
Industrial 5-port Unmanaged
Ethernet Switch
Quick Installation Guide
快速安裝指南
工業
5
口非网管型以太网交換机
Rev1.0 by 2016 Mar

Rev1.0 by 2016 Mar2
Contents Of Packing
LED Indicators
Open the shipping carton and carefully unpack its contents. The
carton should contain the following items.
1. Industrial Unmanaged Ethernet Switch x 1
2. Quick Installation Guide x 1
IP120 / IP110 IS120 / IS110
1
2
3
4
5
RJ
SFP
1 2
43
PoE
PWR1
PWR2
PWR Fail
1
2
3
4
5
RJ
SFP
PWR1
PWR2
PWR Fail
Note
1. Visually inspect the power wire to make sure that it’s secured fully to
DC Power.
2. Make sure that there is proper heat dissipation and adequate
ventilation around the Switch.
3. Do not place any heavy objects above the Switch.
4. Users can check more technical specifications from
http://www.soarnex.com if necessary.

English
3 Rev1.0 by 2016 Mar
PWR1
PWR2Per
Device
PWR Fail
Link/Act
LED Per
Ethernet
Port
PoE
LED Per
PoE Port
(IP120/IP110)
Solid Light
Light off
Solid Light
Light off
Solid Light
Light off
Solid Light
Blinking
Light off
Solid Light
Light off
Power input PWR1 Power On
Power input PWR1 Power Off
Power input PWR2 Power On
Power input PWR2 Power Off
Lost power from one of the
power inputs
PWR1 and PWR2 power on
When there is a secure
connection (or link) to
device at Ethernet ports.
When there is reception
or transmission of data
occurring at Ethernet ports.
No link
Power feeding
No Power feeding
Green
Green
Red
Green
Green
Location Color Status Description
LED
Indicative
Upper panel
1. Grounding screw
2. Power 1 input terminal block
3. Power 2 input terminal block
4. Power fault alarm(normal open, 1A@24VDC)
DIP Switch
5. The default setting for DIP switch is RJ, Change the DIP switch to the
SFP position to support SFP modules.
6. The default setting for each DIP switch is OFF(RJ)
Dip switch
BSP
SFP / RJ
Jumbo
Setting
SFP
RJ
ON
OFF
ON
OFF
Description
Port 5 select SFP
Port 5 select RJ45
Enables broadcast storm protection
Disables broadcast storm protection
Enables jumbo frame function
Disables jumbo frame function

Rev1.0 by 2016 Mar4
Hardware Installation
DIN Rail Mounting
1. Insert the top of the DIN rail into the slot just below the stiff metal
spring.
1
Metal Spring
DIN-Rail
1
2
4
3
5
SFP
RJ
BSP
Jumbo
12/24/48
IP120 / IP110 IS120 / IS110

English
5 Rev1.0 by 2016 Mar
2. The DIN rail attachment unit will snap into place as shown below.
Metal Spring
DIN-Rail
3. To remove the DIN rail from the switch, simply reverse Steps 1 and 2.
Metal Spring
DIN-Rail
1
2

Rev1.0 by 2016 Mar6
Wall Mounting kit (optional)
1. Remove the DIN rail plate from the switch’s rear panel, and then
attach the wall mount plates, as shown in the figure.
Top Plate
2. Once the screws are fixed in the wall, insert the four screw heads
through the large parts of the keyhole-shaped apertures, and then
slide the switch downwards, as indicated. Tighten the four screws
for added stability.

English
7 Rev1.0 by 2016 Mar
FCC Warning
This equipment has been tested and found to comply with the limits for a Class A
digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to
provide reasonable protection against harmful interference when the equipment
is operated in a commercial environment. This equipment generates, uses, and
can radiate radio frequency energy and, if not installed and used in accordance
with this user’s guide, may cause harmful interference to radio communications.
Operation of this equipment in a residential area is likely to cause harmful
interference in which case the user will be required to correct the interference at his
own expense.
Changes or modifications not expressly approved by the party responsible for
compliance could void the user's authority to operate the equipment.
CE Mark Warning
This is a Class A product. In a domestic environment, this product
may cause radio interference in which case the user may be
required to take adequate measures.
Declaration of conformity
© Copyright SOARNEX Technology Corp. 2016
Contents are subject to change without prior notice.
Document is also available on SOARNEX Website
僅适用于海拔
2000
米以下地區安全使用

Rev1.0 by 2016 Mar8
產品包装
LED
指示燈
打開包装盒,仔細取出產品。
箱內應包含下列項目:
1.
工业級非网管交換机
x 1
2.
快速安装指南
x 1
注意
1.
仔細檢查电源,确保它是充分安全的直流电源
2.
确保交換机周圍良好通风散熱
3.
交換机上面請勿放置重物
4.
查看更詳細的技術規格:
http://www.soarnex.com
IP120 / IP110 IS120 / IS110
1
2
3
4
5
RJ
SFP
1 2
43
PoE
PWR1
PWR2
PWR Fail
1
2
3
4
5
RJ
SFP
PWR1
PWR2
PWR Fail

中 文
版本
1.0 2016年3
月
9
上圖
1.
接地螺絲
2. Power 1
端子输入
3. Power 2
端子输入
4. Power
失效警報(常開
, 1A@24VDC)
DIP
開關
5. DIP
開關默認设置為RJ,改变
DIP
開關到
SFP
位置以支持
SFP
模块。
6. DIP
開關默認设置為
OFF(RJ)
PWR1
PWR2
每个裝置
PWR Fail
Link/Act
每个以太网
端口
LED
PoE
每个
PoE
端口
LED
(IP120/IP110)
發光
燈滅
發光
燈滅
發光
燈滅
發光
閃爍
燈滅
發光
燈滅
PWR1
供電
PWR1
關閉
PWR2
供電
PWR2
關閉
一個電源失效
PWR1和 PWR2
正常供電
以太网端口安全鏈接建立
以太网端口數據傳輸中
無連接
PoE
供電
無
PoE
供電
綠色
綠色
紅色
綠色
綠色
位置 顏色 狀態 描述
LED
指示燈
Dip
開關
BSP
SFP / RJ
Jumbo
设置
SFP
RJ
ON
OFF
ON
OFF
描述
端口
5
選擇
SFP
端口
5
選擇
RJ45
支持
broadcast storm protection
關閉
broadcast storm protection
支持
jumbo frame function
關閉
jumbo frame function

版本
1.0 2016年3
月
10
硬件安裝
導軌安装
1.
將交換机卡規的頂部對准導軌的頂部然后將其卡入導軌內。
1
SFP
RJ
BSP
Jumbo
12/24/48
IP120 / IP110 IS120 / IS110

版本
1.0 2016年3
月
12
2.
螺釘被固定在墙壁上,通過的鎖眼形孔中較大的部分插入四个螺絲
头,然后向下滑动交換机,如圖所示。擰緊四个螺絲以增加穩定性。
29072466P1205S0
SOARNEX Technology Corp.
support@soarnex.com http://www.soarnex.com
墙上安装(可選
)
1.
取下交換机後面板的
DIN
卡簧,然后安装壁挂式安装板,如圖所示。
Top Plate