Installation Instructions and Operation/Troubleshooting Manual
This control panel must be installed and serviced by a licensed
electrician in accordance with the National Electric Code NFPA-70,
state and local electrical codes. All conduit running from the sump
or tank to the control panel must be sealed with conduit sealant
to prevent moisture or gases from entering the panel. NEMA 4X enclosures are for indoor or outdoor use, primarily to provide a
degree of protection against corrosion, windblown dust and rain,
splashing water and hose-directed water. Cable connectors must
be liquid-tight in NEMA 4X enclosures.
The C-Level sensor is suitable for use in sewage applications.
Do NOT use in potable water.
Installation
Installer Friendly Series® (IFS) control panels are designed to control
pump(s). The controller records number of pump cycles, elapsed run
time, alarm counts, and signal error counts.
Warranty void if panel is modied.
Call factory with servicing questions:
1-800-RHOMBUS
(1-800-746-6287)
Manufactured by:
Mounting the Control Panel
Note: The control panel should not be mounted in a location that
may be subject to submersion.
1. Determine mounting location for panel. If distance exceeds the
length of either the sensor or oat cables or the pump power
cables, splicing will be required. Note: For splicing C-Level cord,
use only shielded cable. Splice conductors as well as shielding.
Maximum total cable length is 300 feet. For outdoor or wet installation, we recommend the use of an SJE Rhombus® liquid-tight
junction box with liquid-tight connectors to make required connections. You must use conduit sealant to prevent moisture or
gases from entering the panel.
2. Mount control panel with mounting devices furnished.
3. Determine conduit entrance locations on control panel. Check
local codes and schematic for the number of power circuits
required. (Sensor cable requires separate conduit from power
and pump cables.)
Note: Be sure the proper power supply voltage, amperage, and phase
meet the requirements of the pump motor(s) being installed. If in
doubt, see the pump identication plate for voltage/phase requirements.
4. Drill proper size holes for type of connectors being used.
Note: If using conduit, be sure that it is of adequate size to pull the
pump cable(s) through.
5. Attach cable connectors and/or conduit connectors to control
panel.
FOR INSTALLATION REQUIRING A SPLICE, FOLLOW STEPS 6-10;
FOR INSTALLATION WITHOUT A SPLICE, GO TO STEP 11.
Installation Instructions
6. Determine location for mounting junction box according to local code requirements. Do not mount the
junction box inside the sump or basin.
7. Mount junction box to proper support.
8. Run conduit to junction box. Drill proper size holes for the type of conduit used.
9. Identify and label each wire before pulling through conduit into control panel and junction box. Make wire
splice connections at junction box.
10. Firmly tighten all ttings on junction box.
11. If a junction box is not required, pull cables through conduit into control panel.
12. Connect pump wires per wiring diagram or schematic, and sensor or oat wires to the proper terminals as
shown on the schematic.
13. Connect pump, control, and alarm incoming power conductors to proper position on terminals. See schematic
for terminal connections.
VERIFY CORRECT OPERATION OF CONTROL PANEL AFTER INSTALLATION IS COMPLETE.
Installation of C-Level Sensor and Floats
WARNING : Verify C-Level™ and IFS panel are matched with CL40 or CL100. Using wrong sensor with panel will
cause settings to be incorrect.
CAUTION: If control switch cables are not wired and mounted in the correct order, the pump system will not function
properly. Sensor and oat cables need to run in separate conduit from pump and power lines.
Industry practices suggest that a secondary device, such as a oat switch, be used for redundant
activation of the high level alarm and pump shut o.
WARNING: Turn o all power before installing pump wires in pump chamber. Failure to do so could result in serious
or fatal electrical shock.
NOTE: The C-Level™ sensor operates between 0 and 39.9 inches of water pressure for the CL40 or between 0 and
99.9 inches of water pressure for the CL100. The C-Level™ sensor reads 0 inches at the approximate point shown
in Figure 2. As the liquid level rises, the IFS display shows depth of liquid from the zero point. The minimum set point
for the stop (demand) or redundant o (timed dose) level is 4 inches (measured from 0) see Figure 2.
The maximum set point allowed is 39 inches (measured from 0) for the CL40 or 99 inches (measured from 0) for the
CL100. Operating temperature range is 32ºF (0ºC) to 120ºF (50ºC).
1. Determine the nominal operating levels for the conguration, as illustrated in Figure 3 or 4.
2. Position C-Level sensor at appropriate location on pipe and secure sensor and vent as shown in Figure 2
using hose clamps.
WARNING: Do not support the C-Level sensor by the cable. Position the sensor in the tank so that nothing
is pushing in the diaphragm.
3. Position vent so it is above the water level and stow excess vent tube as shown in Figure 2.
WARNING: Do NOT kink or place black tubing under hose clamp. Doing so will cause sensor to fail.
4. If optional high water or redundant o oats are used, position and secure as shown in Figures 1, 3 or 4.
Redundant o oat should be located to activate at approximately the zero point for the C-Level per Figure
3 or 4.
NOTE: SJE Rhombus® recommends using the optional high water alarm oat for added protection against
ooding.
5. Tighten all hose clamps using a screw driver. Over tightening may result in damage to the plastic parts.
NOTE: All hose clamp components are made of 18-8 stainless steel material. See your SJE Rhombus® supplier
for replacement parts.
6. Functionally test the system by lling the tank and witnessing proper operation.
-2-
Installation Instructions
Figure 1
Figure 2
Figure 3 - Timed Dose
Figure 4 - Demand Dose
-3-
Operations
The Installer Friendly Series (IFS) control panel uses the C-Level sensor to continuously monitor and control
the liquid level in the tank. An optional high water alarm oat and redundant o oat can be used to provide
additional protection from high or low water conditions.
Hand Operation - The level must be above the stop/redundant o set point to put the panel in HAND operation.
To override the stop/redundant o set point, press and hold the HAND button. The pump runs until the HAND
button is released. The panel then returns to the AUTO mode. If the level is above the stop/redundant o set
point and the panel is placed in the HAND mode, and left in HAND mode, the pump continues to run until the
liquid level reaches the stop/redundant o set point. The panel then returns to the AUTO mode.
Off Operation - The panel is in the OFF mode.
Auto Operation - In time dose (t-dose) mode, when the panel is in the AUTO mode, the timer controls pump
ON and OFF time as long as the redundant o and timer enable set points are activated. In demand (d-dose),
the stop and lead set points control the pump.
Level Indicators- Illuminate if the corresponding set point is triggered.
Green Control and Alarm Power Indicators- (mounted on interior circuit board) Illuminates when
control power and alarm power is present. If the control fuse needs replacing the panel sounds an alarm.
LED Display - Used to view and set panel settings and cycle count data. Will turn o after ve minutes of
non-use.
Viewing Panel Settings and Cycle Data
To view panel settings and cycle data press the NEXT button. Each time the NEXT button is pressed the
display will advance to the next setting or cycle data. Information will be displayed in the following order:
in - Level of the liquid measured from the zero point on the sensor. This will be shown in inches or
centimeters depending on the units selected.
t-dOSE or d-dOSE – Identies if the panel is congured as a time dose or demand dose panel.
Et 1 – Elapsed time meter for pump 1 shown in hh:mm:ss.
CC 1 – Cycle count for pump 1.
AL 1Ctr – Cycle count for Duo Alarm 1 option for single phase models OR
Cycle count for Pump 1 Fail for three phase models and single phase models with overloads.
Et 2 – Elapsed time meter for pump 2 shown in hh:mm:ss (duplex only)
CC 2 – Cycle count for pump 2 (duplex only).
AL 2Ctr – Cycle count for Duo Alarm 2 option for single phase models OR
Cycle count for Pump 2 Fail for three phase models and single phase models with overloads.
AL-Ctr – Alarm counter which includes high water alarm, oat error alarm, and Duo Alarm 1 and 2.
FE-Ct – Float error counter which counts how many times the water level drops below the bottom of the
sensor and when the optional redundant o oat opens.
tO-Ct – Timer override which counts how many times the liquid level has reached the timer override set point
(time dose only).
On – On time currently set for the pump shown in hh:mm:ss (time dose only).
OFF – OFF time currently set for the pump shown in hh:mm:ss (time dose only).
t-OFF or t-On – Display counts down the OFF or On time remaining in the cycle (time dose only).
-4-
Operations
Programming Panel Settings
Entering the program mode:
Press and hold the SET button for 3 seconds until the “Prog” is displayed. The rst parameter that can be
set, along with its current value, will then ash on the display. You are now in the program mode.
Exiting the program mode:
At any point in the program mode push and hold the SET button for 3 seconds until run is displayed. The
display will then return to its normal state.
To change and set a parameter:
NOTE: While setting parameters the following conditions must be met or the display will show (ERROR):
LAg - level must be above LEAd for Demand Dose
LEAd - level must be above StOP for Demand Dose
StOP - level must be 4 inches or higher for Demand Dose
tO - level must be above tEnbLE for Time Dose
tEnbLE - level must be above rEdOFF for Time Dose
rEdOFF - level must be 4 inches or higher for Time Dose.
1. When in the program mode push the NEXT button until the desired parameter is displayed.
2. Push the SET button and the current value of that parameter will be displayed with the rst digit ashing.
3. Use the UP button to change the value of the ashing digit. When the desired value of the ashing digit is
reached, push the NEXT button to advance to the next digit. Use the UP and NEXT buttons to set the total
value of that parameter.
4. When done setting the parameter, push the set button and the parameter will ash along with its new value.
If an (ERROR) message is received, check above conditions to ensure all are being met.
5. Push the NEXT button to advance to the next parameter and follow steps 2 – 4 to set the values.
Parameters that can be set:
The parameters that can be set when in the program mode are:
For Time Dose Panels:
On – On time for pump in hh:mm:ss
OFF – O time for the pump in hh:mm:ss
ALtErn – Sets the alternation of the pumps. Settings are ALt, 2-1 and 1-2. (duplex panels only)
ALAr – High water alarm set point.
tO – Timer override set point
tEnbLE – Timer enable set point
rEdOFF – Redundant o set point.
UnitS – Units of measure can be set in inches (in) or centimeters (c).
For Demand Dose Panels:
ALtErn – Sets the alternation of the pumps. Settings are ALt, 2-1 and 1-2. (duplex panels only)
ALAr – High water alarm set point.
LAg – Lag pump start point. (duplex panels only)
LEAd – Lead pump start point.
StOP – Pump stop set point.
UnitS – Units of measure can be set in inches (in) or centimeters (c).
-5-
Operations
Selecting Time Dose or Demand Dose - Panels in the eld
To set the panel to either Timed Dose or Demand Dose in the eld:
1. Turn the control/alarm power o to the control panel.
2. Turn the pump power o to the control panel.
3. Place a small screwdriver or pen into the slot in the label on the inner door marked “DEMAND DOSE TIMED DOSE”.
•
• Move the dip switch (down) for Timed dose
4. Turn the control/alarm power on to the control panel. After the display goes blank press the “NEXT” switch.
• The display will show t-dose for timed dose.
WARNING: Changing the dip switch positions will change the operation of the panel.
WARNING: If changing to timed dose, be sure to set the o and on times.
5. Turn on the pump power after all the settings are changed.
6. WARNING: Check the panel for correct operation before leaving the site.
Move the dip switch (up) for demand dose
•
The display will show d-dose for demand dose.
Troubleshooting
C-Level Sensor
1. Verify that the black tube is not kinked or has any holes in it. If either condition exists, the pressure sensor
may fail or give inaccurate level readings.
2. Vent must be above water and unobstructed. This is required to compensate for barometric pressure changes.
Obstructing the vent will result in inaccurate level readings.
3. The black diaphram is located on the end of the sensor body. The diaphragm must not be damaged or
deformed. A damaged or deformed diaphragm will result in inaccurate level readings.
4. Verify the bottom of the C-Level Sensor is not resting on the bottom of the tank or on any other obstacle.
5. Verify that the electrical cable is not damaged or severed.
6. Verify that the shielding for cable is properly attached to ground.
7. If the panel includes the optional redundant o oat, verify that the oat is properly wired to the panel.
Fuse
To check the continuity of the fuse, pull the fuse out of the fuse holder. With the ohmmeter on the R X 1 scale,
measure resistance. A reading of innity (high resistance) indicates a blown fuse that must be replaced with
a fuse of the same type, voltage, and amp rating.
Alarm Light
With power on, hold the test/normal/silence switch in the “test” position. The alarm light should turn on. If not,
replace the light with that of the same type.
Alarm Horn
With power on, hold the test/normal/silence switch in the “test” position. The alarm horn should turn on. If not,
replace the horn with that of the same type.
-6-
NOTES:
SJE Rhombus® Five-Year Limited Warranty
Five-Year Limited Warranty.
For complete terms and conditions, please visit www.sjerhombus.com.
Products returned must be cleaned, sanitized, or decontaminated as necessary prior to shipment to ensure that employees
will not be exposed to health hazards in handling said material. All applicable laws and regulations shall apply.
NOTICE!
-7-
NOTES:
Technical Support: +1 800-746-6287
techsupport@sjerhombus.com
www.sjerhombus.com
Technical Support Hours: Monday - Friday, 7 A.M. to 6 P.M. Central Time
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.