly with Connector (1) and Escutcheon as shown below. Keep Handle (2A) in a stationary vertical position and place over Connector (1) and engage the Splines of the Connector with the Handle Assembly. Keep Handle in the vertical position as you thread Handle Hub (2B) on to Mounting Base. Tighten until snug.
Page 8
CPT-1401 REPAIR PARTS
SPEAKMAN
®
RPG05-0874 SCREWS AND SPLINE ADAPTERS
ITEM NO. PART NO. DESCRIPTION
CPT-1401 ROUGH-IN DIAGRAM
SPEAKMAN
®
DIMENSIONS SUBJECT TO CHANGE WITHOUT NOTICE.
VALVE MOUNTING IS SHOWN FOR REFERENCE ONLY.
VALVE IS NOT INCLUDED WITH CPT-1401.
1"
25mm
HOLE FOR
SHOWER ARM
5
1 2
"
140mm
HOLE FOR
VALVE ACCESS
1"
25mm
HOLE FOR TUB SPOUT
6'-6" [2 METERS]
TO FLOOR
4'-6" [1.4 METERS]
TO FLOOR
(SHOWER
INSTALLATION ONLY)
1'-9" [533mm]
4" [102mm
TO TOP OF
TUB LEDGE
A
A
1/2 NPT FEMALE
1/2" SWEAT CONNECTION
1/2" SWEAT CONNECTION
2-1/2"MIN
[64mm]
3-1/2"MAX
[89mm]
(ADJUSTMENT)
4
15 16
"
125mm
1/2" SWEAT CONNECTION
7in
[177.8mm]
2.0in
50.42mm
1 2
"
12.70mm
7 8
"
22.86mm
3
1 2
"
89.13mm
2
5 8
"
66.27mm
2.0in
50.4mm
3
1 2
"
88.81mm
NOTE: TRIM FITS DIFFERENT VALVES. ROUGH-IN DIMENSIONS PROVIDED FOR REFERENCE ONLY.
2-1/2" MIN
[64mm]
3-1/2" MAX
[89mm]
(ADJUSTMENT)
2-1/2" MIN
[64mm]
3-1/2" MAX
[89mm]
(ADJUSTMENT)
3-3/16" MIN
[81mm]
4-3/16" MAX
[106mm]
(ADJUSTMENT)
3-1/8" MIN
[80mm]
4-1/8" MAX
[105mm]
(ADJUSTMENT)
CPV-T-DV CPV-PB-DV CPV-T-PXC-DV
CPV-T-PXE-DV
CPV-PB-PXC-DV
CPV-PB-PXE-DV
Page 9
INSTRUCTIONS FOR MODELS
92-S-2540-03
For additional assistance or service please contact:
SPEAKMAN
®
Company 400 Anchor Mill Road New Castle, DE 19720
800-537-2107
customerservice@speakman.com
www.speakman.com
S-2540
TOOLS AND SUPPLIES
1
Slide Escutcheon Plate (2) over the long end of the Shower Arm (1).
2
Apply Thread Seal Tape to inlet side of Shower Arm (1).
3
Thread Shower Arm (1) into Female Pipe Fitting within the wall. Firmly tighten, and make sure Shower Arm (1) Outlet is pointing in a downward position.
4
Position Escutcheon Plate (2) flat against wall. Secure Escutcheon Plate (2) to Shower Arm (1) by tightening set screw with Allen Wrench (Hex: 2.0mm) provided.
ROUGH IN DIMENSIONS
Specifications:
Supply Inlet: 1/2" NPT Outlet: 1/2" NPT
7in
175.4mm REF
.8in
20.62mm REF
1.9in
47.78mm REF
135°
REF
1/2" NPT
1/2" NPT
2.25in
57.15mm REF
Thread Seal
Tape
Allen Wrench
(Included)
IMPORTANT
Be sure to read instructions thoroughly before beginning installation. Do not overtighten any connections or damage may occur.
SAFETY TIPS
Cover your drain to prevent loss of parts.
MAINTENANCE
Your new Shower Arm is designed for years of trouble-free performance. Keep it looking new by cleaning it periodically with a soft cloth. Avoid abrasive cleaners, steel wool and harsh chemicals as these will dull the finish and void your warranty.
WARRANTY
Additional warranty information can be found at: www.speakman.com
Page 10
INSTRUCTIONS FOR MODELS
TOOLS AND SUPPLIES
ROUGH IN DIMENSIONS
1
Apply Thread Seal Tape to the outlet side of shower arm in a clockwise direction.
2
Thread Shower head onto shower arm by turning it in a clockwise direction. Tighten with adjustable wrench. Turn water supply on and check for leaks.
3
Adjust spray pattern by rotating faceplate to preferred Anystream® position.
S-3010 S-3010-E2 S-3010-E175
Thread Seal
Tape
(included)
Adjustable
Wrench
For additional assistance or service please contact:
SPEAKMAN
400 Anchor Mill Road New Castle, DE 19720
800-537-2107
customerservice@speakman.com
www.speakman.com
®
Company
92-S-3010-03
IMPORTANT
Be sure to read instructions thoroughly before beginning installation. Do not overtighten any connections or damage may occur.
SAFETY TIPS
Cover your drain to prevent loss of parts.
MAINTENANCE
Periodic cleaning using a mild soap and warm water will help keep your Showerhead's appearance in its original condition.
For best results, dry immediately with a soft, clean cloth. DO NOT USE harsh and/or abrasive cleaners.
To help restore the finish, occasionally apply a non-abrasive wax to your showerhead body (follow manufacturers’ instructions).
On CHROME PLATED SHOWER HEADS, a two (2) part white vinegar, one (1) part water solution can be used to break down excessive mineral deposits on the sprays. Let the showerhead soak in the solution for about ½ hour then rinse thoroughly. Brush off any remaining mineral deposits if necessary.
DO NOT USE the vinegar/water treatment on any finish other than Chrome.
To reduce mineral build-up, turn the handle to FLOOD position to let the water drain out after every use.
WARRANTY
Additional warranty information can be found at: www.speakman.com
5-1/2"
140mm
Model: S-3010 Max. Flow Rate: 2.5 gpm (9.5L/min) Min. Flow Rate: 2.0 gpm (7.6 L/min) @ 45psi
FOR USE WITH AUTOMATIC COMPENSATING VALVES RATED AT 7.6 L/MIN (2.0 GPM) OR LESS.
Model: S-3010-E2 Max. Flow Rate: 2.0 gpm (7.6 L/min) Min. Flow Rate: 1.5 gpm (5.7 L/min) @ 45psi
FOR USE WITH AUTOMATIC COMPENSATING VALVES RATED AT 6.6 L/MIN (1.75 GPM) OR LESS.
Model: S-3010-E175 Max. Flow Rate: 1.75 gpm (6.6 L/min) Min. Flow Rate: 1.3 gpm (4.9 L/min) @ 45psi
FOR USE WITH AUTOMATIC COMPENSATING VALVES RATED AT 5.7 L/MIN (1.5 GPM) OR LESS.
6"
152mm
3-1/8" 80mm
Specifications:
Inlet: 1/2” NPT FEMALE
Loading...