ShoreLand'r TA0165 User Manual

ACCESSORY
TA0165
Bunk Loadguide for PT1420 - PT1720 Models
ASSEMBLY AND INSTALLATION INSTRUCTIONS Assembly Instructions Break the bundles and sort all items. Locate the post load guide weldments and position one on the rear cross mem­ber. Orient the weldment as shown in the diagram. Place two – 3/8” x 2 7/16” x 4” U-bolts up around the cross member and into the holes provided in the weldment. Secure with
3/8” ange lock nuts. Do not tighten. Repeat this process
with another post load guide weldment on the front cross member. Position the carpeted bunk on the outside of the weldments just installed as shown in the diagram. Attach the bunk to both the front and rear weldments using the bolts already installed in the bunks. Secure to the weldments using 3/8” lock washers and hex nuts. Repeat the above process on the other load guide on the other side of the trailer. Adjustment
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0004039
Page 1 01/27/2009
With the pontoon properly centered on the trailer slide the load guides out until they are within ½” of the inside of the pontoon tube. Tighten in position. Tighten the bolts attach­ing the bunks to the weldments. This is a good starting point for adjusting. They may need to be adjusted differ­ently depending on the splash guard on the front of the pontoon tubes. Unload and reload the pontoon to make
sure they are adjusted to best t your pontoon. They can be repositioned to best t your need.
Adjustment is complete.
ShoreLand’r offers its product line in painted nishes. When ordering parts, it is important that you specify the nish or
color you have on your product. The 5-digit number along with a 2-digit space _ _, note that the parts can be purchased
in various nishes.
00........ Galvanized
03........ Black
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0004039
Page 2 01/27/2009
Loading...