ShoreLand'r SLRB46TBBLSP User Manual

®
SLRB46TBBLSP
Bundles Required for SLRB46TBBLSP
69082 Literature Bag - Trailers - Brakes 1 80474-- Frame Bundle - 2X5 - RB46TBBLSP 1 4300236 ST185/80R 13C MR Tire / TS Dir Rim 4 67178-- Tongue Assembly w/UFP Disc 5x3x65 1 6238600 Rocker Bag - Tandem 1 66520 Bag w/Chains - No Coupler 1 68712 Bunk Assembly RB Short 1 66541 Brake Kit Tandem Axle Connection 1
Table of Contents: Page
Frame Drawing & Bill of Materials ................................2-3
Safety Instructions ........................................................3
Tongue & Safety Chain Dwg/BOM/Assy Instr. ..............4-5
SP Winch Dwg/BOM/Assy Instr. ...................................5-7
Tire Size & Carrying Capacity Chart .............................8
Spring Assembly Instructions ....................................... 8
Chassis Drawing & Bill of Materials .............................. 8-9
Axle Assembly Instructions ...........................................9
ShoreLand’r offers their product line in either galvanized or painted finish. When ordering parts it is important that you specify the finish or color you have on your product. The five (5) digit number along with a two (2) digit space _ _, note the parts which can be purchased with various finishes. When ordering these items use the five (5) digit number along with a two (2) digit suffix for the proper finish.
00 .........Galvanized
01 .........Arctic White
03 .........Black
33 .........Galvanized w/Black Plastic Parts
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003568
Page 1
Tire & Wheel Assembly ................................................9
Bunk Assembly Instructions .........................................10
Trailer Adjustments .......................................................10
Axle Adjustments .......................................................... 10
Winch Post Adjustments ...............................................10
Diagram A
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003568
Page 2
FINAL ASSEMBLY INSTRUCTIONS
Remove the hardware bag from the frame, remove parts and sort by size.
RB SERIES
The RB bunk system comes pre-assembled from the factory. Break the bundle and center one of the RB bunk systems on the rear pivot cross member of the frame. Locate two ½” x 3 9/16” x 3 7/8” U-bolts. Slide a U-bolt up around the rear pivot cross member, align the legs of the U-bolt with the holes in the mounting plate of the RB bunk support tube. Insert the U-bolt through the holes and secure with ½” flange lock nuts. Repeat on the second U-bolt. Tighten the lock nuts only enough to hold in position. They will have to be re­adjusted when the boat is placed on the trailer.
The short stabilizer bunk is installed to the adjustable bunk bracket on the front cross member with a 3/8” x 1” hex bolt and lock nut. (See Diagram A, Detail B.)
Repeat the above process on the bunk on the other side of the trailer.
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028 www.shorelandr.com 0003568
Page 3
Loading...
+ 7 hidden pages