TA0154-03
Side Rail Kit for 100” - PS4X8
The TA0154-03 side rail kit is to be used on the side frames of the PS4x8 model trailer. The side rail tubes are designed so that there is
no right or left part and no front or rear. They can also be mounted on either the inside or the outside of the side frame. Mounting the side
rails on the inside of the frame will be the most eye appealing and is the most desirable position when installing a front shield on a trailer
with the side rails.
Assembly Instructions
1. Break the bundle and sort all items by size.
Determine whether the side rails will be mounted on the inside of the frame as shown in Picture A or on the outside as shown in Picture B.
2.
Inside Frame Mount (Picture A)
1. Place a side rail on the trailer so the mounting channel is between the deck planks as shown in Picture A making sure the
front of the side rail tube is positioned correctly with respect to
the front of the trailer.
2. Place one of the 3/8” x 3 7/16” x 3” square U-bolts around the
frame as shown. Insert the legs of the U-bolt through the mating
holes in the channel. Place a 3/8” at washer, lock washer and
hex nut on each leg of the U-bolt. Thread the nuts on until all
excess U-bolt length as been threaded through the nut.
3. Repeat step 2 on the rear side rail channel.
4. Tighten the U-bolts securing the side rail to the side frame of the
trailer.
5. Repeat the above steps on the remaining side rail.
6. Assembly is complete.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003965
1. Place a side rail on the outside of the trailer side frame so the
front of the side rail is positioned correctly with respect to the
front of the trailer.
2. Place one of the 3/8” x 3 7/16” x 3” square U-bolts around the
side frame between the deck planks as shown in Picture B. Insert the legs of the U-bolt through the mating holes in the chan-
nel. Place a 3/8” at washer, lock washer and hex nut on each
leg of the U-bolt. Thread the nuts on until all excess U-bolt has
been threaded through the nut.
3. Repeat step 2 on the rear side rail channel.
4. Tighten the U-bolts securing the side rail to the side frame of the
trailer.
5. Repeat the above steps on the remaining side rail.
6. Assembly is complete.
Outside Frame Mount (Picture B)
05/30/2008
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003965
05/30/2008