Snapper LE3191R (85661), LE3191R (7085661), LE3191E (85662), LE3191E (7085662), LE3190R (84560) Owner’s Manual

...
SET-UP INSTRUCTIONS and PRE-OPERATION CHECKLIST FOR
SNAPPER LE MODEL SINGLE STAGE SNOW THROWERS
The Snapper LE snow throwers are shipped with the upper handle folded forward, and with the discharge
chute and chute control handle detached. These machines are designed for quick set-up. No special tools are
required. Carefully follow and complete each step. Review and complete each item as instructed on the Pre-
Operation checklist. The Snapper Product Registration card must be filled out and sent to the Customer Service department at SNAPPER when completed.
STEP 1: Remove machine from shipping carton. Remove and discard cardboard from between all handles. The right
side of upper handle is positioned on the outside of lower
handle and should be moved to the inside of the lower handle. Eye of eye-bolt must be on right side of machine at
lower handle. Raise upper handle until the lower ends seat into concave area of lower handle. Tighten handle knowbs
securelly. Insert clean-out tool into holders on right handle. See Figure 1.
INSTALL CLEAN-OUT
TOOL
UNFOLD HANDLE
TIGHTEN
KNOBS
DISCHARGE CHUTE
/
/
CARRIAGE BOLTS
SLIDE DISCHARGE CHUTE
INSTALL LOWER
CHUTE HANDLE ONTO DISCHARGE CHUTE
LOWER CHUTE
/
/
HEX
FIGURE 1
STEP 2: Install lower chute handle onto chute with two
hex cap screws. Install chute/handle assembly onto discharge opening and secure with three carriage bolts and nuts. Tighten all nuts and bolts securely but, do not overtighten. See Figure 2.
STEP 3: Measure auger clutch control cable extension from a relaxed position to full extended position. Proper
extension should be between 1/2" minimum to 3/4"maximum extension. NOTE: Measure from the top of
spring (The top is in relation to where spring hooks into auger clutch control). Loosen jam nut at the upper end of
cable. Hold threaded end of cable and then turn cable clockwise until correct extension is achieved. Retighten
jam nut. IMPORTANT: DO NOT over tighten cable. The
cable must have slack for the auger brake to function
properly. See Figure 3.
1/2"MINIMUM
to 3/4" MAXIMUM SPRING EXTENSION
INSTRUCTION No. 7100948 (I.R. 6/26/2006)
FIGURE 2
AUGERCLUTCH
UPPER HANDLE
FIGURE 3
TP 300-5206-00-SX-SN
PRE-OPERATION CHECKLIST for SNAPPER
SINGLE STAGE SNOW THROWERS
Complete each of the following items prior to placing the machine into service. It is very important that setup is verified and all operational tests completed and results are acceptable. Check ( _ ) all items actually performed.
After completing this form, sign and retain for future reference.
SET-UP
__ UPPER HANDLE & LOWER HANDLE secured in place and hardware tightened securely.
DISCHARGE CHUTE and DEFLECTOR ASSEMBLY installed on snow thrower.
CLEAN-OUT TOOL attached to handle on snow thrower.
LUBRICATION
__ ENGINE OIL added to bring level up to full mark on 4-cycle engines (Refer to Engine Manual). __ OIL mixed with FUEL in specified ratio (2 Cycle Engines Only). (Refer to Engine Manual).
OPERATIONAL TEST
__ AUGER checked to insure stopping within 5 seconds after clutch control is released. __ ENGINE started, engine control settings checked and adjusted as needed.
FUEL SYSTEM checked for leaks around tank and connections. DISCHARGE CHUTE checked for free rotation.
__ AUGER CONTROL CABLE adjusted per instructions in the Operator's Manual supplied with machine.
CONSUMER INFORMATION
Purchase Date
Retailers Name
Address
MACHINE WILL BE USED COMMERCIALLY?
Purchaser's Name
Address
IMPORTANT: This form is to be retained for future reference regarding Warranty, proof of purchase, traceability for product recall or service, etc. Complete the Snapper Product Registration Card and Mail to Customer
Service Department at SNAPPER, P.O. BOX 1379, McDonough, Georgia, 30253.
Model Serial No.
City State Zip
YES NO
Signature
City State Zip
INSTRUCTION No. 7100948 (I.R. 6/26/2006)
TP 300-5206-00-SX-SN
Loading...