Solinst 408 SS, 408 PVC Operating Instructions Manual

408 1.66” (Pg 1) (#103060 )
High Quality Groundwater and Surface Water Monitoring Instrumentation
Operating Principles
When the Solinst Double Valve Pump (DVP) is placed in a well or borehole, water rises inside the pump and the twin tubes to static level. A Control Unit is used to deliver compressed gas to the pump. During the drive period the gas pushes down on the water column contained in the drive line tubing, closing the check valve at the base of the pump. This forces water up the sample line tubing.
A vent period, during which the gas is released, allows hydrostatic pressure to refill the pump and drive line with sample water. The top check valve prevents water in the sample line from falling back into the pump body. This pressurization and vent cycle is repeated manually or automatically as set by the timers on the Control Unit. The cycle may be regulated for purging or sampling.
1.66” Double Valve Pump Operating Instructions
Model 408 SS and PVC 1.66”dia.
Notes: 1. The maximum lift for stainless steel (SS) pumps is 500 ft.
(150 m), and 100 ft. (30 m) for the PVC model.
2. DO NOT exceed an operating pressure of 250 psi for the SS
model and 50 psi for the PVC model.
3. The pump has been decontaminated before leaving Solinst however, you may wish to decontaminate your pump before use. The pump should be decontaminated between wells.
4. Tube fittings are based on use of 3/8" drive line and 1/4" sample line. A 3/8" to 1/4" adaptor is also supplied,if dual 1/4" tubing is preferred.
5. Refer to the operating instructions in the lid of the Solinst Model 466 Control Unit for detailed pumping instructions.
Pump Operation
Portable: The Pump will be attached to skip-bonded, dual 1/4" OD LDPE tubing, mounted on a reel.
a) For the stainless steel model
, push the tubing inserts into the end of the tubing and into the drive and sample compression fittings of the DVP (the nuts of the compression fittings may have to be loosened before inserting the tubing). Tighten the nut 1-1/4 turns past finger tight for proper seal (see overleaf).
b) Lower the assembled DVP into the well, using a stainless steel
safety line. The Solinst Model 103 Tag Line can be used for this purpose.
c) Connect the supply line with the in-line dryer from the
compressed gas source to the Control Unit. The drive line connects from the Control Unit to the reel.
d) Attach a short (3 ft. or 1 m) length of 1/4" OD sample line to
the sample connector on the reel.
Dedicated:
The Pump will come with a roll of tubing to be cut to
length, as required, for attachment to a Wellhead.
a) Cut the tubing to desired length. See step a) above for tubing
connection instructions to the stainless steel Pump.
For the PVC
model, attach the 1/4" sample tubing to the compression fitting on the DVP and slide the 3/8" drive line tubing onto the barbed fitting and secure with the single ear Oetiker Clamp (see overleaf).
b) Attach the sample and drive lines to the appropriate Push
Fittings on the underside of the Wellhead.
c) Lower the DVP into the well, using a stainless steel safety line
if desired. If useful, attach the safety line to the suspension hook on the underside of the Wellhead. Push the Wellhead firmly onto the riser casing.
d) Attach a short (3 ft. or 1 m) length of 1/4" OD sample line to
the sample connector on the Wellhead. (See diagram at right for use of Push Fittings.)
e) Connect the supply line with the in-line dryer from the
compressed gas supply to the Control Unit. The drive line connects from the Control Unit to the top of the Wellhead.
f) For detailed pumping instructions, please see the Solinst Model
466 Control Unit Operating Instructions.
Double Valve Pump in Well
Air Compressor
or Cylinder
Tubing Reel
Sample Line
Drive
Line
Electronic
Control Unit
1/4" Push Fit Adaptor
1/4" Push Fit Adaptor
Suspension Hook
Drive Line Quick Connect
Portable Sampling Setup
Dedicated Wellhead Setup
Wellheads come with two Push Fit Adaptors so that either 1/4" or 3/8" tubing can be used, as preferred.
To attach tubing just push into Push Fitting. To release tubing push down on both sides of the Top Ring and pull tubing out.
0.7" (18 mm) Access Hole
3/8" Push Fit
Connector
3/8" Push Fit Sample Line Connector
®
Solinst is a registered trademark of Solinst Canada Ltd.
Supply
Line
Disassembly
1. Remove the Top Platen from the Pump Body and Riser. Remove the Pump Body from the Bottom Platen and slide it off the Riser.
2. Remove the Riser from the Valve Body, being careful not to lose the Check Ball.
3. Remove the Valve Body from the Bottom Platen, being sure not to lose the second Check Ball.
4. Remove the Filter Retainer from the Bottom Platen, and then remove the Filter Mesh from the Filter Retainer.
Decontamination
1.66" SS (PVC) Double Valve Pump
1/4" Sample Line
1/4" x 3/8" Compression
(108520)
Adaptor
Tubing Inserts for
3/8" ID, 1/4" ID
V-012
O-ring
100291
1/4" Eye Bolt
101717
3/8” Drive Line
Top Platen
103526 (103147)
V-124 O-ring
101133
Notes: 1. Always follow your local guidelines and standard protocols.
2. Do not use acetone on the O-rings.
1. Completely disassemble the pump.
2. Wash all pump components with phosphate-free soap or a detergent.
3. Rinse all components thoroughly with deionized water and dry.
4. Replace worn O-rings as necessary, and then reassemble.
Reassembly
1. Slide the Filter Mesh over the Filter Retainer until seated.
2. Thread the Bottom Platen onto the Filter Retainer until the O-ring is seated and the parts are finger tight.
3. Insert a PTFE/FEP Check Ball into the top of the Bottom Platen.
4. Take the Valve Body and insert into the Bottom Platen until the O­ring firmly seats.
5. Insert a PTFE/FEP Check Ball into the top of the Valve Body.
6. Insert the bottom end of the Riser (hole downward) into the Valve Body.
7. Slide the Pump Body over the Riser and thread onto the Bottom Platen.
8. Take the Top Platen and while lining up the top of the Riser into the centre of the Top Platen, thread the Pump Body to the Top
Note: With PVC Pumps there is the option of using a stainless steel
Platen.
weight threaded into the Filter Retainer to reduce bouyancy during operation. An optional Weight and Filter Retatiner Assembly ( part #105881) is available from Solinst.
Centre Rod (Riser)
103528 (103059)
Check Ball 3/8”
101399
V-012
O-ring
100291
Valve Body
103529
Check Ball 3/8”OD
101399
V-124 O-ring
101133
Bottom Platen
103525 (103146)
V-116 O-ring
103493
Filter Retainer
103581 (103514)
Pump Body
103522 (103142)
50 Mesh
Filter Screen
103603
Vyon Filter
for PVC Pumps
V-012
O-ring
100291
Stainless Steel and PVC Tubing Connections
Nut
Ferrule
Tubing
Tubing Insert
Compression Fitting Nut
(Ferrule inside)
Drive Tubing
Eye Bolts
Compression
Fittings
Barbed
Fitting
Oetiker
Clamp
408 1.66” (Pg 2) June 26, 2009 (#103060 )
35 Todd Road, Georgetown, Ontario Canada L7G 4R8
For further information contact: Solinst Canada Ltd.
Fax: +1 (905) 873-1992; (800) 516-9081 Tel: +1 (905) 873-2255; (800) 661-2023
Web Site: www.solinst.com E-mail: instruments@solinst.com
Top
SS
Platens
PVC
Note: Be careful not to lose the two pieces of the ferrule if
loosening or removing the nut from the compression fitting.
Loading...