SLV30BLW
SLV30BLW Bundles Required:
4300238 ST215/75R14C MR Tire/TS Dir Rim ...........2
(or)
4300239 ST215/75R14C MR Tire/Galv Dir Rim ........ 2
66520 Bag with Chains, No Coupler .....................1
62340 Literature Bag - Trailers ..............................1
80321-- Frame Bundle - 2X4W V30BLW ................1
66996-- Tongue Assembly 55”, W/UFP Actuator .....1
ShoreLand’r offers their product line in either galvanized or
painted finish. When ordering parts it is important that you
specify the finish or color you have on your product. The five
(5) digit number along with a two (2) digit space _ _, note the
parts which can be purchased with various finishes. When
ordering these items use the five (5) digit number along with
a two (2) digit suffix for the proper finish.
00 .........Galvanized
01 .........Arctic White
03 .........Black
33 .........Galvanized w/Black Plastic Parts
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003435
Page 1
Table of Contents: Page
Frame Drawing & Bill of Materials ................................2-3
Safety Instructions ........................................................ 3
Bunk Assembly Instructions .........................................3
Tongue & Safety Chain Dwg/BOM. ..............................4
Tongue & Safety Chain Assy Instr. ...............................5
White Ground Wire/Brakeline Assy Instr ......................5
Profile 2000 Winch Dwg/BOM/Assy Instr. ...................6-7
Tire Size & Carrying Capacity Chart ............................. 8
Chassis Drawing & Bill of Materials ..............................8-9
Spring Assembly Instructions .......................................9
Axle Assembly Instructions ........................................... 9
One Axle Brake Installation Instr ..................................9
Tire & Wheel Assembly ................................................10
Trailer Adjustments ....................................................... 10
Axle Adjustments ..........................................................10
Rear Support System Adjustment ................................10
Bunk Adjustment ..........................................................10
Front Bunk Support Adjustment ...................................10
Winch Post Adjustments ............................................... 10
Diagram A
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003435
Page 2
FINAL ASSEMBLY INSTRUCTIONS
Remove the hardware bag from the frame, remove parts
and sort by size.
V-SERIES BUNK ASSEMBLY
Position the bunks onto the brackets already installed to the
cross members. Attach the adjustable bunks to the bunk
brackets using 3/8” x 1” hex bolts and hex flange lock nuts.
The 3/8” bolts just installed can be tightened but not over
tightened because the bunks must be allowed to rotate
slightly to conform to the boat bottom once the boat is set
on the trailer.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003435
Page 3