TA1115
Bunk Loadguides for PT22S, PT22BS & PT22AS
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003336
REV A 7/20/06
ASSEMBLY AND INSTALLATION INSTRUCTIONS
Assembly Instructions
Break the bundles and sort all items. Locate the post load
guide weldments and position one on the rear cross member. Orient the weldment as shown in the diagram. Place two
– 3/8” x 2 7/16” x 4” U-bolts up around the cross member
and into the holes provided in the weldment. Secure with
3/8” ange lock nuts. Do not tighten. Repeat this process
with another post load guide weldment on the front cross
member.
Position the carpeted bunk on the outside of the weldments
just installed as shown in the diagram. Attach the bunk to
both the front and rear weldments using the bolts already
installed in the bunks. Secure to the weldments using 3/8”
lock washers and hex nuts.
Repeat the above process on the other load guide on the
other side of the trailer.
Adjustment
With the pontoon properly centered on the trailer slide the
load guides out until the are within ½” of the inside of the
pontoon tube. Tighten in position. Tighten the bolts attaching
the bunks to the weldments. This is a good starting point for
adjusting. They may need to be adjusted differently depending on the splash guard on the front of the pontoon tubes.
Unload and reload the pontoon to make sure they are ad-
justed to best t your pontoon. They can be repositioned to
best t your need.
Adjustment is complete.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003336
REV A 7/20/06