Tool Preparation
Quick Installation Guide
X1-Hybrid 3.0KW-7.5KW
Hammer drill(Bit φ10)
OT terminals press clamp
(0.5~6mm²)
Diagonal pliers
Crimping Tool
DC Voltage range ≥1100 V DC
Diagonal pliers
Hexagon keys
Marker
(Crosshead M5)Torque screwdriver
Utility knife
Rubber hammer
Euro terminal crimping tool
Socket wrench set(Hexagon)
Multifunction terminal crimping
tool (RJ45)
Tape ruler
Spirit level
X1-Hybrid G4
series inverter.
Waterproof connector
with RJ45*4/3(Meter/
DRM)
RJ45 terminals*1
Battery connection
terminals *1
Meter *1(Optional)
Note: “ ”attachments are not included in the M-series inverter attachment package and will be included in the X1-Matebox.☆
is the standard accessory in the M-series inverter and the optional accessory in the D-series inverter."▲"
“ ” The inverter in Australia needs to be connected to DRM, which is 1 more communication line adapter than that in other countries, while the other countries only need 2
☆
communication line adapters.
Packing List
Bracket
Waterproof cover*1
a ) Use a marker to mark drilling holes of the
bracket on the wall .
PV pin angle
(positive*2 , negative*2 )
☆
PV terminal
(positive*2 , negative*2 )
☆
☆
☆
☆
Mounting Steps
b) Drill holes at marked spots with depth of 80mm.
0. 00 m
8
m
c) Insert expansion bolt into the hole, use
rubber hammer to knock the expansion
screw bolt into the wall.
Expansion
a)
10AWG European
☆
terminals*2
8AWG European
terminals*3
Quick Installation Guide
*1
☆
☆
X1-Hybrid Series 3.0KW-7.5KW
M5 inner hexagon bolt*1
OT terminal*1
X1-Hy brid Us er Manu al
3.0kW - 7.5kW
EN
Warranty Card*1
Manual*1
(Expansion bolt ,Gasket,
Self-tapping bolt)*3
CT*1
Pocket WiFi*1
☆
▲
d ) The bracket is aligned with the screw uses
the inner hexagonal wrench to screw the
tapping screw until the expansion bolt
"bang" is heard.
Screw
Φ10 Hammer
drill
e) Hang the buckle on the inverter to the
corresponding position of the backplane.
b)
Rubber hammer
Torque :2.5±0.2N·m
c)
f) Use the inner hexagonal wrench to tighten
the inner hexagonal screw on the right side of
the inverter.
bolts
Hexagon keys
d)
e)
f)
(Torque :1.2±0.1N·m)
I
PV Connection
The PV port wiring of X1-H yb rid G4 M series inverter h as b een completed. On X1-Matebox, t he D s er ie s ne ed s to be wired according to
the fol lowing steps.
Step 1. Turn off the DC switch, connect the PV module, prepare a
12AWG PV cable, and find the PV (+) terminal and PV (-) terminal in
Step 2. Use a wire stripper to strip the 7mm insulation layer of the wire
end.
the package.
PV cable
PV pin
Wire stripper
Negative terminal
Positive terminal
m
m
0
.
7
Positive PV pin
Negtive PV pin
Step 3. The PV connector is divided into 2 parts, to the plug and the fastening head.Pass the cable through the fastening head and the
alignment plug.Note that the red and black lines correspond to different pairs of plugs.Finally, force the cable into the plug and hear a
"click" to indicate that the connection is complete.
Positive metal
terminal
Crimping Tool
Negative metal
terminal
Positive terminal
Negative terminal
Step 4. Tighten the fastening head and into inser t the corresponding p os it ive an d negative (PV-/PV+) ports of the inverter.
Positive
PV1+
PV2+
PV1-
Negative
PV2-
Grid and Off-grid Connection
Diagram A: Neutral line and PE line are separated from each other, and
the common load is connected to the off-grid port;(For most countries)
PV 1
BAT
Brea ker
Grid
PV 2
CT
Off- grid
Grid
Brea ker
Brea ker
RCD
off-g rid loa ds
N-BA R for off- grid lo ads
PV 1
PV 2
CT
Off- grid
Brea ker
RCD
Brea ker
Brea ker
Main B reake r
CT
RCD
Load s
N-BA R for loa ds
Main B reake r/RCD
CT
RCD
E-BA R
Brea ker
E-BA R
N
PE
Gri d
N
Gri d
X1- Hybrid G4
BAT
Brea ker
Bat tery
Diagram C : Ne ut ral line and PE line are combined togeter, and the
common load is co nn ec ted to t he o ff -grid port;(Apply to Australia)
X1- Hybrid G4
Diagram B : Ne ut ral line and PE line are separated from e ach other,
all loads connect to the Off-grid port;(For most countries)
X1- Hybrid G4
BAT
PV 1
PV 2
CT
X1- Mateb ox
Bat tery
Grid
Off- grid
Main B reake r
E-BA R
Load s
N-BA R for loa ds
Brea ker
Dis trbut ion Box
N
PE
Gri d
Diagram D : Ne ut ral line and PE line are combined together, al l
loads connect to the Off- grid por t;(App ly to Australia)
X1- Hybrid G4
BAT
PV 1PV 2
CT
X1- Mateb ox
Grid
Off- grid
Main B reake r
N
E-BA R
Gri d
I
Battery Connection
Battery connection diagram:
ON
OFF
Power line connection
Note:
When using SOLAX batteries,
the recommended number of
battery modules(HV10045/HV10063/HV10058) is
1-3 units, and battery controller MC0500unit.
Battery por t co nn ec tion line of the X1 -H ybrid G4 M series
inver ter is on the X1-Mateb ox, just connect it. I t is neces sa ry to
PV 1
PV 2
BAT
Non-polar
DC MCB
-
BMS
METER/CT
Upgrade
DONGLE
+
CAN
COM/LCD
DRM
Communication line connection
CAN/RS485
... ...
High voltage lithium battery
wire the D series acc ording to the followi ng s teps.
Step 1. Prepare 8 AWG battery power line , find the DC
plug (+), DC plug (-) in the accessory bag.
WG
8 A
BAT plug (+) BAT plug (-)
m
m
0
5.
1
Power line
Diagonal
pliers
Step 2. Insert the stripped cables into the DC plug (-) and DC Plug (+) respectively.
Spring
Cavity
DC plug (-) DC plug (+)
The cable must pass through here
Step 3. Press down on the spring by hand, you can hear a click sound, then push the
ends together, and tighten the screw joints.
Spring
Spring
Crack!
Step 4. Insert the battery power lines into the corresponding BAT port (+), (-) of the
inverter.
Note!
After the BMS communication between the battery
and the inverter is finished, the battery will work
normally.
Note: BAT port, not PV port!
Not e: The pos itive a nd nega tive
wir es of the b atter y are not
all owed to be rev ersed !
Bat tery
off-g rid loa ds
N-BA R for off- grid lo ads
Brea ker
Brea ker
Load s
N-BA R for loa ds
Bat tery
Load s
N-BA R for loa ds
Brea ker
Dis trbut ion Box
The Grid and Off-grid ports of X1-Hybrid G4 M series inverter have been connected, and the D series needs to be wired according to the following
steps.
Step 1. Prepare a Grid cable (three-core wire) and an Off-grid cable (two-core wire), and then find the European terminal and waterproof cover in
the accessory bag.
Grid( Triple Core Ca ble)8 AWG*3
Grid Cable and Micro-breaker recommended
Model
Cable (copper)
Micro-Breaker
Model
Cable (copper)
Micro-Breaker
X1-Hybrid-3.0-D X1-Hybrid-3.7-D X1-Hybrid-5.0-D X1-Hybrid-6.0-D
4-6mm²
X1-Hybrid-3.0-M X1-Hybrid-3.7-M X1-Hybrid-5.0-M X1-Hybrid-6.0-M X1-Hybrid-7.5-M
3-4mm²
25A 25A 32A 32A
Off-gri d( Doub le Core Cable) 10AWG*2
6-8mm²
3-4mm²
8-10mm²
50A40A32A
4-6mm²
8-10mm²
50A
4-6mm²
10AW G Euro Termin al*2
X1-Hybrid-7.5-D
8-10mm²
50A
6-8mm²
40A
Model
Cable (copper)
Micro-Breaker
X1-Hybrid-3.0-D
X1-Hybrid-3.0-M
Eur p Termi nal 8AWG * 3
Waterp roof cover
Off-grid Cable and Micro-breaker recommended
X1-Hybrid-3.7-D
X1-Hybrid-3.7-M
3-4mm²
25A 25A 32A 32A
3-4mm²
X1-Hybrid-5.0-D
X1-Hybrid-5.0-M
4-6mm²
X1-Hybrid-6.0-D
X1-Hybrid-6.0-M
4-6mm²
X1-Hybrid-7.5-D
X1-Hybrid-7.5-M
6-8mm²
40A
Step 2: The Gridand Off-grid cables go through the corresponding Grid and Off-grid ports of the waterproof cover. Remove the 12mm insulation
layer at the end of the wire. Insert the European-style terminals respectively, and make sure that the stripped ends are inserted into the
European-style terminal ,and finally use crimping pliers to press tightly.
mm
L
12
L=
Grid
Off-grid
GRI D
Off-gr id
L NPE L N
Grid
Off-grid
Torqu e screw drive r
( Torq ue: 0.2 ±0.1N·m )

Communication Connection(BMS/Meter/CT/DRM/COM)
x
Grounding Connection(manodatory)
Electric meter connection diagram
Grid
ON
OFF
L
N
Household Meter
PV 2
PV 1
BAT
Upgrade
DONGLE
Single-phase meter
Mete1
If the user has other power generation
equipment (such as inverters) at home
and wants to monitor both, X1-Hybrid G4
inverter provides Meter2 communication
function to monitor the power
generation equipment.For more
information, please contact SolaX.
CT con ne ction diagram
ON
PV 2
PV 1
OFF
BAT
Ø
COM PIN Definition
1
1
BMS
METER/CT
CAN
COM/LCD
DRM
Ø
The BMS pin is defined as follows:
Load
The DRM pin is defined as follows:
Ø
8
X
1
1
2
BAT_TEMP
8
1
8
GND
1 2 3 4 5 6 7 8
DRM1/5 DRM2/6 DRM3/7
3 4
2
X Vcc
3
BMS_CANH
GND
485A 485B
4
DRM4/8
5
5
BMS_CANL
+3.3V DRM0 GND
6 7 8
GND X X
6 7 8
BMS_485A BMS_485B
X
GND
Communicati on Connect io n Steps
Meter2
X1X1
Other power
Step 1. Prepare a communication cable, and then find the communication
adapter in the accessory bag.
The ground wire port of X1-Hybrid G4 M series inverter has been connected, and the D series needs to be wired according to the following steps.
Step 1. Prepare a one-core cable (12AWG), and then find the ground
terminal in the accessories.
12AWG
One-core cable (12 AWG)
OT terminal
Hexagon socket screws
Step 4. Find the ground connection port on the inverter, and screw the
ground wire on the inverter with an M5 Allen key.
Step 2. Strip the grounding cable insulation(lenhth”L2), insert the
stripped cable into the ring terminal, and then clamp it.
L1
L2=L1+3mm
Diagonal pliers
C
generation
equipment
Communication cable
Waterproof connector with Rj45
RJ45 terminals*1
Step 2 Insert the communication cable through the communication
Crimping Tool
Leaking cable
Hex agon keys
Torque: 1 .5±0. 2N·m
adapter, and peel off the outer insulation layer of15mm.
BMS
Meter/CT
Upgrade
Dongle
CAN
COM/LCD
DRM
Diagonal pliers
Monitoring Operation
Other power
generation
X1X1
equipment
Loads
Grid
L
N
Household Meter
Note:The arrow on the CT
must point at the public
grid.
Pub lic gri d
ele ctric ity
CT
L Line
CT 1
Meter/CT por t is at the
bottom of the inverter.
Mete r/CT
CT 2
If the user has other power generation equipment (such as inverters) at home
and wants to monitor both, X1-Hybrid G4 inverter provides CT2
communication function to monitor the power generation equipment.
LCD settings
To select CT, you need to enter Use setting ,then enter CT or Meter
Setting.
CT/Meter Setting
>Select
CT
Ø
Meter /CT PIN is defined as follows:
1
1 2 3 4 5 6 7 8
8
X
485A 485B X
CT2-1
CT2-2
CT1-2CT1-1
1) To connect the Communication line of the CT line, the lines need to be
made on both sides, connecting the RJ45 terminal on one side and the
Communication line Adapter on the other.
2) One side of the finished cable, Communication line adapter is inserted
into the inverter, and one side of the RJ45 terminal is inserted into the
CT connection.
Meter/CT
CAN
COM/LCD
distribution box
COM Communication
Dat a Read
Dat a Read
Dat a Wri te
Sma rt control dev ice
(de velop ing)
0mm
.0
5
1
Step 3. Insert the prepared communication cables into the RJ45 terminals
in sequence , and then use network cable crimping pliers to
press them tightly.
1) White with orange stripes
2) Orange
5
3
6 7 8
4
1 2
Multifunction terminal
crimping tool (RJ45)
3) White with green stripes
4) Blue
5) White with blue stripes
6) Green
7) White with brown stripes
8) Brown
Step 4. Tighten the completed Meter/CT/BMS communication line and
tighten the waterproof plug.
Step 5: Finally, find the corresponding COM/METER/CT/DRM poets on
the inverter and insert the communication cable into the corresponding
ports.
Meter/CT
Meter/CT
COM/LCD
Wireless monitoring accessories connection steps:
WiFi connection diagram
Ø
Ø
Step 1. Of the DONGLE port o f the inverter needs to unscrew the screw a nd t ak e off the
cover.
Solax Could
DONGLE
Router
Dongl e
Phi llips s crewd river
Torque: 1 .2±0. 1N·m
Step 2. Plu g th e Pocket WiFi Plus into the DONGLE port, use step 1 to remove the four screws an d ti gh ten it.
DONGLE
Phi llips s crewd river
Torque: 1 .2±0. 1N·m
NGLE
Start Guide
1.Set date time
Date time
2017 ->06 <-06
10:19
3.Set the safety standard
Saf ety
Cou ntry
VD E0126
5 .Set export control*
Export control
Export Control
Use Value :
100 00W
2.Set language
Language
English
Deutsch
Italian
4.CT/Meter Setting
CT /Mete r Setting
CT
Met er
6 .Set work mode*
Work Mode
>Mode Select
self use
7.X1-Matebox Setting
X1-Matebox Setting
>disable
enable
5*.Export Control
Thi s functio n allow s the inverter a ble to co ntrol
ene rgy exp or ted to th e grid.
There are user value and factory value. The factory
value is default which can not be charged by user. The
user value set by installer must be less than the factory
value.
6*.Set work mode
There are 4 work modes for choice. Self use/ Back Up Mode/ Feed in Priority/ Force Time Use
All these work modes is available for on-grid condition only:
Name
Self Use
Feed-in
priority
Backup
mode
Off-grid
Description
The s elf-u se mode i s suita ble for a reas wit h low fee d-in su bsidi es and hi gh elec trici ty pri ces.
① Whe n the pow er of PV is s ufficie nt
Act ive Cha rging o r Disch arge time pe rio d:PV wi ll powe r the loa ds rst ly, and su rplus p ower wi ll char ge to the b atter y .
If th e batte ry is fu lly cha rged, t hen sel l the sur plus po wer to the gri d;( The in verte r will li mit the o utput i f Feed- in limi t
or ze ro feed- in is nee ded ) (PV>L oa d ,PV →Load→B atter y → Grid )
② Whe n the pow er of PV is i nsuffic ient
Act ive Cha rging t ime per iod: PV w ill pow er the lo ads rs tly ,th e remai ning po wer will b e taken f rom the g rid , the
bat tery w ill n ot disc harge a t thi s time.( PV>Lo ad ,PV + Gr id → Load )
Act ive Dis charg e time pe riod: P V+BAT wi ll power t he load s toget her. If t he powe r is stil l not eno ugh, th e remainin g
pow er will b e taken f rom the g rid. (P V<Load ,P V + Batte ry + Grid → L oad)
③ Wit hout PV p ower
Act ive Cha rging t ime per iod: The g rid sup plies t he load s and als o can cha rge the b atter y.(PV =0 ,Gri d →Load + Ba tter y)
Act ive Dis charg e time pe riod: The bat tery w ill p ower the h ome loa ds rst ly.If t he batt ery po wer i s not e nough , the
rem ainin g power w ill be ta ken fro m the gri d .The in verte r will en ter int o the sta ndby st ate.(PV= 0 ,Ba tter y+Gri d→Loa d)
Bat tery m in SO C can be se t:10% -100% .
The Fe ed-in p rior ity mod e is suit able for a reas wi th high f eed-i n subsi dies, b ut has fee d-in po wer lim itati on.
①Whe n the pow er of PV is s ufficie nt
Act ive Cha rging t ime per iod :PV w ill pow er the lo ads rs tly, and s urpl us power w ill fee d-in to t he grid . If the fe ed-in
pow er has be en limi ted ,th e surpl us powe r can cha rge the b atter y. (PV>Loa d ,PV → Loa d → Grid → Ba ttery )
Act ive Dis charg e time pe riod: PV will p ower t he load s rstl y ,and su rplu s power wi ll feed -in to th e grid.
(PV<L oad ,PV → L oad → Gri d )
②Whe n the pow er of PV is i nsuffic ient
Act ive Cha rging t ime per iod :PV w ill pow er the lo ads rs tly, the r emain ing pow er will b e taken f rom the g rid. The
bat tery w ill n ot disc harge .(P V>Load,P V + Grid → Lo ad)
Dis charg e time pe riod: P V+BAT wi ll powe r the l oads to get her. If th e power i s still n ot enou gh, the r emain ing pow er will
be ta ken fro m the gri d. (PV<Lo ad ,PV + Ba ttery + G rid → Loa d)
③Wit hout PV p ower
Act ive Cha rging t ime per iod :Th e grid wi ll powe r the hom e loads a nd also c harge t he ba ttery .
(PV =0 , Grid → L oad + Bat tery)
Act ive Dis charg e time pe riod :T he batt ery wi ll po wer t he ho me load s rstl y .If the b atter y power i s not eno ugh,t he
rem ainin g power w ill be ta ken fro m the gri d .The in verte r will en ter int o the sta ndby st ate.(P V=0 , Bat tery +Grid → L oad)
Bat tery m in SO C can be se t:10% -100%
The b ack-u p mode is s uitab le for are as with f reque nt powe r outag es.Sa me work ing log ic with “Se lf-us e” mode .Thi s
mod e will ma intai n the bat tery c apa city at a r elati vely hi gh le vel.( Users ' setti ng) to en sure th at the em ergency lo ads
can b e used wh en the gr id is off. Cu stome rs no nee d to worr y abou t the bat tery ca pacit y.
Bat tery m in SO C can be se t:30% -100% .Back up mode S OC adju stmen t range : 30%-1 00%;I n Backup mo de,
SOC -min un der off- grid co nditi on is 10% , which c annot b e modi ed.
The o ff-gri d mode is u sed whe n the pow er grid i s off .Sys tem wil l provi des eme rgenc y power t hroug h PV and ba tteri es
to su pply po wer to th e house hold lo ads. (Ba tter y is nece ssray )
①Whe n the pow er of PV is s ufficen t
PV wi ll powe r the loa ds rst ly, and su rplu s power wi ll char ge to the b atter y.(PV>L oad ,PV → L oad → Bat tery)
②Whe n the pow er of PV is i nsuffic ient
The r emain ing pow er will b e taken f rom the b atter y.(PV<L oad ,PV → Lo ad)
③Wit hout PV p ower
The b atter y will p ower t he emer genc y loads u ntil th e batte ry reac hed the m in SOC, then th e inver ter wil l enter i nto the
idl e mode. (PV=0 , Batte ry → Load )
Don gle
Cover
ngl e
x
Start Inverter
Start inverter
After the inverter is checked, the inverter will take the following steps:
Ø
PV 1
X1-Hybrid G4
BAT
8
Bre ak er
Grid
PV 2
CT
Off-grid
Bre ak er
Bre ak er
RCD
CT
Main Breaker
E-BAR
RCD
PE
x
Firmware Upgrading
-In order to upgrade the firmware smoothly, if the DSP and ARM firmware needs to be upgraded, please note that ARM firmware must be upgraded
first, then DSP firmware!
-Make sure that this directory is completely consistent with the above table, do not modify the firmware file name,Otherwise, the inverter may not work!
-For X1-Hybrid G4, ensure that the PV input voltage is greater than100V (upgrade on sunny days). please ensure that the battery SOC is greater than 20%
or the battery input voltage is greater than 90V. Otherwise, it may cause serious failure during the upgrade process!
-If the ARM firmware upgrade fails or stops, please do not unplug the U disk and power off the inverter and restart it. Then repeat the upgrade steps.
Ø
Upgrade p reparation
1) Please check the inverter version and prepare a U disk (USB 2.0) and personal computer before upgrading.
2) Please contact our service support through service@solaxpower.com to obtain the firmware, and store the firmware in the U disk according to the
following path.
Update:
For ARM file:“update \ARM\618.00361.00_Hybrid_X1G4_ARM_V1.01.0710.usb”;
For DSP file:“update\DSP\618.00360.00_Hybrid_X1G4_DSP_V1.01.0710.usb”;
Ø
Upgrade s teps
N
Step 1. Please save the "Upgrade" firmware in your U disk first, and press the "Enter" button on the inverter screen for 5 seconds to enter the OFF
mode.
Step 2. Locate the "update" port of the inverter, use a flat-blade screwdriver or coin with the same width to remove the waterproof cover, and insert
Grid
the U disk.
Battery
Bre ak er
off-grid l oa ds
N-BAR for off-grid lo ads
Loa ds
N-BAR for loads
Bre ak er
Make sure that the inverter is fixed on the wall.
Ensure that all ground wires are grounded.
Confirm that all DC lines and AC lines are connected.
Make sure the CT is connected.
Make sure the battery is well connected.
Ensure that the external Off-grid contactor is well connected. (If needed)
Turn on the Load switch and Off-grid switch
8
Turn on thebattery switch.
Long press Enter for 5 seconds to exit the shutdown mode. Mode is the mode when it is
turned off for the first time; factory default: off mode)
Long press for 5
seconds
Flat-blade screwdriver or coin
(Port size: 12*2mm;
Torque: 1.5±0.2N·M)
Waterproof cover
U Disk
Step 3. LCD operation, enter the upgrade interface "update", as shown below(a): Please press the up and down keys to select ARM, then press the
bottom of the page to select "OK", press the enter key to enter the software version interface ;
Upd ate ARM Fi le
>A RM
DS P
Upd ate ARM
Can cel
>O K
(a)
(b)
Upd ate9( A RM)
>61 8.003 61.00 _Hybr id_
X1G 4_ARM _V1.01
071 0.usb
(c)
Upd ate ( ARM )
Upg radin g---- ----- 25%
(d)
Upd ate (AR M )
>A RM
DS P
(e)
Step 4. Please confirm the new firmware version again and select the firmware to upgrade. The upgrade takes about 20 seconds.(d) When it is
completed, the LCD screen returns to the "Update" page.
Upd ate Sel ectio n
AR M
>D SP
( f )
Upd ate DSP Fi le
>61 8.003 60.00 _Hybr id_
X1G 4_DSP _V1.01_ 07
10. hex
(g)
Upd ate(D SP)
con nect- ----- ---
(h)
Upd ate(D SP)
DSP E rasin g---- -----
(i)
Upd ate(D SP)
Upg radin g---- ----- 25%
(j)
Upd ate(D SP)
Upg rade Su ccess ful
(k)
614.00496.00