ShoreLand'r SLV2313BLW User Manual V.1

®
SLV2313BLW
SLV2313BLW Bundles Required:
ST185/80R13C Tire/TS Dir Rim .................2
(or)
ST185/80R13C Tire/Galv Dir Rim ..............2
66520 Bag with Chains, No Coupler .....................1
69082 Literature Bag - Trailers - Brakes................1
80317-- Frame Bundle - 2X4W V2313BLW ............1
66996-- Tongue Assembly 55”, W/UFP Actuator .....1
painted nish. When ordering parts it is important that you specify the nish or color you have on your product. The ve
(5) digit number along with a two (2) digit space _ _, note the
parts which can be purchased with various nishes. When ordering these items use the ve (5) digit number along with a two (2) digit sufx for the proper nish.
00..........Galvanized
01..........Arctic White
03..........Black
33..........Galvanized w/Black Plastic Parts
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003415
Page 1 REV A 10/13/06
Table of Contents: Page
Frame Drawing & Bill of Materials ................................2-3
Safety Instructions ........................................................ 3
Tongue & Safety Chain Dwg/BOM. ..............................4
Tongue & Safety Chain Assy Instr. ...............................5
White Ground Wire/Brakeline Assy Instr ......................5
Prole 2000 Winch Dwg/BOM/Assy Instr. ...................6-7
Tire Size & Carrying Capacity Chart .............................8
Chassis Drawing & Bill of Materials ..............................8-9
Spring Assembly Instructions .......................................9
Axle Assembly Instructions ...........................................9
One Axle Brake Installation Instr ..................................9
Tire & Wheel Assembly ................................................9
Bunk Dwg/BOM / Assembly Instructions ...................... 10
Trailer Adjustments ....................................................... 11
Axle Adjustments ......................................................11
Rear Support System Adjustment ............................11
Bunk Adjustment.......................................................11
Front Bunk Support Adjustment................................11
Winch Post Adjustments ...........................................11
Diagram A
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003415
Page 2 REV A 10/13/06
Refer to your ShoreLand’r Owner’s Guide and other decals on trailer for
additional information.
SAFETY INSTRUCTIONS
4810709
Proper tongue weight must be maintained.
Rev C 8/28/06
Before towing, check the following to ensure that:
1. All parts, bolts, nuts and wheel lug nuts are tight.
2. All wheel lug nuts must be tightened to a minimum torque rating of 85 ft/lb.
3. Lug nuts must be re-torqued after the first 50 miles, then periodically there after.
4. Tires are inflated to manufacturer’s standards. (See tire sidewall)
5. Wheel bearings have adequate grease.
6. Hitch ball is the proper diameter and has a rating equal to or greater than the GVWR of the trailer.
7. Coupler is properly attached and secured to coupler ball.
8. Trailer safety chains are crossed under the tongue and attached to towing vehicle.
9. All lights are operational. Note: It is recommended that the trailer lights be disconnected before backing into the water.
10. Tie downs, winch strap and bow­ eye safety chain are secure.
11. Trailer tongue jack is in up or travel position.
FINAL ASSEMBLY INSTRUCTIONS
Remove the hardware bag from the frame, remove parts and sort by size.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003415
Page 3 REV A 10/13/06
Diagram B
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003415
Page 4 REV A 10/13/06
Loading...
+ 8 hidden pages