EN - COMMISSIONING REQUEST - INTERNATIONAL CUSTOMERS
19510098106-EN 1 of 3
COMMISSIONING REQUEST FORM - EXPORT
This form must be completed in full by the user client and sent via email, duly signed:
1. to the email address of your authorised Smeg dealer;
2. with copy to the address of the head office After-Sales department: service.instruments@smeg.it
During commissioning, the authorised engineer performs a series of checks using set company procedures to
ensure that the device is operating and has been installed correctly.
NOTES
SMEG Instruments devices may only be commissioned by Smeg Authorised Engineers.
The cost of Commissioning depends on the type of sales contract under which the device was purchased. Contact your
authorised dealer for any explanations required.
Please compile this form with the information requested about the utility systems available in the premises where the device
will be installed.
Free site inspections are not performed prior to installation.
The compiler is responsible for the information provided, which the engineer will use to avoid problems or impediments to
commissioning.
If the utility systems installed in the premises are not as declared, and the engineer is unable to perform commissioning
without the correct systems, any second visit will be charged for at the current tariff rates.
The customer is responsible for providing the utility systems necessary for installation.
Any changes to the utility systems available are the customer's responsibility and shall not be carried out by SMEG staff, who
are not legally authorised to install or modify electricity or water supply systems for third parties.
EN - COMMISSIONING REQUEST - INTERNATIONAL CUSTOMERS
19510098106-EN 2 of 3
TECHNICAL INFORMATION
[ Information regarding the model, code and Full SN is provided on the nameplate affixed to the device]
Specify the utility systems present in the installation premises.
Check that the utility systems provided are compatible with the model purchased.
ELECTRICITY SUPPLY SPECIFICATIONS
400V 3N~ / PE 50Hz (three-phase 400V 50Hz with neutral)
380-400V 3N~ / PE 50Hz 60Hz (three-phase 380-400V 60Hz with neutral)
230V 3~ / PE 50Hz (three-phase 230V 50Hz without neutral)
220-230V 3~ / PE 60Hz (three-phase 220-230V 60Hz without neutral)
230V ~ / PE 50Hz (single-phase 230V 50Hz)
220-230V ~ / PE 50Hz (single-phase 220-230V 60Hz)
208V 3~ / PE 60Hz (three-phase 208V 60 Hz without neutral)
208V ~ / PE 60Hz (single-phase 208V 60Hz)
DISTANCE OF ELECTRICAL CONNECTION FROM DEVICE
Check that the electrical connection point is in proximity to the planned device installation area, less
than 1 metre from one of the sides of the device.
ELECTRICAL POWER AVAILABLE FOR THE DEVICE
Specify the exact value [kW]
INSTALLATION WITH BASE - MACHINE SUPPORT (e.g. B6040, B9040)
Machine with support base [Y/ N].
Indicate the purchased base model [e.g. B6040].
__________________ [ Y / N ]
__________________ [ Base Model ]