![](/html/c3/c3a2/c3a212904ec16608e921947a135d12ab39a8ac1e981f84d2026214dafe54769b/bg1.png)
Level One Electric Vehicle Charging Station
Wall Mount
Product Guide
Model # WU-120
ShorePower Technologies
2351 NW York St.
Portland, OR 98664
503-892-7345
info@shorepower.com
www.shorepower.com
![](/html/c3/c3a2/c3a212904ec16608e921947a135d12ab39a8ac1e981f84d2026214dafe54769b/bg3.png)
Table of Contents
Warnings
Installation & Mounting
Usage
Maintenance & Cleaning
Troubleshooting
Features & Specifications
Accessories
Warranty
Other ShorePower Products
P.2
P.4
P.9
P.10
P.11
P.12
P.13
P.14
P.15
3
![](/html/c3/c3a2/c3a212904ec16608e921947a135d12ab39a8ac1e981f84d2026214dafe54769b/bg4.png)
Installation & Mounting
1. Using Diagram 1, mark
the mounting bolt pattern
on your mounting surface
2. Drill Pilot holes into the
mounting surface (Follow
the fastener recommendations as to the depth
and diameter of the pilot
hole. Different materials
will require different fasteners and pilot holes. I.e.
Steel, Concrete, Wood.
3. Install appropriate fasteners through each of the
four corners of the station
from inside the station.
See picture.
4
![](/html/c3/c3a2/c3a212904ec16608e921947a135d12ab39a8ac1e981f84d2026214dafe54769b/bg5.png)
4. Locate the wiring conduit
knockout at the base of
the charging station. Select which knockout to
punch by sizing against
your conduit diameter.
5. Remove the selected
knockout.
6. Insert the conduit pass
through hardware into
the knockout hole
5