Southbend ECX-2 General Manual

OPERATION SHALL BE BY:
Electrically heated steam boiler operating at 15 psi (103 kPa) and rated at:
24.0 kw (standard)36.0 kw42.0 kw48.0 kw
The steam boiler shall be equipped for operation on:
208 VAC, 3 Phase, 60 Hz230 VAC, 3 Phase, 60 Hz240 VAC, 3 Phase, 60 Hz
The controls shall be equipped for operation on 115VAC, 1 Phase, 60 Hz
OPTIONAL ITEMS AT EXTRA COST:
Solid state digital controlsAutomatic boiler blow down220 or 240 VAC, 1 Phase, 50 HzTwo water lines (boiler feed and condensate)De-lime piping assembly (DPA-1)Stainless steel frameCabinet size (36", 48")Stainless steel back on cabinetCalifornia State boiler code requirementCSD-1380 VAC, 3 Phase, 50 Hz415 VAC, 3 Phase, 50 Hz480 VAC, 3 Phase, 60 HzCorrectional package
ACCESSORIES:
Spray and rinse assembly12" x 20" x 2.5" perforated stainless steel pan12" x 20" x 2.5" solid stainless steel pan12" x 20" x 4" perforated stainless steel pan12" x 20" x 4" solid stainless steel panAdjustable flanged feetBall float trapWater in strainerSteam take-off kit
SPECIFICATIONS:
Shall be a Model
ECX-2
electric convection steamer with electric steam boiler. The steamer shall be constructed of satin finish stainless steel, type 304, with a cooking chamber of one-piece all-welded stainless steel. The doors shall have a removable inner liner of stainless steel with full perimeter gasket seal, an outer liner of one-piece all­welded stainless steel, and a positive lock and seal mechanism with spring release. The door opening shall be 10" x 14" (254 x 356 mm). The steamer shall be provided with removable stainless steel pan supports and a stainless steel drip trough connected to drain to collect condensate when door is opened.
The control housing shall be constructed of stainless steel with a full access removable panel. The controls shall include an illuminated on/off power switch. The timing of each compartment shall be independently controlled by a pilot ready light, a pilot cooking light and a 60 minute electric timer which sounds an audible signal at the end of the cooking cycle. Steam flow to the chamber shall be cut off when the door is opened during the cooking cycle and shall be reactivated when the door is closed.
The convection steamer shall be mounted on a cabinet base with full perimeter angle frame, reinforced counter and boiler mountings, electric boiler with controls, all stainless steel exterior, hinged doors and 6" (152 mm) stainless steel legs with adjustable bullet feet.
Model Compartments Capacity
ECX-2 2 4-12 Pans
Shown on Optional 36" Cabinet
Base and Digital Controls
ELECTRIC STEAMER
A Middleby Company
WITH
CABINET BASE
Job Item#
Form ECX-2
A Middleby Company
08/04 Printed in USA
Models:
10/01
IN (mm)
– Cold Water: 1/2" (13 mm).
– Drain: 2" (51 mm) IPS piped to open floor drain. No solid connection.
– Electrical connection: 1/2" (13 mm) conduit connection to controls. 2 Amps per compartment, 120-60-1 or 220-50-1.
– Steam Take-off Connection: 3/4" (19 mm) optional to operate adjacent equipment.
– Electric Power Connection to Boiler: Sized for at least 90°C per line.
SERVICE CONNECTIONS
DIMENSIONS
MODEL UNITS A B C D E F G H J K L M N O P Q R S T U ECX-2 inches 36 24 33 14 6 28 58 6 8 14 22 5 6 4 6 2 4 6 11 5
mm 914 608 838 357 152 711 1479 152 203 357 559 127 152 102 152 51 102 152 279 127
EP
208V 230V 240V 380V 415V 480V MODEL KW AMP KW AMP KW AMP KW AMP KW AMP KW AMP ECX-2 24 66.6 24 60.3 24 57.8 24 36.5 24 33.4 24 28.9
36 100.0 36 90.4 36 86.7 36 54.7 36 50.1 36 43.3 42 116.6 48 120.6 48 115.6 48 73.0 48 66.8 48 57.8
ELECTRICAL CHARACTERISTICS
ECX-2
Form ECX-2
INTENDED FOR COMMERCIAL USE ONLY.
NOT FOR HOUSEHOLD USE.
1100 Old Honeycutt Rd., Fuquay-Varina, NC 27526
www.southbendnc.com
Loading...