I
Packing List
Quick Installation Guide
-Drill holes with φ10 drill. Depth: at least 60mm.
-Mark position of four holes.
-Tighten the expansion tubes. Screw the expansion screws.
-Match the inverter with the bracket.
-Overview of Mounting
- Screw the set screw on the left-bottom of inverter tightly.
- If necessary, costomer can install an anti-theft lock on the left-bottom of the inverter.
3.Insert AC cable into AC port through screw cap.
a.L-wire,N-wire connection
4. Connect the wire to the AC terminal in the inverter.
AC connectionsteps(AC cable size:refer to table1&table2):
1.Remove thetop-down cover.
2. Make AC wires.
Note: No need to connect wire on the X port by enduser!
60mm
12mm
b.PE wire connection
AC Connection
I Version inverter:EPSfunctioncanbeonlybeachievedautomatically.
E Version inverter:EPSfunctioncanbeachieved manually or automatically.
EPS wiring diagram
Do not required for Changeover Switch.
60mm
12mm
EPS connection steps:
Note: ConnectPEwire into PEport.
1. Make wires(EPS cable size: refer to the table below)
2. Insert EPS cable into EPS port through screw cap.
L
N
PE
L
N I
Note: The black cable( the I port ) has been wired
during the manufactory.
EPS Connection(for I version and E version )
+
-
B:Communication Connection Steps:
A:Power Connection Steps:
current of breaker>32A
Press down spring until it clicks audibly into place
The ne wire strands must be seen in the champer
wire strands
Battery Connection
Before connecting to battey, please install a nonpolarized DC breaker to make sure inverter can be securely disconnected during maintanance.
Batt ery bre aker
X1-Retro Fit 3.7KW-5.0KW
Mounting Steps
Cable
Micro-breaker
Model
4-5mm²
20A
X1-Fit-3.7-E
X1-Fit-3.7-C
5-6mm²
32A
X1-Fit-4.6-E X1-Fit-4.6-C
5-6mm²
32A
X1-Fit-5.0-E X1-Fit-5.0-C
table1. E Version & C Version
Model
Cable
Micro-breaker
X1-Fit-3.7-I
8-10mm²
50A
X1-Fit-4.6-I
10-13mm²
63A
X1-Fit-5.0-I
10-13mm²
63A
table2. I Version
4 6AWG AC terminals and 4 10AWG AC terminals for Version I 4 10AWG AC terminals and 4 8AWG AC terminals for Version E and Version C
AC terminal x8 *:
Inverter x1
Bracket x1
Expansion tubes x4 Expansion screws x4
Version I
Version E&C
AC terminal x8 *
Grounding nut x1 Set screw(for mounting) x1
Quick installation guide x1
Warranty card x1
User manual x1
Ring terminal (external) x1 Ring terminal (internal) x1 Gasket x1
Meter x1 Wifi module(optional) x1
Smart Plug(optional) x1
table. Cable and Micro-breaker recommended
+
-
Batt ery
E-BAR
PE
N-BAR
RCD
EPS Load
L L
I Versio n
RCD
Load
RCMB
L
L
N
EPS
AC
EPS breaker: 32A
RCD: type A
wired b y manuf actor
requi red for in stall ation
E Version Manual Required for Changeover Switch
E Version Auto Required for Changeover Switch
Please contact our sales for any compatible contactor purchase requirement .
+
-
Batt ery
E-BAR
PE
RCD
EPS Load
L
L
E Versio n
RCD
Load
RCMB
L
L
N
AC
RCD: type A
wired by m anufa ctor
requir ed for in stall ation
EPS
changeover device( DPDT)
EPS breaker: 32A
+
-
Batt ery
E-BAR
PE
RCD
EPS Load
L
L
E Versio n
RCD
Load
RCMB
L
L
N
AC
RCD: type A
wired by m anufa ctor
requir ed for in stall ation
EPS
Contactor Device
Contactor
EPS breaker: 32A
I Version
E Version
12mm
60mm
E VersionI Version
Batt ery co nnect ion dia gram
high-voltage lithium battery
CAN/ RS485
Nonpolarized DC breaker
Power connection
Communication connection
BMS PI N Deni tion
Battery connectors
(positive x1, negative x1)
EPS Cable
EPS breaker
5mm² 5mm²
25A 32A
Model
X1-Fit-3.7E X1-Fit-3.7I X1-Fit-3.7C
X1-Fit-4.6E X1-Fit-4.6I X1-Fit-4.6C
5mm²
32A
X1-Fit-5.0E X1-Fit-5.0I X1-Fit-5.0C
Voltage
Current[A]
32A
Model
Nominal voltage of DC breaker should be larger than maximum voltage of battery.
X1-Fit-3.7E X1-Fit-3.7I X1-Fit-3.7C
X1-Fit-4.6E X1-Fit-4.6I X1-Fit-4.6C
X1-Fit-5.0E X1-Fit-5.0I X1-Fit-5.0C
Communication interface bewteen inverter and battery is RS485 or CAN with a RJ45 connector.
1
8
BMS_CANH
GNDX X
BMS_CANL
Definition
2
3
4
5
6
7
8
1
PIN
BMS_485A
BMS_485B
GND
X X
Definition
CAN
Rs485
X
X
X
X
X X
When using RS485 protocol, please note that PIN2 must be disconnected.
X
N L
I
N
L
I Version
E Version
Note:Iport has been
wired during the manufactory.
I
I
PE
PE
I Version Auto Do not required for Changeover Switch
Step4:Insert one Rj45 side of the cable into BMS port inside of inverter and the other side into RS485 or Can port of the battery.
Step1: Disassemble the BMS/Meter cable gland.
Step2: Prepare a communication cable(without sheath)and insert the communication cable through the cable nut.
Step3:Assemble the cable gland and screw the cable nut.
The seal is used for waterproof. Please make sure it has been kept back.
EPS
CAN/GEN
LAN/DRM
Grid
WiFi
RF
BMS/Meter
Upgrade
+
PV1 PV2 BAT
+ +
- - -
ON
OFF
Earth Connection&Start Inverter
Earth Connection Steps(mandatory):
Turn on the AC switch, EPS switch and battery switch.
Make sure the external EPS contactor is connected well. (if needed)
Make sure the battery is connected well.
Make sure the meter is connected well.
Make sure all the AC wirings are completed.
Check the inverter is fixed well on the wall.
Startinverter
Inverter will start up automatically when the battery is dicharging. Check the status of indicators and LCD screen. The left indicator should be blue and the indicator screen should display the main interface.
Start Guide
Export control
Use Valu e:
1000 0W
>Mode Select
self use
Work Mode
> Mute: No Frequency: 50Hz
EPS system
>Rel ay1 Set ting >Rel ay2 Set ting
Relay Control
Export Control
English Deutsch Italian
Language
1.Set language
2017 ->06 <-06 10:19
Date time
2.Set date time
Coun try
VDE 0126
Safe ty
3.Set the safety standard
This f uncti on allo ws the in verte r able to c ontro l energ y expor ted to th e grid. There are user value and factory value. The factor y value is default which can not be charged by user. The user value setting by installer must be less than the factory value.
4.Set export control
5.Set work mode
There are 5 work modes for choice.
·Self use/
Remote Contol/·
·Back Up Mode/
·Feed in Priority/
·Force Time Use/
6.Set EPS system(For E & I Version only)
X1-Retro Fit inverter with E Version and I Version can work on the EPS mode. EPS parameters can be set as below.
- “Mute”means you can set the warning of system which has entered EPS mode.
- ”No”means there will be a buzzing and it is the default value.
- ”Yes”means you choose to shut down the warning function.
Besides ,if the buzzing is sharp, it means EPS output is over loads. “Frequency “here can be set 50Hz or 60Hz please based on correlative loads.
7.Set relay control(This function is being developed)
Relay Control is an optional function which can control designated load intelligently by consuming the surplus energy when feed in power reaches certain value. This function can only be achieved with solax product “Smart Plug”. For specific operation, please refer to “ Smart Plug user manual”.
Mete r conne ction d iagra m
Communication interface bewteen inverter and meter is RS485 with a RJ45 connector.
Mete r PIN De finit ion
X
X X
485A
485B X X X
1
2 3 4 5 6 7 8
1
8
Meter Connection
Mete r conne ction s teps:
Cabl e size: 12 AWG.
ring t ermin al
Sola X
mete r
+
-
Batt ery
DPDT
E-BAR
Main s witch
RCD RCD
PE
EPS Load
Inve rter
It allows external control device to make the inverters remote cluster control through LAN port on the inverter in this work mode.
Battery will stop discharing to keep higher capacity when the grid is on. Only when the gird is off and the power generated is not enough, battery will start to discharge to keep the emergency load working normally. This work mode applies to the area where suffering from blackout regularly.
The priority of inverter output power is: feeding to the grid supplying the load charging the battery. This work mode applies to the area with high feed-in tariff.
Self Use (default)
Force Time Use
Remote Contol
Back Up Mode
Feed in Priority
The external generator generated power will be used to supply the local loads firstly, then to charge the battery. The redundant power will export to the public grid. When there is no external generator supplied, battery will discharge for local loads firstly, and grid will supply power when the battery capacity is not enough.
In this work mode the charging and discharging time can be set flexibly, and it also allows to choose whether charge from the grid or not.
Parameter Comment
Electrical
grid
Home Electric meter,
Single phase
meter
Load
Meter connection
L
N
Monitoring Operation
614.00205.01
Solax provides two ways for users to choose: WiFi(optinal) and Ethernet(LAN)
Inverter provides a Wifi port which can collect data from inverter and transmit it to monitoring-website via a Pocket WiFi. (Purchase the product from supplier if needed)
Diag ram
Could
Router
WiFi Con necti on Step s:
Step3. Create an user account online.( Please check the Pocket WiFi user
manual for more details.)
Step 1. Plug Po cket Wi fi into “W iFi” port a t the bot tom of th e inver ter.
Step2. Build the connection between the inverter and router.
WiFi(optinal)
LAN
LAN Connection Steps:
LAN Po rt: The RJ45 p ort fro m right s ide Fourt h
LAN/ DRM Po rt
Communication interface bewteen inverter and router is RS485 with a RJ45 connector.
LAN P IN Def initi on
Appl icati on Occa sion
This function is appliable for the below situation: When the wifi signal is too weak to transmit data,user can use LAN port for the monitoring with a data cable. Note: The wifi module still needs to be connected when using LAN connection.
TX+
TX-
RX+
X X
RX-
X X
1
2
3 456 7 8
1
8
Could
Router
data cable
Please refer to BMS connection steps (for user manual page32) for LAN connection. Please kindly noted the PIN definition and port position will be slightly different.
Ethernet(LAN)
LAN communication is the standard communication interface. It can transmit the data between the router and inverter via the local network.
Please ensure the inverter is steadily powered on. Inverter must connect PV panels and keep the battery on through whole procedure of upgrading. Please prepare a PC and an U-disk.
Prepa ratio n
Warni ng!
Make sure the PV input power is more than 150V (operate the upgrade on a sunny day), otherwise it may result in serious failing during upgrading.If the upgrading is broken off during operation, please ensure the inverter is steadily powered on and reinsert the U-disk.
Step1. Please contact our service support to get the update les, and extract it into your U-disk as follow:
“update\ARM\618.00050.00_Hybrid_X1G3_Manager_VX.XX _XX-XX.usb”; “update\DSP\618.00084.00_Hybrid_X1G3_Master_VX.XX_XXXX XXXX”; (Note: Vx.xx is version number, xxxxxxxx is le complation date. Don’t modify the program le name, or it may cause that the inverter can’t work anymore!)
Upgr ading S teps:
Upda te
>ARM
DSP
Upda te(DS P)
Updat ing-- ----- --25%
Firmware Upgrading
Meter P ort: The f irst R J45 por t from ri ght sid e
Meter
Step3. Assemble the cable gland
and screw the cable nut.
Step4. Insert one side of Rj45 cable into Meter port inside of the inverter and the other side into RS485 port of the meter.
Step1. Disassemble the BMS/Meter cable gland. Step2. Prepare a communication cable(without sheath) and insert the communication cable through the cable nut.
The seal is used for waterproof. Please make sure it has been kept back.
EPS
CAN/GEN
LAN/DRM
Grid
WiFi
RF
BMS/Meter
Upgrade
+
PV1 PV2 BAT
+ +
- - -
ON
OFF
EPS
CAN/GEN
LAN/DRM
Grid
WiFi
RF
BMS/Meter
Upgrade
+
PV1 PV2 BAT
+ +
- - -
ON
OFF
Step2. Press the “Enter” key for 5 seconds to enter Off Mode. Then unscrew the waterproof lid and insert U-disk into the “upgrade” port at the bottom of the inverter.
Step3. The LCD will be shown as the picture below. Then press up and down to select the one that you want to upgrade and press “OK” to confirm to upgrade.
Step4. After the upgrade is finished, the LCD will display “succeed”(only for DSP upgrades), please remember to pull off the U-disk, screw the waterproof lid and press the “Esc” to return to the Main interface. Then press the “Enter” key to exit Off Mode.
Press the “Enter” key for five seconds to exit Off Mode.(The mode is factory defaulted as Off Mode)
Loading...