
INSTALLATION INSTRUCTIONS
SAVE THESE INSTRUCTIONS
WARNING! Fixtures must be grounded and installed in accordance with the National Electrical Code and all local codes. Failure to
do so may increase the RISK OF PERSONAL INJURY, PROPERTY DAMAGE, FIRE AND DEATH. Install and use where burnouts do
not cause a hazard and use only in environments for which the product is specifically marked.
WARNING! This product contains chemicals known to the State of California to cause cancer, birth defects, and/or other reproductive
harm. Thoroughly wash hands after installing, handling, cleaning, or otherwise touching this product.
CAUTION! Follow ALL luminaire recommendations, product markings, instructions, restrictions and warnings regarding lumninaire
operation and burning position. Luminaire label shows electrical and environmental requirements.
All electrical work must be done by a qualified electrician.
Turn off electric power to all affected circuits and allow to cool before servicing.
A regularly scheduled maintenance program should be established to retain optimum light output and reduce heat retention. Dusting
with a soft, clean, dry cloth is normally sufficient. Any accumulation of dust or dirt should be removed regularly from the lens. Use only a
mild soapy solution, DO NOT use alkaline or acid cleaners.
Carefully read these instructions before installing product. If you do not understand these instructions, before starting any work, contact
your Hubbell Lighting distributor or techsupport@hubbell-ltg.com or (864) 678-1000
Give instructions to facility owner/manager for future reference.
TEMPE RD.TEMPE SQ.FRESNO RD.FRESNO SQ.
701 Millennium Boulevard Greenville, SC 29607 (864) 678-1000
www.spaulding-ltg.com

INSTALLATION INSTRUCTIONS
SAVE THESE INSTRUCTIONS
LED BOLLARD LIGHT FIXTURES
(FN1, FN2, TMS, TMR)
WARNING: DISCONNECT POWER BEFORE INSTALLATION OR SERVICING
READ INSTRUCIONS CAREFULLY - FAILURE TO DO SO COULD RESULT IN
PERSONAL INJURY. RETAIN INSTRUCTIONS FOR SERVICING.
FIXTURE INSTALLATION
1. UNPACK LUMINAIRE AND CHECK FOR DAMAGE.
2. PLACE BASE OVER ANCHOR BOLTS.
SECURE BASE WITH WASHERS AND NUTS.
3. MAKE WIRING CONNECTIONS.
4. PLACE FIXTURE DOWN OVER BASE, LINING UP
THREADED HOLES IN BASE WITH COUNTERSUNK HOLES IN
FIXTURE HOUSING.
- LED LIGHT ARRAY CAN BE ADJUSTED BY LOOSENING
THREE MOUNTING SCREWS.
- ONCE LED LIGHT ARRAY IS POINTING IN THE DISERED
DIRECTION TIGHTEN MOUNTING SCREWS
B
BEFORE ENERGIZING LED MAKE CERTAIN THAT:
- LINE VOLTAGE CORRESPONDS TO BALLAST
- LED LIGHT ARRAY IS POINTING IN DESIRED DIRECTION.
LED RELAMPING INSTRUCTIONS
1. REMOVE CAP BY LOOSENING ALLEN SOCKET SCREW
AND SEALING WASHER.
3. DISCONNECT LED LEADS FROM BALLAST
4. REPLACE LED BOARDS BY REMOVING TWO MOUNTING
SCREWS FROM EACH BRACKET
5. REVERSE ABOVE PROCEDURE TO RE-ASSEMBLE
FIXTURE BEING SURE SEALING WASHER IS ON SCREW,
NOTE: HEAD OF SCREW WILL NOT BE FLUSH WITH TOP OF
HOUSING DUE TO SEALING WASHER. DO NOT
OVERTIGHTEN TOP ALLEN HEAD SOCKET SCREW.
C D
B 3X
C 2X
93036519_A
05/24/2011
701 Millennium Boulevard Greenville, SC 29607 (864) 678-1000
D
www.spaulding-ltg.com