6.07 Siemens Digital Telephone - DYAD Button Test 6-20
6.08 Siemens Digital Telephone - JR-DYAD
6.09 Siemens
6.10 Siemens Digital Telephone Displayable
6.11 Outgoing Trunk Test .
6.12 Placing Circuit(s) In-Service
6.13 Taking Circuit(s) Out-of-Service
7.CO Insta!lation
Powar
Inspeciion
DIP
Genera:or
Receiver
Button Test . . . . .
Characters . .
Supply Removal
...........................
Test
Voitnge
Test .................
Swiich
Settings ....................
........................
Test
I\!umbers
Test ........................
............................
...............................
Digiial
Telephone
Test Procedures Checklist
Guidelines
..................
..........
................
-DYAD
Display Test
.....
2-2
2-3
3-l
3-1
4-l
5-2
5-3
5-4
6-13
G-i3
G-14
6-14
6-15
6-16
6-19
G-22
6-24
6-25
6-26
6-27
6-27
7-l
SATURN
IIE
EPABX
installation Test Procedures
A30808-X5130-0120-l-0928
Issue 1, May
1986
.
1.01
Purpose. The equipment comprising the SATURN
(SATURN Ii-Expanded) System is
compleYely
tested at the fac-
IiE
tory prior to shipment. The inspections and tests covered in
this practice verify that the EPABX equipment has been
properly installed; ensure that no damage
wasIncurred
during transit; and confirm that the sysiem is completely operational. Table 1.00 defines the mnemonics usedthroughout
ihis
practice.
CAUTION
lnstalbtion
must be performed only by
1.02
tions which are presented in the sequential order of
mance
test procedures on the
SATL’RN I/E EPABX
Siemer;s cetiified
Sccpe.
This practice is
divided
into the following sec-
after initial installation of a SATURN
personnel.
IIE
System. When
per-for-
additional equipment is installed to an existing and active
SATURN
IIE
System, it is the responsibility of craft person-
nel to determine the sequential order of the test procedures
Electronic Private Automatic Branch Exchange
FDDFloppy Disk Drive
IRAM
LTU
LTUPS
Input Random Access Memory
Line/Trunk Unit
Line/Trunk Unit Power Supply
LEDLight-Emitting Diode
MCAMemory Control and Attenuation
MDF
MEM3
MEM4
MOS
Main Distribution Frame
25Gkb Memory
1Mb
Memory
Metal Oxide Semiconductor
MRAMaterial Return Authorization.
MSM
MTCE
00s
ORAM
PABX
Memory Support Module
Maintenance
Out-of-Service
Output Random Access Memory
Private Automatic Branch Exchange
PCBPrinted Circuit Board
PEN
PIMD
PSC
PSU
Port Equipment Number
Premium Instrument Module Digital
Parallel/Serial Converter
Power Supply Unit
a. Section
b. Section 2.00 - Preparatory
l.CO -
Introduction
Activiiy
c. Section 3.00 - Ground Tests
d. Section 4.00 - Power-Up Tests
e. Section 5.00 - Operating Program Loading
-
f. Section
g.
Section 7.00 -
On-Lina Diagnostic Tesis
6.80
lnstallaticn
Test
Procedures
Checklist
7.03
Siemens SATURN
numbers and dates for the SATURN
IIE Prac:iccs.
IIE
The practices, issue
EPABX are
lists3
in the
Practices Documentation Index A.30808~X5130-AlgO- * -E987 Al-
ways refer to the !aiest issue of the application
indcx
to ob-
tain the latest issue number of a practice.
724
Siemens
maintains a nationwide network
tact the Siemens regional
sistance
that may be
Cus;oma: Sqpsrt
cf
oifice
requked.
Services.
field
service
Sicrnons
offices. Con-
for any engineering
es-
DEFiN1TfON
lntarchange
i-i
SATURN
Installation Test Procedures
IIE
EPABX
Table 1.00 Mnemonics Used in This Practice (Continued)
[\fiNEMDNIC *
RAUPRemote Access Unit/Ports
.
RGENRing Generator
S-416
SLMA
SLMA-S
SLMD
SMXTG
SPC
SPG
TMBA-2
TMBA-4Four-Wire E&M Trunk
TMBM
TMIE
TMS
TSTAPP
TSTDIAG
TTY
UNA
ZUNAZoned Universal Night Answer
-48PS
Subscriber Line Module Analog - 16 lines
Subscriber Line Module Analog
Subscriber Line Module Analog - Station
Subscriber Line Module Digital
Signal Multiplexer/Tone Generator
Stored-Program-Controlled
Single Point Ground
Two-Wire E&M Trunk
Central Office Trunk
Direct Inward Dialing Trunk
Transmission Measuring Set
Test - Apparatus
Test - Maintenance Diagnostic
Teletypewriter
Universal Night Answer
-48Vdc
Power Supply
DEFINITION
l-2
(2 pages)
SATURN
Installation Test ProceduresIssue 1, May 1986
2.01
quired to perform the installation test procedures, handling
precautions for Printed Circuit Boards
ide Semiconductor (MOS) integrated circuits, guidelines for
removal and replacement of
initial visual inspection procedures.
2.02 Test Equipment Required. The following test equipment is required to perform the procedures contained in this
practice:
IIE
EPABX
General. This section describes the test equipment re-
(PCBs)
with Metal Ox-
PCBs
and powei supplies, and
a. Digital Multimeter. A digital multimeter of
mercial quality with an accuracy of + 1.0% or better.
The digital multimeter is used to perform the ground
tests and output voltage tests.
b.
Maintenance Test Phone. For both Dial Pulse (DP) and
Dual Tone Multifrequency
test set or a single line
(MTCE PHONE) is provided on the front
PSU for
equipped with a modular plug. When the maintenance
test phone is not equipped with a modular plug, a station appearance can be used via the Main Distribution Frame
to perform the on-line diagnostic tests.
c. Data Service Terminal. A Keyboard-Send-Receive
conneciing
(MDF).
The
(KSR) daia terminal equipped with a standard ASCII
keyboard and an EIA RS-232C interface (Silent 700
Series - Model 743 KSR - Texas Instruments, or
equivalent). The data service terminal is used to input
installation dependent data (i.e., system data base) into
system memory when the standard data base format
is supplied with the SATURN
(DTMF)
systems, a lineman’s
te!ephone.
the maintenance test phone when
mainienance
IIE
System.
gocd
com-
A modular jack
panal
of the
test phone is used
A30808-X5130-B120-l-8928
d. -Transmission Measuring Set. A transmission measur-
ing set (TMS) used to measure the transmission quality of a trunk or station (Hewlett Packard HP-355iA or
equivalent). Refer to the manual On-Line
Tests, Outgoing Trunk Test and Station Line
2.03 handling Precautions for
ed
Circuiklt
with MOS integrated circuits free themselves from electrostatic
charge by touching a grounded cabinet frame before handling
such
observe this practice may result in damage to
due to electrostatic discharge.
lirazardous
Be extremely careful when
incjtroubleshooting
panel(s) removed.
2.04
instances during testing, the corrective action for a procedure
in which the proper verification was not obtained requires that
a PCB or a power supply be removed and replaced with a
spare.
served when removing and
plies in an active
2.05
spection procedures contained in
to ensure that the equipment comprising the SATURN
tem has been properly installed and configured to meet the
installation requirements. Before proceeding
spections, the front, rear and side panels of the
be removed to
is important that craft personnel handling
PCEs,
or by wearing grounded wrist straps.
WARNING
voltages
PCB Removal and
Tablo
2.00 provides the guidelines that
lnifial Visual kspactizn Procedurx.
exist r&h.%
procedures
sysicm.
allcw
thorough inspection of the equipment.
PCBs wifh MCS Integmt-
the
eqo&ment
perr”orming fcsa-
with
P,ep!acemenZ Guide%%
rep!acing PCBs
Tab!e
2.01 must be
DiagnostiC
Failur:,
MO3 PCBs
cabins?.
the
oquipmcr;t
shou!d
and
powor SI:;X-
The
visu’al
psrfcrmcd
wiih
the visual in-
cabinei should
Tosl.
FCBs
to
In many
be
o!)-
in-
ItE
Sys-
2-1
-
Table
2.00 PC3 and Power Supply
I’AODIJLE ORSERVEC”
UNIT
CIOP
STATE
NA
CONF. NA
DTMF00s
FDDO,
FDDl
LTUC
LTUPS
f
l
NA
NA
NA
MCA
MEM3
MEM4
MSM
MSM
PIMD
PSC
PSU
RAUP
SLAl6
l
Baitery
lNA
kz
NA
NA
00s
NA
NA
NA
00s
SLMA-000s
SLMA-S
003
SLMD00s
SMXTG
TMBA-2
TMBA-4
TMBM
TMIE
-48PS.l
-48PSt
f
ES
00s
00s
00s
NA
NA
Remcval
Guidelines
A30808-X5130-8120-l-8928
Issue 1, May 1986
SPECIAL
INSTRUCTKWIS
Notes 1 and 2
Notes 1 and 2
Note 3
None
Note 4
Note 5
Notes 1 and 2
Notes 1 and 2
Notes 1 and 2
Note 1
Note 6
Note 3
Notes 1 and 2
Note 7
Notes 1 and 2
Note 3
Note 3
Note 3
Note 3
Notes 1 and 2
Note 3
Note 3
No?e
3
Note 3
Note 8
Noie 3
*
Optional depending upon customer/system requirements.
NA = Not Applicable;
00s =
Out-of-Service
Notes:
1.
System outage (halts call processing). Set BASIC PS circuit breaker on PSU to off.
2.
Open FDD and remove floppy disk before removing PCB. After new PCB is inserted, reinsert floppy disk, close
FDD, set
3.VVait
4.
Removal places one-half of ports in shelf out-of-service.
5.
Before removal, set related LTUPS circuit breaker on PSU to off. Removal places all ports in shelf out-of-service.
6.
Battery may be replaced with power applied to system.
7.
System outage (halts call processing). Before removal, set all circuit breakers to off, open
py disks. After replacement, reinsert floppy disks, close
on
8.
Set related circuit breaker on PSU to off. May halt call processing depending upon system configuration and
BASK
for in-process
CIOR
PS circuit breaker on PSU to on, and press reset switch on
ca!ls
i0
complete.
FDDs,
set circuit breakers to on, and press reset switch
CIOP
FDDs
and remove flop-
traffic. If there are two -48Vdc power supplies (where system includes an Expansion Cabinei), the remaining supply may have sufficient capacity to support system operation.
2-2
I
.-
SATURN
Installation Test Procedures
STEP
1
2
3
4
5
6
7
IIE
EPABX
Check that the cabinet ac power cord is not connected to an
electrical outlet.
Check that the -48Vdc power supply is strapped forSATURN
11OVac
or 22OVac.Procedures Practice (Section 4.00)
Check that all circuit breakers on the Power System UnitSATURN
(PSU) are in the OFF position and fuses inserted.Procedures Practice (Section 4.00)
If the MSM is installed, check that the Battery
connected but inserted into corresponding position. AlsoProcedures Practice (Section 4.00)
check that the PSU is strapped for MSM operation.
Check that each PCB in the system is withdrawn from its
backplane connector.
Check that the DIP switch settings for the
to meet the operating characteristics of the particular dataProcedures Practice (Section 4.00)
service terminal to be used to input the installation-dependent
data(i.e.,data
data base format is supplied with the SATURN
Check that each trunk-type PCB (i.e.,
and/or TMBA-4) is properly strapped according to theProcedures Practice (Section 4.00)
operating characteristics of the trunk facility of the Central
Office (CO) or distant PABX.
base) into system memory when the standard
A30808-X5130-B120-l-8928
Table 2.01 Visual Inspection
VISUAL INSPECTIONREFERENCE
IIE
EPABX Installation
IIE
EPABX Installation
Packk
is notSATURN
CIOP
board are setSATURN
IIE
System.
TMEM,
TMIE, TMBA-2SATURN
IIE
EPABX Installation
IIE
EPABX Installation
IIE
EPABX Installation
Issue 1, May 1986
8
Chec!c
that the intercabinet signal and power/ground cablingFigures 2.00 through 2.03
arrangements are complete and all connectors are firmly seated according to the referenced illustrations (Figures 2.00
through 2.03).
9
Check that Berg Clips are on pins 27 and 28 of unusedSATURN
signal cable connectors on basic shelf.Procedures Practice (Section 4.00)
IIE
EPABX Installation
2-3
I
I
SATURN
,xtallation
IIE
EPABX
Test Procedures
A30808-X5130-B120-l-5928
Issue 1, May 1986
w3w13
Figure
2.00
Signal Cable Distribution for the SATURN
IIE
System (Basic Cabinet)
-
SATURN
Installation Test Procedures
IIE
EPABX
A30808-X5130-B120-l-8928
issue 1, May 1986
W23
EXPANSION CABINET
\
W22
A5040-2.313186
I
--- ---
: ]
,
i;wi!
i-L--i--
FDD
1
:
-
_-__
LiTJ-. - -
-r-----
BASIC CA&NET
Figure 2.01Signal Cable Distribution for the SATURN
--
*
IIE
System (Expansion Cabinet)
2-5
SATURN
tnstallation
IIE
EPABX
Test Procedures
A30808-X5130-8120-1-8928
Issue 1, May 1986
LTUSO
LINE TRUNK UNIT SHELF
BASS
BASIC SHELF
J42
J43
El a----
J46
J47
E2
r JP
L
Jl
05039.1..wmG
2-6
Figure 2.02 Power/Ground Distribution for the SATURN
IIE
System (Basic Cabinet)
EXPANSION CABINET REF.
A30808-X5130-B120-l-8920
Issue 1, May 1986
A5U38-1-4:3:86
L
--M--e--\
----
------
BASIC‘CABINET REF.
Figure 2.03 Power/Ground Distribution for the SATURN
-----
IIE
System (Expansion Cabinet)
-,-,
2-7 (2-8 blank)
SATURN
IIE
EPABX
Installation Test Procedures
3.01
General. The SATURN HE System must be connected
to an earth ground (i.e., metallic cold water pipe or master ground
busbar)
in addition to the safety ground in the ac power cord.
A
G-gauge
(twisted copper wire) conductor should be connected between the grounding lug E5 located on the bottom of the
cabinet frame and the
snlccted
earth ground (refer to Section
3.00 in the SATURN HE EPABX Installation Procedures practice for details). The following tests must be performed to en-
extremely ca-ej’Ll
procedures with the equipment panel(s) removed.
3.02
System
Grcund
procedures indicated in Table 3.00, check that the earth
ground connections are secure and ground conductors are
firmly positioned on grounding lug E5 at
cabinet frame.
sure that proper earth ground connections have been
3.03
accomplished, and that ground connections within the cabinet
assembly have not been damaged or loosened during shipment.
WARNiNG
Hazardous
voltsgos txkt
within the equipment
csbinef. Ee
Shelf Ground Continuity Test. Each LTU shelf assembly within the cabinet assembly is grounded via two vertical
busbars.
Beiore proceeding with the test procedures indicated in Table 3.01, check that each shelf backplane is
netted
with the
busbar
position.
A30808-X5130-B120-l-8928
issue 1. May 1986
when performing
t~s%i~g/l’roubiesh~oting
Test. Before proceeding with the test’
ihe
bottom of the
flanges and adequately secured into
iniercon-
.l
2
3
4
STEP
1
Table 3.00
PROCEDURE
System
Ground Test
VERlFlCATlON
IF
VERlFlCATION
IS NOT OBTAINED
If connected, remove ac power cord
from commercial power outlet.
Short digital multimeter
tesi
leads
together and noie resistance of test
leads.
Set digital multimeter to lowest
resistance range and connect its
leads between the U-ground pin ofthe measured test lead resistance.
the ac power cord and the U-ground
socket in the commercial power
Resistance measured should beIf a reading greater
betweem
0 and 2 ohms greater thanobtained, the faulty ground
nection
must be isolated and
rected
befora continuing
installation test procedures
outlet (refer to Figure 3.00 for details).
Repeat procedure with second acSame as step 3 above.Same as step 3 above.
power cord if optional expansion
cabinet is incorporated into system.
Table 3.01 Shelf Ground Continuity Test
PROCEDURE
VERIFICATIONIF
VERIFICATiON
IS NOT OBTAINED
If connected, remove ac power cord
from commercial power outlet.
ihan
2 ohms is
wi?h
con-
cor-
the
2
Set digital multimeter to lowestResistance measured should beIf a reading
resistance range and connect itsbetween 0 and 1 ohm greater thanobtained, the faulty ground
leads between ground lug E5 locatedthe measured multimeter test lead
at the bottom of the cabinet frame,
and one of the
busbar/backplane
resistance.tinuing the installation test
tion must be corrected before
cedures.
attaching screws for each existing
LTU shelf (refer to Figure 3.01)
greator
than 1 ohm is
connec-
con-
pro-
3-l
SATURN
IIE
EPABX
A30808-X5130-B120-l-8928
Installation Test ProceduresIssue 1, May 1986
GND
LUG
(ES)
,
5,
hlatn Cabmel
(Rear View)
Recommended: B-gauge
(iwtsted
conductor not
Copper Wire)
exceedmg
i26
feet m length.
B D
BASIC Cabinet
Power co
PSU
El
El
I
(Ootlonall
f
Fuse Box Facility
llOVAC~$GOi-fZ
Neulral
Ground
3-2
I.1
f
Earth GroundNote: Single Point Ground (SPG) configuration IS shown
Master Ground
Busbar
Figure 3.00 System Ground Test Connections
SATURN
Installation Test Procedures
IIE
EPABX
Busbar/
Backplane
Attaching
Screws
-
Busbar
A30808-X5130-8120-1-8928
Issue 1, May 1986
Grounded at
GND
Lug
No. E5
’
7
-
Recommended: 6 Guage
(twisted copper wire) conductor
not exceeding 126 feet in length.
7
I(Rear
View)
Master Ground
Earth Ground
Note: Single Point Ground (SPG) configuration is shown
\
Power
Cord Plug
Busbar
Fuse Box Facility
I
L
---_
-I
Figure 3.01 Shelf Ground Continuity Test Connections
3-3 (3-4 blank)
I
-_
SATURN
installation Test Procedures
IIE
EPABX
SECTION 4.00 POWER-UP TESTS
4.01
tributed power in the equipment cabinet. Several power supplies are used in the system. These power supplies provide
voltage and message waiting voltage, from a
input power source. After satisfactorily performing the ground
tests
formed to ensure that proper power cable connections have
been accomplished and that the power supplies inside the
cabinet assembly have not been damaged during shipment.
General. The SATURN
+5Vdc, -SVdc, +12Vdc, -12Vdc, -48Vdc, 90Vac-20Hz
indicaied
YiEP
in Section 3.00, the following
PROCEDtJRE
f not previously done, extract each
‘CB
in the system from its
ive backplane connector in basic
md
LTU shelves.
Check
that
‘SU
311
fuses are inserted in their
,esponding
all
are in the off positions and that
locations.
IIE
System makes use of dis-
tests
Table 4.60 Power-Up/Output Voltage Test
respec-
circuit breakers on the
cor-
ringing
11OVac 60Hz
must be per-
A30808-X5130-BlZO-l-8928
WARNING
Hazardous
extremely
pmcedures
4.02
the test procedures indicated in Table 4.00, check that all pow-
er cable assemblies are properly secured into their corresponding locations. Note that the test procedures in Table 4.00 include
procedures for testing the optional MSM, when equipped in the
system.
VERIFICATION
voltages exist within the equipment cabinet.
careful
when performing
with the equipment panel(s) removed.
Power-Up/Output Voltage Tests. Before proceeding with
IF VERIFICATION
IS NOT
Issue 1, May 1986
Be
testin@roubkshootjng’
08TAlNED
Jsing the digital multimeter (or an
3c
polarity indicator), verify that the
:ommercial
Jsed
Iroper
Connect the
zommercial
?lace
on
the PSU to the on (up) position:
a) Basic PS
b)
c)
d) LTUPSO (if equipped)
e)
ac power receptacle
for powering the
polarity.
ac
the following circuit breakers
-48PSO
-48PSl
(if equipped)
LTUPSl
(if equipped)
systsm
has the
ac
power cord(s) to the
power receptacle(s).
9 LTUPS2 (if equipped)
If the optional MSM module is
equipped in the system, proceed
follows:
2)
If not previously done, connect
and insert battery pack into
the MSM assembly.
b)Press
the BATTERY TEST
switch on the PSU and
release after verification has
been obtained.
2s
‘olarity
indication must coincide with
=igures
3.00 and 3.01.
The associated green LED should
light steadily.
if polarity indication does not coincide, correct before proceeding with
the remainder of test in this
If the green LED remains
guished, the battery pack is below
acceptable voltage limits. Let MSM
charge battery pack and retry test after 30 minutes have elapsed. If green
LED remains extinguished, the battery pack is defective and requires
replacement.
lable.
cxtin-
‘l-1
SATURN
Installation Test Procedures
IlE
EPABX
A30808-X5130-8120-1-8928
issue 1, May 1986
SE?
8A
Table 4.00 Power-Up/Output Voltage
PROCEDURE
c) On the PSU, place the circuit
breaker designated BASIC PS
in the off (down) position.
d) On the PSU, place the circuitIf the red LED remains steadily lit,
1
breaker designated BASIC PSbe extinguished.either the cabinet ac power cord is
to the on (up) position.
7
Set digital multimeter to appropriate
dc voltage scale for the followingIf further troubleshooting information
tests.
To measure the unloaded basic shelf
input voltages, proceed as follows:
a) On basic backplane shown in
Figure 4.00, take reading be-tween
tween terminal El, E2, E3 orPSU. If still out-of-tolerance replace
E4 and ground.
b) On basic backplane connector
J46, shown in Figure 4.00, take
readings beiween pins 2 and 3.If fuse is good, replace -48PSO.
c) Set digital multimeter to
propriate
reading between pins 1 and 2IC fuse on PSU. If fuses are good,
of J46.
d) Set digital multimeter to appropri-
ate Vdc scale and take readings
between the following pins on
basic backplane connector J47
(shown in Figure 4.00):
1) Pins 1 and 3.
2) Pins 2 and 3.
e) On basic backplane connector
J48, shown in Figure 4.00, take
readings between the following
pins:
1) Pins 1 and 4.
2) Pin 2 or 3 and pin 4.
3) Pins 4 and 5.
Vat
scale and take
ap-
The red LED designated BATTERYIf the red LED remains extinguished,
TEST.should
The red BATTERY TEST LED should
Voltage measured should read
Voltage measured should read
tween -43 and -53Vdc.
Voltage measured should be
tween 75 and 100
Voltage measured should be between -4.9 and
Voltage measured should be
tween -43 and -53Vdccheck the -488 BASIC fuse on PSU.
Voltage measured should read
tween -11.3 and
Voltage measured should be
tween
Voltage measured should be
tween 4.85 and
VEfiIFICATION
be steadily lit.replace the MSM.
+4.5
and
+11.3
and
Test
(Continued)
+5.5
Vdc.just
Vat.
-5.2Vdc
-12.7Vdc.
+12.7Vdc.
5.15Vdc.
IF VERIFICATION
IS NOT OBTAINED
not connected to the commercial ac
power receptacle or a local ac power failure has occurred.
NOTE
is required during these testing
procedures, refer to SATURN
EPABXMaintenanceand
Troubleshooting Practice.
be-
If reading is not within tolerance,
+5V
ADJUST potentiometer on
PSU.
bo-
If reading is not within
check the
be-
If the voltage is not present, check
and replace RGEN fuse or RAC
replace RGEN PCB. If voltage still not
present, replace PSU.
If reading is not within tolerance,
replace the PSU.
be-
If reading is not within tolerance,
If the fuse is good, replace -48PS0.
be-
If reading is not within tolerance,
replace the PSU.
If reading is not within tolerance,
be-
replace the PSU.
be-
If reading is not within tolerance,
check that J16 on the rear panel of
the PSU is strapped to the MSM terminal. If the strap is in place, replace
the MSM.
-48P-BASIC
IIE
ad-
to!erance,
fuse in PSU.
BAS-
I
-
SATURN
Installation Test Procedures
STEP
813
IIE
EPABX
FROCEDUEE
f) Connect positive lead of digitalVoltage measured should read +If reading is not 0.05 Vdc, adjust
multimeter to pin 5 of
tor J48 and negative lead to
terminal El on basic
plane. (Refer to Figure 4.00.)
After satisfactorily completing step
8A,
proceed as follows to measure
the loaded basic shelf input voltages.
a) On the PSU, place the circuitThe MSM red LED designated
breaker
in the off (down) position.
b) Plug all previously extracted
PCBs
their respective backplane
connectors.
c) On the PSU, place the circuit
breaker designated BASIC PSTERY TEST should be extinguished.
in the on (up) position.
designa?ed BASIC
on the basic shelf into
lbb!c
4.00 Power-Up/Output Voltage Test (Continued)
VERIFICATIONIF VERIFICATION
connec- 0.05Vdc.
back-
PSTERY TEST should be steadily lit.
The MSM red LED designated BAT-
A3G808-X5130-B120-1-B928
Issue 1, May 1986
IS NOT OBTAINED
ADJUST potentiometer on PSU. If
adjustment is not effective, replace
PSU.
BAT-
.
+5V
d) Repeat measuring proceduresSame verification as in steps 8A a)
on basic backplane connectors
J46,
J47,
El-E4 as indicated in step
9A
To measure the unloaded LTU shelf
input voltages (if applicable), proceed
as follows:
a) On the LTU backplane con-
nector
4.01,take
the following pins:
1) Pins 1 and 3.
2) Pins 3 and 5.
3) Pins 3 and 4.
4) Set digital multimeter to
b) Set digital multimeter to ap-
propriate Vdc scale.
J48 and terminals
J42,shown
a reading between
read
Vat
tween pins 2 and 3.
in Figure
and connect be-
8A.
through e), except that
minal El should read between 4.85
and
5.15Vdc
under load.
Voltage measured should be
tween
+4.5
and
Voltages measured should be
tween -4.9 and
Voltage measured should be
tween -43 and -53Vdc.
Voltage measured should be be- If voltage isnot present,
tween 75 and
+5.5Vdc.
-5.2Vdc.
1OOVac.
-t-S!/&
at
ter-
be-
If reading is not within
just
+5V
LTUPS. If the adjustment does not
bring voltage into
LTUPS.
be-
replace appropriate LTUPS.
be-
verification reading, check the
check/replace RGEN fuse or RAC
ADJUST potentiometer on
tolerance,replace
If reading is not within tolerance,
If reading does not coincide with
LTU fuse on PSU. If fuse is good,
replace -48PS0.
LTUO fuse on PSU. If fuses are good,
replace PSU.
to!e:ance, ad-
-48P
C) On LTU backplane connector
J43,shown
a reading between the following pins:
in Figure 4.01, take
4-3
Loading...
+ 38 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.